# Golden Arrow Finishes Phase 2 Drilling and Engages Consultants for Resource Estimate at San Pietro Project, Chile

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8

Original source: https://money.tmx.com/en/quote/GRG/news/8175684254013083/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti

Publisher: tmx

Original announcement: 2024-12-10T12:00:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: Unknown date

Atlas analysis updated: Unknown date

- Company: Golden Arrow Resources Corporation

- Ticker: GRG

- Exchange: TSX

- Region: Chile

- Primary commodity: Copper

- Secondary commodities: Gold, Cobalt, Iron ore

- Document categories: Drill results, Resource update

- Extracted: 2026-08-23 15:13:55 UTC

Narrative sentiment: 0.70 · Bullish

## Minestarters Atlas summary

Golden Arrow Resources has completed its Phase 2 drill program at the San Pietro Project in Chile, reporting results from four holes. Highlights include a high-grade intercept of 2.65m at 2.13% copper and a wide zone of 102.6m averaging 0.22% copper, 100 g/t cobalt, and 16.2% iron. The company has also engaged consultants to prepare its first NI 43-101 compliant Mineral Resource Estimate, expected early next year.

Reasoning: Golden Arrow reported positive drill results from its Phase 2 program at San Pietro, highlighted by a high-grade copper intercept and wide zones of polymetallic mineralization. The company is also moving forward with a maiden resource estimate, indicating project advancement. While some intercepts are wide, their overall grade for primary metals is moderate to low, but the high-grade copper and significant iron/cobalt values are positive.

- Positive factor: High-grade copper intercept \(2.13% Cu over 2.65m\)

- Positive factor: Wide intercepts of polymetallic mineralization \(e.g., 102.6m\)

- Positive factor: Significant iron and cobalt grades in some intercepts

- Positive factor: Engagement of consultants for a maiden NI 43-101 resource estimate

- Positive factor: Expansion of mineralization footprint beyond expectations

- Negative factor: Headline 102.6m intercept is low-grade for copper, gold, and iron

- Negative factor: Gold grades are generally very low across all intercepts

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 82

## Classification and evidence

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: The release states that the company follows industry standard QA/QC procedures, including insertion of blank and standard samples, and mentions ALS Laboratory for analysis, with QP sign-off by Brian McEwen, P.Geol.

Evidence · text

> The Company follows industry standard procedures for the work carried out on the San Pietro Project, with a quality assurance/quality control \(QA/QC\) program. Blank and standard samples were inserted in each batch of samples sent to the laboratory for analysis.

**Infill Drilling**

Polarity: neutral

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: The Phase 2 drill program was initially focused on infill drilling at the Rincones target to support resource estimation.

Evidence · text

> We were initially focused on infill drilling Rincones to support estimating resources

**Step-Out Extension**

Polarity: positive

Definition: Mineralization extended beyond the previously known limit.

Why it applies: The company discovered that the mineralization footprint is larger than expected and has potential to grow with subsequent drill programs, indicating extensions beyond known limits.

Evidence · text

> we discovered that the mineralization footprint is much larger in extent than expected and there are often much longer significant intervals downhole than expected... indications are that Rincones has the potential to grow even larger with the subsequent drill programs.

**Bonanza Intercept**

Polarity: positive

Definition: Exceptionally high-grade zone, well above the deposit-type norm.

Why it applies: The intercept of 2.65m at 2.13% Cu is exceptional for an IOCG deposit, significantly exceeding the 0.9% Cu exceptional threshold.

Evidence · table

> 2.13

Context: 2.65

## Extracted facts

Stored fact records: 82. Some facts used in scoring do not have a stored record.

## Drill Results (82)

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-0)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.22
- Grade Unit: %
- Intercept: 102.6 m
- From: 67.4 m
- To: 170 m
- Hole Depth: 350 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-31:67.4-170.0
- Mining Method: open\_pit

#### Location

- Easting: 391546
- Northing: 7072048.7
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 914 m
- Azimuth: 200 °
- Dip: -67 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A very wide intercept of 102.6m indicates significant mineralization, but the copper grade is below the weak threshold for IOCG deposits, and gold/iron grades are also low. Cobalt is present but not evaluated against rubrics.

