# Galore Drill Commences 2019 2,500 Meter Core Program at Dos Santos Project

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/galore-drill-commences-2019-2-500-meter-core-program-at-dos-santos-project--6fb81526-83b3-4cc7-8645-639cf1fad36e

Original source: https://money.tmx.com/en/quote/GRI/news/4990391300898692/galore-drill-commences-2019-2-500-meter-core-program-at-dos-santos-project

Publisher: tmx

Original announcement: 2019-06-04T12:30:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: Unknown date

Atlas analysis updated: Unknown date

- Company: Galore Resources Inc.

- Ticker: GRI

- Exchange: TSX

- Region: Zacatecas, Mexico

- Primary commodity: Gold

- Secondary commodities: Silver

- Document categories: Drill results

- Extracted: 2026-08-23 15:16:23 UTC

Narrative sentiment: 0.20 · Bullish

## Minestarters Atlas summary

Galore Resources has commenced a 2,500-meter diamond core drilling program at its El Alamo target within the Dos Santos Project in Zacatecas, Mexico. This is the first drill program conducted at the El Alamo target, which is targeting gold mineralization associated with jasperoid and karst breccias.

Reasoning: The announcement marks the start of a 2,500m exploration program at a new target, but contains no assay results yet.

- Positive factor: commencement of first drill program at El Alamo target

- Positive factor: targeting known surface mineralization

Facts used in scoring: 1

## Classification and evidence

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: The release names a Qualified Person \(Bill Fleshman\) and references NI 43-101 compliance.

Evidence · text

> reviewed and approved Bill Fleshman... and Qualified Person as defined by National Instrument 43-101 Policy.

**Infill Drilling**

Polarity: neutral

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: The program is described as the first drill program at the El Alamo target, making it exploration/discovery oriented.

Evidence · text

> This is the first drill program conducted at El Alamo.

## Extracted facts

Stored fact records: 1. Some facts used in scoring do not have a stored record.

## Drill Results (1)

### EA-001

[Link to this fact](https://atlas-staging.minestarters.com/news/galore-drill-commences-2019-2-500-meter-core-program-at-dos-santos-project--6fb81526-83b3-4cc7-8645-639cf1fad36e#fact-drill-facts-0)

Dos Santos Project · gold

#### Identity

- Hole ID: EA-001
- Project: Dos Santos Project
- Commodity: gold
- Region: mexico
- Reported Region: Zacatecas, Mexico
- Ticker: GRI

#### Geometry

- Hole Depth: 70 m

#### Classification

- Program: exploration
- Sample Type: drill

#### QA/QC

- QA/QC Disclosed: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2019-06-04T00:00:00.000Z

Reasoning: Hole has been drilled to 70m but core has not been logged or assayed.

- Negative factor: no assay results reported

Evidence · text

> The first hole, EA-001, is at 70m depth. The core has not been logged.

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
