GL1: Notification of AGM & Closing Date for Director Nominations

Original announcement by asx on

Company
Global Lithium Resources Limited
Ticker
GL1
Exchange
ASX
Region
Western Australia
Primary commodity
Lithium
Secondary commodities
Tantalum
Document categories
Other, Resource update
Extracted
2026-10-09 02:10:09 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Global Lithium Resources Limited announced the date for its 2026 Annual General Meeting (AGM) on Thursday, 19 November 2026, with further details to follow. The company also advised that the closing date for director nominations for the AGM is 19 October 2026. The announcement includes historical mineral resource and ore reserve estimates for its Manna and Marble Bar Lithium Projects, noting no material changes to previously released information.

Reasoning: Routine notification of an Annual General Meeting and director nomination deadline. The resource and reserve estimates are historical and re-presented for context, not new updates.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 10

Extracted facts

Stored fact records: 10. Some facts used in scoring do not have a stored record.

Resource Estimates (10)

indicatedMarble Bar Lithium Project · lithiumTonnes: 3800000Grade: 0.97Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Marble Bar Lithium Project
Commodity
lithium
Ticker
GL1

Resource scope

Estimate type
resource
Resource group id
resource:985af33918acf648314b

Resource Data

Category
indicated
Tonnes
3800000
Grade
0.97
Grade Unit
%

Prior Estimate

Resource Date
2025-06-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2022-12-15T00:00:00.000Z

Dates

Event date
2026-10-09T00:00:00.000Z

Reasoning: Historical resource estimate for Marble Bar Lithium Project from 15 December 2022.

Evidence · table

“0.97”

Context: 3.8

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedMarble Bar Lithium Project · tantalumTonnes: 3800000Grade: 53Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Marble Bar Lithium Project
Commodity
tantalum
Ticker
GL1

Resource scope

Estimate type
resource
Resource group id
resource:985af33918acf648314b

Resource Data

Category
indicated
Tonnes
3800000
Grade
53
Grade Unit
ppm

Prior Estimate

Resource Date
2025-06-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2022-12-15T00:00:00.000Z

Dates

Event date
2026-10-09T00:00:00.000Z

Reasoning: Historical resource estimate for Marble Bar Lithium Project from 15 December 2022.

Evidence · table

“53”

Context: 3.8

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredMarble Bar Lithium Project · lithiumTonnes: 14200000Grade: 1.01Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Marble Bar Lithium Project
Commodity
lithium
Ticker
GL1

Resource scope

Estimate type
resource
Resource group id
resource:554e3d03870cf0c4ee5b

Resource Data

Category
inferred
Tonnes
14200000
Grade
1.01
Grade Unit
%

Prior Estimate

Resource Date
2025-06-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2022-12-15T00:00:00.000Z

Dates

Event date
2026-10-09T00:00:00.000Z

Reasoning: Historical resource estimate for Marble Bar Lithium Project from 15 December 2022.

Evidence · table

“1.01”

Context: 14.2

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredMarble Bar Lithium Project · tantalumTonnes: 14200000Grade: 50Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Marble Bar Lithium Project
Commodity
tantalum
Ticker
GL1

Resource scope

Estimate type
resource
Resource group id
resource:554e3d03870cf0c4ee5b

Resource Data

Category
inferred
Tonnes
14200000
Grade
50
Grade Unit
ppm

Prior Estimate

Resource Date
2025-06-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2022-12-15T00:00:00.000Z

Dates

Event date
2026-10-09T00:00:00.000Z

Reasoning: Historical resource estimate for Marble Bar Lithium Project from 15 December 2022.