- Positive factor: Very wide intercept \(102.6m\)

- Positive factor: Polymetallic mineralization \(Cu, Au, Co, Fe\)

- Negative factor: Copper grade \(0.22%\) is below weak for IOCG

- Negative factor: Gold grade \(0.04 g/t\) is very low

- Negative factor: Iron grade \(16.2%\) is below weak

Evidence · table

> 0.22

Context: 102.60

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-1)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.5
- Grade Unit: %
- Intercept: 5 m
- From: 67.4 m
- To: 72.4 m
- Hole Depth: 350 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-31:67.4-72.4
- Mining Method: open\_pit

#### Location

- Easting: 391546
- Northing: 7072048.7
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 914 m
- Azimuth: 200 °
- Dip: -67 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A moderate copper grade over a narrow interval within a larger mineralized zone. Gold and iron grades are low.

- Positive factor: Moderate copper grade \(0.50%\) for IOCG

- Negative factor: Narrow intercept \(5.0m\)

- Negative factor: Low gold grade \(0.07 g/t\)

Evidence · table

> 0.50

Context: 5.00

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-2)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.56
- Grade Unit: %
- Intercept: 4 m
- From: 92 m
- To: 96 m
- Hole Depth: 350 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-31:92.0-96.0
- Mining Method: open\_pit

#### Location

- Easting: 391546
- Northing: 7072048.7
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 914 m
- Azimuth: 200 °
- Dip: -67 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A moderate copper grade over a narrow interval. Gold and iron grades are low.

- Positive factor: Moderate copper grade \(0.56%\) for IOCG

- Negative factor: Narrow intercept \(4.0m\)

- Negative factor: Low gold grade \(0.12 g/t\)

Evidence · table

> 0.56

Context: 4.00

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-3)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.51
- Grade Unit: %
- Intercept: 5.75 m
- From: 114.55 m
- To: 120.3 m
- Hole Depth: 350 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-31:114.55-120.3
- Mining Method: open\_pit

#### Location

- Easting: 391546
- Northing: 7072048.7
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 914 m
- Azimuth: 200 °
- Dip: -67 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A moderate copper grade over a narrow interval. Gold and iron grades are low.

- Positive factor: Moderate copper grade \(0.51%\) for IOCG

- Negative factor: Narrow intercept \(5.75m\)

- Negative factor: Low gold grade \(0.08 g/t\)

Evidence · table

> 0.51

Context: 5.75

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-4)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.48
- Grade Unit: %
- Intercept: 24.3 m
- From: 136 m
- To: 160.3 m
- Hole Depth: 350 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-31:136.0-160.3
- Mining Method: open\_pit

#### Location

- Easting: 391546
- Northing: 7072048.7
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 914 m
- Azimuth: 200 °
- Dip: -67 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A good width intercept with moderate copper and weak iron grades, along with significant cobalt. This contributes positively to the overall mineralization.

- Positive factor: Moderate copper grade \(0.48%\) for IOCG

- Positive factor: Moderate width \(24.3m\)

- Positive factor: Weak iron grade \(31.0%\)

- Positive factor: Significant cobalt grade \(214 g/t\)

- Negative factor: Low gold grade \(0.07 g/t\)

Evidence · table

> 0.48

Context: 24.30

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-5)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.64
- Grade Unit: %
- Intercept: 11.15 m
- From: 146.85 m
- To: 158 m
- Hole Depth: 350 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-31:146.85-158.0
- Mining Method: open\_pit

#### Location

- Easting: 391546
- Northing: 7072048.7
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 914 m
- Azimuth: 200 °
- Dip: -67 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A good copper grade over a moderate width, with notable iron and cobalt values, indicating a higher-grade zone within the broader mineralization.

- Positive factor: Moderate copper grade \(0.64%\) for IOCG

- Positive factor: Weak iron grade \(44.1%\)

- Positive factor: Significant cobalt grade \(383 g/t\)

- Negative factor: Low gold grade \(0.10 g/t\)

Evidence · table

> 0.64

Context: 11.15

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-6)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.26
- Grade Unit: %
- Intercept: 7.5 m
- From: 291.5 m
- To: 299 m
- Hole Depth: 350 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-31:291.5-299.0
- Mining Method: open\_pit

#### Location

- Easting: 391546
- Northing: 7072048.7
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 914 m
- Azimuth: 200 °
- Dip: -67 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A narrow intercept with weak copper grade and low gold/iron values.

