Granada Gold applies for Granada Project drill permits, Quebec

Original announcement by resourceworld on

Company
Granada Gold Mine Inc.
Ticker
GGM
Exchange
Unavailable
Region
Quebec
Primary commodity
Gold
Secondary commodities
None reported
Document categories
Permitting, Resource update, Other
Extracted
2026-10-08 16:17:00 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Granada Gold Mine Inc. has applied for drill permits at its 100%-owned Granada Gold Project in Quebec to conduct infill and exploration drilling. The company's 2026 mineral resource estimate reports 890,600 ounces of gold in measured and indicated categories and 865,500 ounces in the inferred category.

Reasoning: The company is moving toward renewed drilling activity via permit applications to expand or confirm its existing gold resource.

Positive factors

  • Permit application for drilling to test extensions
  • Existing resource delineated over 2km
  • NI 43-101 technical report supports estimate

Negative factors

  • Drilling is subject to financing and contractor availability

Facts used in scoring: 2

Classification and evidence

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: The estimate is supported by an amended NI 43-101 technical report.

Evidence · text

“supported by the amended NI 43-101 technical report dated September 9, 2026”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Claude Duplessis, PEng, is named as the independent qualified person.

Evidence · text

“prepared by independent qualified person Claude Duplessis, PEng”

Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

Resource Estimates (2)

indicatedGranada Gold Project · goldTonnes: 15982000Grade: 1.73Grade Unit: g/tContained Metal: 890600Contained Unit: ozView all details
Link to this fact

Identity

Project
Granada Gold Project
Commodity
gold
Region
canada_qc
Reported Region
Quebec
Ticker
GGM

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Claude Duplessis
Resource group id
resource:3f9d0181d52c5cb3524b
Deposit or zone
Granada Gold Project
Mining method
combined
Ownership percent
100 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
15982000
Grade
1.73
Grade Unit
g/t
Contained Metal
890600
Contained Unit
oz

Prior Estimate

Resource Date
2026-06-08

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-07T00:00:00.000Z

Reasoning: Strong M&I resource component reported in the 2026 update.

Positive factors

  • High confidence category (M&I)
  • NI 43-101 compliant

Evidence · text

“2026 mineral resource estimate, effective June 8, 2026, reports measured and indicated mineral resources of 890,600 ounces of gold (15,982,000 tonnes at 1.73 g/t gold)”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

inferredGranada Gold Project · goldTonnes: 20096000Grade: 1.34Grade Unit: g/tContained Metal: 865500Contained Unit: ozView all details
Link to this fact

Identity

Project
Granada Gold Project
Commodity
gold
Region
canada_qc
Reported Region
Quebec
Ticker
GGM

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Claude Duplessis
Resource group id
resource:0d302b82257c783dc217
Deposit or zone
Granada Gold Project
Mining method
combined
Ownership percent
100 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
20096000
Grade
1.34
Grade Unit
g/t
Contained Metal
865500
Contained Unit
oz

Prior Estimate

Resource Date
2026-06-08

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-07T00:00:00.000Z

Reasoning: Large inferred resource component provides significant upside potential.

Positive factors

  • Significant inferred tonnage

Negative factors

  • Lower confidence category

Evidence · text

“separately inferred mineral resources of 865,500 ounces (20,096,000 tonnes at 1.34 g/t Au)”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.