# FREEMAN GOLD COMMENCES FEASIBILITY LEVEL GEOTECHNICAL WORK PROGRAM AT THE LEMHI GOLD PROJECT

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/freeman-gold-commences-feasibility-level-geotechnical-work-program-at-the-lemhi--bca19097-f571-44e4-aa94-d46ba73e8e23

Original source: https://money.tmx.com/en/quote/FMAN/news/8003348560006071/freeman-gold-commences-feasibility-level-geotechnical-work-program-at-the-lemhi-

Publisher: tmx

Original announcement: 2025-05-20T11:30:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: Unknown date

Atlas analysis updated: Unknown date

- Company: Freeman Gold Corp.

- Ticker: FMAN

- Exchange: TSX

- Region: Idaho, USA

- Primary commodity: Gold

- Secondary commodities: None reported

- Document categories: Other, Resource update

- Extracted: 2026-08-25 10:43:52 UTC

Narrative sentiment: 0.40 · Bullish

## Minestarters Atlas summary

Freeman Gold Corp. has commenced a 2025 geotechnical work program at the Lemhi Gold Project in Idaho to support an upcoming feasibility study. The program includes borehole drilling, geophysical surveys, and laboratory testing to characterize rock mass and soil properties.

Reasoning: The announcement details the start of a critical geotechnical program required for the upcoming feasibility study, signaling project progression.

- Positive factor: Commencement of feasibility-level geotechnical work

- Positive factor: Advancement towards feasibility study

- Positive factor: Existing NI 43-101 compliant resource

Facts used in scoring: 3

## Classification and evidence

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: The resource estimate is explicitly described as NI 43-101 compliant.

Evidence · text

> The pit constrained National Instrument 43-101 \(" NI 43- 101 "\) compliant mineral resource estimate

**Resource Update**

Polarity: neutral

Definition: Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document restates the existing resource in the context of new geotechnical work.

Evidence · text

> The Project comprises 30 square kilometres of highly prospective land, hosting a near-surface oxide gold resource.

## Extracted facts

Stored fact records: 0. Some facts used in scoring do not have a stored record.

No stored fact records are available for this extraction.

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