- Negative factor: Copper grade \(0.26%\) is weak for IOCG

- Negative factor: Narrow intercept \(7.5m\)

- Negative factor: Low gold grade \(0.08 g/t\)

Evidence · table

> 0.26

Context: 7.50

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-7)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.31
- Grade Unit: %
- Intercept: 12.2 m
- From: 6 m
- To: 18.2 m
- Hole Depth: 320 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-32:6.0-18.2
- Mining Method: open\_pit

#### Location

- Easting: 390554
- Northing: 7072328
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 1049 m
- Azimuth: 200 °
- Dip: -60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A weak copper grade over a moderate width, with low gold and iron values.

- Positive factor: Weak copper grade \(0.31%\) for IOCG

- Negative factor: Low gold grade \(0.05 g/t\)

Evidence · table

> 0.31

Context: 12.20

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-8)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.34
- Grade Unit: %
- Intercept: 2 m
- From: 47 m
- To: 49 m
- Hole Depth: 320 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-32:47.0-49.0
- Mining Method: open\_pit

#### Location

- Easting: 390554
- Northing: 7072328
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 1049 m
- Azimuth: 200 °
- Dip: -60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A very narrow intercept with weak copper grade and low gold/iron values.

- Negative factor: Very narrow intercept \(2.0m\)

- Negative factor: Weak copper grade \(0.34%\) for IOCG

- Negative factor: Low gold grade \(0.07 g/t\)

Evidence · table

> 0.34

Context: 2.00

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-9)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.24
- Grade Unit: %
- Intercept: 16.6 m
- From: 69.4 m
- To: 86 m
- Hole Depth: 320 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-32:69.4-86.0
- Mining Method: open\_pit

#### Location

- Easting: 390554
- Northing: 7072328
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 1049 m
- Azimuth: 200 °
- Dip: -60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A moderate width intercept with copper grade below the weak threshold and low gold/iron values.

- Negative factor: Copper grade \(0.24%\) is below weak for IOCG

- Negative factor: Low gold grade \(0.04 g/t\)

Evidence · table

> 0.24

Context: 16.60

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-10)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 288
- Grade Unit: g/t
- Intercept: 13.8 m
- From: 169 m
- To: 182.8 m
- Hole Depth: 320 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-32:169.0-182.8
- Mining Method: open\_pit

#### Location

- Easting: 390554
- Northing: 7072328
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 1049 m
- Azimuth: 200 °
- Dip: -60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A moderate width intercept with significant cobalt grade, despite low copper and gold values. This highlights the polymetallic nature of the deposit.

- Positive factor: Significant cobalt grade \(288 g/t\)

- Negative factor: Copper grade \(0.15%\) is very low

- Negative factor: Low gold grade \(0.06 g/t\)

Evidence · table

> 288

Context: 13.80

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-11)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.25
- Grade Unit: %
- Intercept: 3 m
- From: 302 m
- To: 305 m
- Hole Depth: 425 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-33:302.0-305.0
- Mining Method: open\_pit

#### Location

- Easting: 391093
- Northing: 7071385
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 959 m
- Azimuth: 20 °
- Dip: -60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A very narrow intercept with copper grade below the weak threshold and low gold/iron values.

- Negative factor: Very narrow intercept \(3.0m\)

- Negative factor: Copper grade \(0.25%\) is below weak for IOCG

- Negative factor: Low gold grade \(0.03 g/t\)

Evidence · table

> 0.25

Context: 3.00

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-12)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.32
- Grade Unit: %
- Intercept: 2 m
- From: 311 m
- To: 313 m
- Hole Depth: 425 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-33:311.0-313.0
- Mining Method: open\_pit

#### Location

- Easting: 391093
- Northing: 7071385
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 959 m
- Azimuth: 20 °
- Dip: -60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A very narrow intercept with weak copper grade and low gold/iron values.