Evidence · table

“50”

Context: 14.2

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedManna Lithium Project · lithiumTonnes: 32900000Grade: 1.04Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Manna Lithium Project
Commodity
lithium
Ticker
GL1

Resource scope

Estimate type
resource
Resource group id
resource:0c503bf9615f566b8b0a

Resource Data

Category
indicated
Tonnes
32900000
Grade
1.04
Grade Unit
%

Prior Estimate

Resource Date
2025-06-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-06-12T00:00:00.000Z

Dates

Event date
2026-10-09T00:00:00.000Z

Reasoning: Historical resource estimate for Manna Lithium Project from 12 June 2024.

Evidence · table

“1.04”

Context: 32.9

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedManna Lithium Project · tantalumTonnes: 32900000Grade: 52Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Manna Lithium Project
Commodity
tantalum
Ticker
GL1

Resource scope

Estimate type
resource
Resource group id
resource:0c503bf9615f566b8b0a

Resource Data

Category
indicated
Tonnes
32900000
Grade
52
Grade Unit
ppm

Prior Estimate

Resource Date
2025-06-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-06-12T00:00:00.000Z

Dates

Event date
2026-10-09T00:00:00.000Z

Reasoning: Historical resource estimate for Manna Lithium Project from 12 June 2024.

Evidence · table

“52”

Context: 32.9

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredManna Lithium Project · lithiumTonnes: 18700000Grade: 0.92Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Manna Lithium Project
Commodity
lithium
Ticker
GL1

Resource scope

Estimate type
resource
Resource group id
resource:fe50f08d92e873cb480c

Resource Data

Category
inferred
Tonnes
18700000
Grade
0.92
Grade Unit
%

Prior Estimate

Resource Date
2025-06-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-06-12T00:00:00.000Z

Dates

Event date
2026-10-09T00:00:00.000Z

Reasoning: Historical resource estimate for Manna Lithium Project from 12 June 2024.

Evidence · table

“0.92”

Context: 18.7

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredManna Lithium Project · tantalumTonnes: 18700000Grade: 50Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Manna Lithium Project
Commodity
tantalum
Ticker
GL1

Resource scope

Estimate type
resource
Resource group id
resource:fe50f08d92e873cb480c

Resource Data

Category
inferred
Tonnes
18700000
Grade
50
Grade Unit
ppm

Prior Estimate

Resource Date
2025-06-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-06-12T00:00:00.000Z

Dates

Event date
2026-10-09T00:00:00.000Z

Reasoning: Historical resource estimate for Manna Lithium Project from 12 June 2024.

Evidence · table

“50”

Context: 18.7

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableManna Lithium Project · lithiumTonnes: 14700000Grade: 0.91Grade Unit: %Contained Metal: 133770Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Manna Lithium Project
Commodity
lithium
Ticker
GL1

Resource scope

Estimate type
reserve
Resource group id
resource:188d67048d4d300b3ebe
Deposit or zone
Open Cut

Resource Data

Category
probable
Tonnes
14700000
Grade
0.91
Grade Unit
%
Contained Metal
133770
Contained Unit
t

Prior Estimate

Resource Date
2026-09-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-09-16T00:00:00.000Z

Dates

Event date
2026-10-09T00:00:00.000Z

Reasoning: Historical ore reserve estimate for Manna Lithium Project Open Cut from 16 September 2026.

Evidence · table

“0.91”

Context: 14.7

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

probableManna Lithium Project · lithiumTonnes: 6200000Grade: 0.83Grade Unit: %Contained Metal: 51460Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Manna Lithium Project
Commodity
lithium
Ticker
GL1

Resource scope

Estimate type
reserve
Resource group id
resource:7a2ffe976cc12521b51c
Deposit or zone
UG

Resource Data

Category
probable
Tonnes
6200000
Grade
0.83
Grade Unit
%
Contained Metal
51460
Contained Unit
t

Prior Estimate

Resource Date
2026-09-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-09-16T00:00:00.000Z

Dates

Event date
2026-10-09T00:00:00.000Z

Reasoning: Historical ore reserve estimate for Manna Lithium Project Underground from 16 September 2026.

Evidence · table

“0.83”

Context: 6.2

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.