EM2: 2026 Annual Report

Original announcement by asx on

Company
Eagle Mountain Mining Limited
Ticker
EM2
Exchange
ASX
Region
Arizona, USA
Primary commodity
Copper
Secondary commodities
Gold, Silver
Document categories
Agreement transaction, Capital raise, Resource update
Extracted
2026-10-22 06:10:26 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Eagle Mountain Mining Limited's 2026 Annual Report highlights the successful re-acquisition of its Oracle Ridge Copper Project and the formation of a significant joint venture with Nittetsu Mining Co. of Japan. Nittetsu will sole-fund US$16.5 million in exploration costs, with Eagle Mountain free-carried, and the company also restructured its debt and completed a capital raise. The Oracle Ridge project includes a historical Mineral Resource Estimate of 28.2 Mt at 1.35% Cu, 11.06 g/t Ag, and 0.16 g/t Au.

Reasoning: Eagle Mountain Mining successfully re-acquired its key Oracle Ridge project and secured a significant joint venture partner (Nittetsu Mining Co.) who will sole-fund substantial exploration, significantly de-risking the project and validating its quality. This was supported by a successful capital raise and debt restructuring.

Positive factors

  • Successful re-acquisition of the Oracle Ridge project.
  • Formation of a joint venture with Nittetsu Mining Co., a reputable partner.
  • Nittetsu to sole-fund US$16.5 million in exploration costs, making Eagle Mountain free-carried.
  • Extinguishment of US$7.25 million debt to Vincere at a discounted US$2.5 million.
  • Successful completion of a capital raise to support strategic initiatives.
  • Oracle Ridge project benefits from existing infrastructure and a substantial historical MRE.

Negative factors

  • The Mineral Resource Estimate is historical (November 2023) and has not been updated.
  • Limited work was completed at the Silver Mountain project during the year.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 21

Classification and evidence

Joint Venture Formedpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: The company entered a Joint Venture with Nittetsu Mining Co. of Japan regarding the Oracle Ridge Project.

Evidence · text

“In April 2026 the Company entered a Joint Venture with Nittetsu Mining Co. of Japan (Nittetsu) regarding the Oracle Ridge Project.”

Free Carried Interestpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: Eagle Mountain retains a 20% interest, free-carried until a US$20 million expenditure milestone is met.

Evidence · text

“Eagle Mountain retains a 20% interest, free-carried until a US$20 million expenditure milestone is met.”

Debt Restructuringpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: The company renegotiated its loan with Vincere, providing a right to extinguish the US$7.25 million principal by repayment of US$2.5 million.

Evidence · text

“A renegotiation of the loan owing to Vincere Resource Holdings LLC (Vincere), providing a 12-month extension to the US$1.5 million repayment due on 25 November 2025 and a 12-month right to extinguish the US$7.25 million principal by repayment of US$2.5 million”

Project Re-acquiredpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: The company announced three agreements structured to provide Eagle Mountain an opportunity of re-acquiring the Oracle Ridge mine.

Evidence · text

“On 5 November 2025, the Company announced three agreements structured to provide Eagle Mountain an opportunity of re-acquiring the Oracle Ridge mine”

Collaboration MOUneutral · Story-specific tag

No canonical definition is currently available.

Why it applies: The Company announced the signing of a non-binding Memorandum of Understanding (MOU) with Nittetsu to identify and evaluate new mineral project opportunities.

Evidence · text

“On 21 July 2026 the Company announced the signing of a non-binding Memorandum of Understanding (MOU) with Nittetsu.”

Placement Completedneutral · Story-specific tag

No canonical definition is currently available.

Why it applies: The placement to sophisticated and professional investors raised approximately $1,655,000.

Evidence · text

“The placement to sophisticated and professional investors raised approximately $1,655,000 before costs at $0.009 per share”

Entitlement Offer Completedneutral · Story-specific tag

No canonical definition is currently available.

Why it applies: The entitlement offer raised approximately A$1.98 million before costs.

Evidence · text

“Shareholders’ applications raised approximately $1.079 million; the subsequent shortfall offer raised an additional $899,000 for a total of approximately A$1.98 million before costs.”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Mineral Resource Statement has been compiled in accordance with the JORC Code 2012.