- Negative factor: Very narrow intercept \(2.0m\)

- Negative factor: Weak copper grade \(0.32%\) for IOCG

- Negative factor: Low gold grade \(0.04 g/t\)

Evidence · table

> 0.32

Context: 2.00

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-13)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.29
- Grade Unit: %
- Intercept: 5.7 m
- From: 323.3 m
- To: 329 m
- Hole Depth: 425 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-33:323.3-329.0
- Mining Method: open\_pit

#### Location

- Easting: 391093
- Northing: 7071385
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 959 m
- Azimuth: 20 °
- Dip: -60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A narrow intercept with weak copper grade and low gold/iron values.

- Negative factor: Narrow intercept \(5.7m\)

- Negative factor: Copper grade \(0.29%\) is weak for IOCG

- Negative factor: Low gold grade \(0.05 g/t\)

Evidence · table

> 0.29

Context: 5.70

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-14)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 2.13
- Grade Unit: %
- Intercept: 2.65 m
- From: 378.73 m
- To: 381.38 m
- Hole Depth: 425 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-33:378.73-381.38
- Mining Method: open\_pit

#### Location

- Easting: 391093
- Northing: 7071385
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 959 m
- Azimuth: 20 °
- Dip: -60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: An exceptional copper grade over a narrow interval, representing a high-grade zone within the deposit. This is a very positive result for copper.

- Positive factor: Exceptional copper grade \(2.13%\) for IOCG

- Positive factor: Weak iron grade \(33.0%\)

- Negative factor: Very narrow intercept \(2.65m\)

- Negative factor: Low gold grade \(0.14 g/t\)

Evidence · table

> 2.13

Context: 2.65

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-15)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 53.3
- Grade Unit: %
- Intercept: 11.85 m
- From: 29 m
- To: 40.85 m
- Hole Depth: 422 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-34:29.0-40.85
- Mining Method: open\_pit

#### Location

- Easting: 390519
- Northing: 7070077
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 1095 m
- Azimuth: 235 °
- Dip: -60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A moderate iron grade over a moderate width, indicating significant iron mineralization, despite very low copper and gold values.

- Positive factor: Moderate iron grade \(53.3%\)

- Negative factor: Very low copper grade \(0.03%\)

- Negative factor: Very low gold grade \(&lt;0.01 g/t\)

Evidence · table

> 53.3

Context: 11.85

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-16)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 55.6
- Grade Unit: %
- Intercept: 13.82 m
- From: 98.55 m
- To: 112.37 m
- Hole Depth: 422 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-34:98.55-112.37
- Mining Method: open\_pit

#### Location

- Easting: 390519
- Northing: 7070077
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 1095 m
- Azimuth: 235 °
- Dip: -60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A moderate iron grade over a moderate width, indicating significant iron mineralization, despite very low copper and gold values.

- Positive factor: Moderate iron grade \(55.6%\)

- Negative factor: Very low copper grade \(0.07%\)

- Negative factor: Low gold grade \(0.03 g/t\)

Evidence · table

> 55.6

Context: 13.82

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-17)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 421
- Grade Unit: g/t
- Intercept: 2.85 m
- From: 226 m
- To: 228.85 m
- Hole Depth: 422 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-34:226.0-228.85
- Mining Method: open\_pit

#### Location

- Easting: 390519
- Northing: 7070077
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 1095 m
- Azimuth: 235 °
- Dip: -60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A very narrow intercept with significant cobalt grade, despite very low copper and gold values. This highlights the cobalt potential.

- Positive factor: Significant cobalt grade \(421 g/t\)

- Negative factor: Very narrow intercept \(2.85m\)

- Negative factor: Very low copper grade \(0.06%\)

- Negative factor: Low gold grade \(0.01 g/t\)

Evidence · table

> 421

Context: 2.85

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-18)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 454
- Grade Unit: g/t
- Intercept: 8.6 m
- From: 311.4 m
- To: 320 m
- Hole Depth: 422 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-34:311.4-320.0
- Mining Method: open\_pit

#### Location

- Easting: 390519
- Northing: 7070077
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 1095 m
- Azimuth: 235 °
- Dip: -60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A moderate width intercept with significant cobalt grade, despite low copper and gold values. This is a positive result for cobalt.

- Positive factor: Significant cobalt grade \(454 g/t\)

- Negative factor: Low copper grade \(0.17%\)

- Negative factor: Low gold grade \(0.03 g/t\)

Evidence · table

> 454

Context: 8.60

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-19)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 244
- Grade Unit: g/t
- Intercept: 8 m
- From: 398 m
- To: 406 m
- Hole Depth: 422 m

#### Classification

- Deposit Type: iocg
- Program: resource
- Sample Type: drill
- Group ID: SP-DDH-34:398.0-406.0
- Mining Method: open\_pit

#### Location

- Easting: 390519
- Northing: 7070077
- CRS: PSAD 56 / UTM Zone 19 S
- Elevation: 1095 m
- Azimuth: 235 °
- Dip: -60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: ALS
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes
- QA/QC Methods: blanks, standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: A moderate width intercept with significant cobalt grade, despite very low copper and gold values. This is a positive result for cobalt.

- Positive factor: Significant cobalt grade \(244 g/t\)

- Negative factor: Very low copper grade \(&lt;0.01%\)

- Negative factor: Low gold grade \(0.02 g/t\)

Evidence · table

> 244

Context: 8.00

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-20)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.04
- Grade Unit: g/t
- Intercept: 102.6 m
- From: 67.4 m
- To: 170 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:67.4-170
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.04 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 4.1 g/t·m is below.

- Negative factor: 0.04 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.04

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-21)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 100
- Grade Unit: g/t
- Intercept: 102.6 m
- From: 67.4 m
- To: 170 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:67.4-170
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 100 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 100

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-22)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 16.2
- Grade Unit: %
- Intercept: 102.6 m
- From: 67.4 m
- To: 170 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:67.4-170
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 16.2 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 16.2

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-23)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.07
- Grade Unit: g/t
- Intercept: 5 m
- From: 67.4 m
- To: 72.4 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:67.4-72.4
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.07 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.4 g/t·m is below.

- Negative factor: 0.07 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.07

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-24)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 108
- Grade Unit: g/t
- Intercept: 5 m
- From: 67.4 m
- To: 72.4 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:67.4-72.4
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 108 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 108

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-25)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 14.8
- Grade Unit: %
- Intercept: 5 m
- From: 67.4 m
- To: 72.4 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:67.4-72.4
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 14.8 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 14.8

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-26)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.12
- Grade Unit: g/t
- Intercept: 4 m
- From: 92 m
- To: 96 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:92-96
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.12 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.5 g/t·m is below.

- Negative factor: 0.12 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.12

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-27)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 169
- Grade Unit: g/t
- Intercept: 4 m
- From: 92 m
- To: 96 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:92-96
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 169 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 169

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-28)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 17.6
- Grade Unit: %
- Intercept: 4 m
- From: 92 m
- To: 96 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:92-96
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 17.6 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 17.6

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-29)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.08
- Grade Unit: g/t
- Intercept: 5.75 m
- From: 114.55 m
- To: 120.3 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:114.55-120.3
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.08 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.5 g/t·m is below.

- Negative factor: 0.08 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.08

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-30)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 123
- Grade Unit: g/t
- Intercept: 5.75 m
- From: 114.55 m
- To: 120.3 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:114.55-120.3
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 123 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 123

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-31)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 15.3
- Grade Unit: %
- Intercept: 5.75 m
- From: 114.55 m
- To: 120.3 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:114.55-120.3
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 15.3 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 15.3

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-32)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.07
- Grade Unit: g/t
- Intercept: 24.3 m
- From: 136 m
- To: 160.3 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:136-160.3
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.07 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 1.7 g/t·m is below.

- Negative factor: 0.07 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.07

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-33)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 214
- Grade Unit: g/t
- Intercept: 24.3 m
- From: 136 m
- To: 160.3 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:136-160.3
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 214 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 214

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-34)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 31
- Grade Unit: %
- Intercept: 24.3 m
- From: 136 m
- To: 160.3 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:136-160.3
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 31 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 31.0

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-35)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.1
- Grade Unit: g/t
- Intercept: 11.15 m
- From: 146.85 m
- To: 158 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:146.85-158
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.1 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 1.1 g/t·m is below.

- Negative factor: 0.1 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.10

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-36)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 383
- Grade Unit: g/t
- Intercept: 11.15 m
- From: 146.85 m
- To: 158 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:146.85-158
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 383 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 383

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-37)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 44.1
- Grade Unit: %
- Intercept: 11.15 m
- From: 146.85 m
- To: 158 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:146.85-158
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 44.1 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 44.1

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-38)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.08
- Grade Unit: g/t
- Intercept: 7.5 m
- From: 291.5 m
- To: 299 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:291.5-299
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.08 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.6 g/t·m is below.

- Negative factor: 0.08 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.08

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-39)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 103
- Grade Unit: g/t
- Intercept: 7.5 m
- From: 291.5 m
- To: 299 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:291.5-299
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 103 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 103

Context: SP-DDH-31

### SP-DDH-31

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-40)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-31
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 14.9
- Grade Unit: %
- Intercept: 7.5 m
- From: 291.5 m
- To: 299 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-31:291.5-299
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 14.9 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 14.9

Context: SP-DDH-31

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-41)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.05
- Grade Unit: g/t
- Intercept: 12.2 m
- From: 6 m
- To: 18.2 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-32:6-18.2
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.05 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.6 g/t·m is below.

- Negative factor: 0.05 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.05

Context: SP-DDH-32

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-42)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 71
- Grade Unit: g/t
- Intercept: 12.2 m
- From: 6 m
- To: 18.2 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-32:6-18.2
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 71 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 71

Context: SP-DDH-32

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-43)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 13.5
- Grade Unit: %
- Intercept: 12.2 m
- From: 6 m
- To: 18.2 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-32:6-18.2
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 13.5 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 13.5

Context: SP-DDH-32

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-44)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.07
- Grade Unit: g/t
- Intercept: 2 m
- From: 47 m
- To: 49 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-32:47-49
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.07 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.1 g/t·m is below.

- Negative factor: 0.07 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.07

Context: SP-DDH-32

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-45)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 80
- Grade Unit: g/t
- Intercept: 2 m
- From: 47 m
- To: 49 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-32:47-49
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 80 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 80

Context: SP-DDH-32

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-46)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 21.3
- Grade Unit: %
- Intercept: 2 m
- From: 47 m
- To: 49 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-32:47-49
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 21.3 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 21.3

Context: SP-DDH-32

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-47)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.04
- Grade Unit: g/t
- Intercept: 16.6 m
- From: 69.4 m
- To: 86 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-32:69.4-86
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.04 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.7 g/t·m is below.

- Negative factor: 0.04 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.04

Context: SP-DDH-32

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-48)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 78
- Grade Unit: g/t
- Intercept: 16.6 m
- From: 69.4 m
- To: 86 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-32:69.4-86
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 78 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 78

Context: SP-DDH-32

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-49)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 13.9
- Grade Unit: %
- Intercept: 16.6 m
- From: 69.4 m
- To: 86 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-32:69.4-86
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 13.9 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 13.9

Context: SP-DDH-32

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-50)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.15
- Grade Unit: %
- Intercept: 13.8 m
- From: 169 m
- To: 182.8 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-32:169-182.8
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.15 % copper is below against the iocg deposit band \[0.9, 0.5, 0.3, 0.2\] %. Grade×width 2.1 %·m is below.

- Negative factor: 0.15 % copper is below the weak threshold \(0.2 %\) on the iocg deposit band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.15

Context: SP-DDH-32

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-51)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.06
- Grade Unit: g/t
- Intercept: 13.8 m
- From: 169 m
- To: 182.8 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-32:169-182.8
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.06 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.8 g/t·m is below.

- Negative factor: 0.06 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.06

Context: SP-DDH-32

### SP-DDH-32

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-52)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-32
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 17.3
- Grade Unit: %
- Intercept: 13.8 m
- From: 169 m
- To: 182.8 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-32:169-182.8
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 17.3 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 17.3

Context: SP-DDH-32

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-53)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.03
- Grade Unit: g/t
- Intercept: 3 m
- From: 302 m
- To: 305 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-33:302-305
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.03 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.1 g/t·m is below.

- Negative factor: 0.03 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.03

Context: SP-DDH-33

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-54)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 25
- Grade Unit: g/t
- Intercept: 3 m
- From: 302 m
- To: 305 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-33:302-305
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 25 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 25

Context: SP-DDH-33

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-55)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 13.1
- Grade Unit: %
- Intercept: 3 m
- From: 302 m
- To: 305 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-33:302-305
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 13.1 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 13.1

Context: SP-DDH-33

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-56)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.04
- Grade Unit: g/t
- Intercept: 2 m
- From: 311 m
- To: 313 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-33:311-313
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.04 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.1 g/t·m is below.

- Negative factor: 0.04 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.04

Context: SP-DDH-33

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-57)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 49
- Grade Unit: g/t
- Intercept: 2 m
- From: 311 m
- To: 313 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-33:311-313
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 49 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 49

Context: SP-DDH-33

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-58)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 9.8
- Grade Unit: %
- Intercept: 2 m
- From: 311 m
- To: 313 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-33:311-313
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 9.8 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 9.8

Context: SP-DDH-33

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-59)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.05
- Grade Unit: g/t
- Intercept: 5.7 m
- From: 323.3 m
- To: 329 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-33:323.3-329
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.05 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.3 g/t·m is below.

- Negative factor: 0.05 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.05

Context: SP-DDH-33

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-60)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 118
- Grade Unit: g/t
- Intercept: 5.7 m
- From: 323.3 m
- To: 329 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-33:323.3-329
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 118 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 118

Context: SP-DDH-33

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-61)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 19.4
- Grade Unit: %
- Intercept: 5.7 m
- From: 323.3 m
- To: 329 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-33:323.3-329
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 19.4 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 19.4

Context: SP-DDH-33

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-62)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.14
- Grade Unit: g/t
- Intercept: 2.65 m
- From: 378.73 m
- To: 381.38 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-33:378.73-381.38
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.14 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.4 g/t·m is below.

- Negative factor: 0.14 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.14

Context: SP-DDH-33

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-63)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 127
- Grade Unit: g/t
- Intercept: 2.65 m
- From: 378.73 m
- To: 381.38 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-33:378.73-381.38
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 127 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 127

Context: SP-DDH-33

### SP-DDH-33

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-64)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-33
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 33
- Grade Unit: %
- Intercept: 2.65 m
- From: 378.73 m
- To: 381.38 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-33:378.73-381.38
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 33 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 33.0

Context: SP-DDH-33

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-65)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.03
- Grade Unit: %
- Intercept: 11.85 m
- From: 29 m
- To: 40.85 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:29-40.85
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.03 % copper is below against the iocg deposit band \[0.9, 0.5, 0.3, 0.2\] %. Grade×width 0.4 %·m is below.

- Negative factor: 0.03 % copper is below the weak threshold \(0.2 %\) on the iocg deposit band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.03

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-66)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.01
- Grade Unit: g/t
- Intercept: 11.85 m
- From: 29 m
- To: 40.85 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:29-40.85
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.01 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.1 g/t·m is below.

- Negative factor: 0.01 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> &lt;0.01

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-67)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 142
- Grade Unit: g/t
- Intercept: 11.85 m
- From: 29 m
- To: 40.85 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:29-40.85
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 142 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 142

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-68)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 53.3
- Grade Unit: %
- Intercept: 11.85 m
- From: 29 m
- To: 40.85 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:29-40.85
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 53.3 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 53.3

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-69)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.07
- Grade Unit: %
- Intercept: 13.82 m
- From: 98.55 m
- To: 112.37 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:98.55-112.37
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.07 % copper is below against the iocg deposit band \[0.9, 0.5, 0.3, 0.2\] %. Grade×width 1.0 %·m is below.

- Negative factor: 0.07 % copper is below the weak threshold \(0.2 %\) on the iocg deposit band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.07

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-70)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.03
- Grade Unit: g/t
- Intercept: 13.82 m
- From: 98.55 m
- To: 112.37 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:98.55-112.37
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.03 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.4 g/t·m is below.

- Negative factor: 0.03 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.03

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-71)

San Pietro Project · cobalt

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: cobalt
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 149
- Grade Unit: g/t
- Intercept: 13.82 m
- From: 98.55 m
- To: 112.37 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:98.55-112.37
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 149 g/t cobalt, reported in a unit the rubric does not cover \(%\).

- Negative factor: Grade unit g/t does not match the cobalt rubric unit %; not scored.

Evidence · table

> 149

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-72)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 55.6
- Grade Unit: %
- Intercept: 13.82 m
- From: 98.55 m
- To: 112.37 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:98.55-112.37
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 55.6 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 55.6

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-73)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.06
- Grade Unit: %
- Intercept: 2.85 m
- From: 226 m
- To: 228.85 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:226-228.85
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.06 % copper is below against the iocg deposit band \[0.9, 0.5, 0.3, 0.2\] %. Grade×width 0.2 %·m is below.

- Negative factor: 0.06 % copper is below the weak threshold \(0.2 %\) on the iocg deposit band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.06

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-74)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.01
- Grade Unit: g/t
- Intercept: 2.85 m
- From: 226 m
- To: 228.85 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:226-228.85
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.01 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.0 g/t·m is below.

- Negative factor: 0.01 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.01

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-75)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 17
- Grade Unit: %
- Intercept: 2.85 m
- From: 226 m
- To: 228.85 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:226-228.85
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 17 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 17.0

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-76)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.17
- Grade Unit: %
- Intercept: 8.6 m
- From: 311.4 m
- To: 320 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:311.4-320
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.17 % copper is below against the iocg deposit band \[0.9, 0.5, 0.3, 0.2\] %. Grade×width 1.5 %·m is below.

- Negative factor: 0.17 % copper is below the weak threshold \(0.2 %\) on the iocg deposit band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.17

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-77)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.03
- Grade Unit: g/t
- Intercept: 8.6 m
- From: 311.4 m
- To: 320 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:311.4-320
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.03 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.3 g/t·m is below.

- Negative factor: 0.03 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.03

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-78)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 18.4
- Grade Unit: %
- Intercept: 8.6 m
- From: 311.4 m
- To: 320 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:311.4-320
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 18.4 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 18.4

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-79)

San Pietro Project · copper

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: copper
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.01
- Grade Unit: %
- Intercept: 8 m
- From: 398 m
- To: 406 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:398-406
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.01 % copper is below against the iocg deposit band \[0.9, 0.5, 0.3, 0.2\] %. Grade×width 0.1 %·m is below.

- Negative factor: 0.01 % copper is below the weak threshold \(0.2 %\) on the iocg deposit band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> &lt;0.01

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-80)

San Pietro Project · gold

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 0.02
- Grade Unit: g/t
- Intercept: 8 m
- From: 398 m
- To: 406 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:398-406
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table. 0.02 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 0.2 g/t·m is below.

- Negative factor: 0.02 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.02

Context: SP-DDH-34

### SP-DDH-34

[Link to this fact](https://atlas-staging.minestarters.com/news/golden-arrow-finishes-phase-2-drilling-and-engages-consultants-for-resource-esti--5a3b544c-cb94-4380-8b83-dd942764acd8#fact-drill-facts-81)

San Pietro Project · iron\_ore

#### Identity

- Hole ID: SP-DDH-34
- Project: San Pietro Project
- Commodity: iron\_ore
- Region: chile
- Reported Region: Chile
- Ticker: GRG

#### Geometry

- Grade: 17.4
- Grade Unit: %
- Intercept: 8 m
- From: 398 m
- To: 406 m

#### Classification

- Deposit Type: iocg
- Sample Type: drill
- Group ID: SP-DDH-34:398-406
- Mining Method: open\_pit

#### Location

- CRS: PSAD 56 / UTM Zone 19 S

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2024-12-10T00:00:00.000Z

Reasoning: Expanded from assay table: 17.4 % iron\_ore. No grade band defined for this commodity, so the score is a placeholder.

- Negative factor: No grade rubric for iron\_ore; intercept not scored.

Evidence · table

> 17.4

Context: SP-DDH-34

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