Evidence · text

“The Company’s Mineral Resource Statement has been compiled in accordance with the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012)”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Mr. Fabio Vergara is a Competent Person as defined in the 2012 Edition of the JORC Code and consents to the inclusion of information relating to Mineral Resources.

Evidence · text

“Mr. Fabio Vergara, who is a member of The Australasian Institute of Mining and Metallurgy and has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code 2012).”

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: The MRE is from November 2023 and the annual report is dated October 2026, making the estimate nearly three years old.

Evidence · text

“November 2023 Oracle Ridge Project Mineral Resource Estimate”

Historical Estimate Onlynegative

Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.

Why it applies: The MRE was re-acquired by the Company in April 2026 and there has been no change to the MRE since it was last reported in the Company’s 30 June 2024 Annual Report.

Evidence · text

“However, there has been no change to the MRE since it was last reported in the Company’s 30 June 2024 Annual Report. The MRE was re-acquired by the Company in April 2026”

Extracted facts

Stored fact records: 15. Some facts used in scoring do not have a stored record.

Resource Estimates (15)

measuredOracle Ridge Copper Project · copperTonnes: 3100000Grade: 1.4Grade Unit: %Contained Metal: 43000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Oracle Ridge Copper Project
Commodity
copper
Region
usa_az
Reported Region
Arizona, USA
Ticker
EM2

Resource scope

Estimate type
resource
Effective date
2023-11-21T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Alex Lukomskyj, Fabio Vergara
Resource group id
resource:06daaa0609e551cdc16f

Resource Data

Category
measured
Tonnes
3100000
Grade
1.4
Grade Unit
%
Contained Metal
43000
Contained Unit
t
Cutoff Grade
0.8
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2023-11-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-11-21T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The Measured resource for copper at Oracle Ridge shows high confidence and a strong grade, but its historical nature and re-presentation reduce its novelty.

Positive factors

  • Measured category indicates high geological confidence.
  • Grade of 1.40% Cu is strong for a copper deposit.

Negative factors

  • The estimate is historical and has not been updated.
  • The estimate is being re-presented, not newly announced.

Evidence · table

“1.40”

Context: 3.1

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

measuredOracle Ridge Copper Project · silverTonnes: 3100000Grade: 13.93Grade Unit: g/tContained Metal: 1.4Contained Unit: mozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Oracle Ridge Copper Project
Commodity
silver
Region
usa_az
Reported Region
Arizona, USA
Ticker
EM2

Resource scope

Estimate type
resource
Effective date
2023-11-21T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Alex Lukomskyj, Fabio Vergara
Resource group id
resource:06daaa0609e551cdc16f

Resource Data

Category
measured
Tonnes
3100000
Grade
13.93
Grade Unit
g/t
Contained Metal
1.4
Contained Unit
moz
Cutoff Grade
0.8
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2023-11-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-11-21T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The Measured resource for silver at Oracle Ridge, while historical, indicates byproduct potential with high confidence.

Positive factors

  • Measured category indicates high geological confidence.
  • Silver grade of 13.93 g/t provides byproduct potential.

Negative factors

  • The estimate is historical and has not been updated.
  • The estimate is being re-presented, not newly announced.

Evidence · table

“13.93”

Context: 3.1

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

measuredOracle Ridge Copper Project · goldTonnes: 3100000Grade: 0.18Grade Unit: g/tContained Metal: 18Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Oracle Ridge Copper Project
Commodity
gold
Region
usa_az
Reported Region
Arizona, USA
Ticker
EM2

Resource scope

Estimate type
resource
Effective date
2023-11-21T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Alex Lukomskyj, Fabio Vergara
Resource group id
resource:06daaa0609e551cdc16f

Resource Data

Category
measured
Tonnes
3100000
Grade
0.18
Grade Unit
g/t
Contained Metal
18
Contained Unit
koz
Cutoff Grade
0.8
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2023-11-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-11-21T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The Measured resource for gold at Oracle Ridge, while historical, indicates byproduct potential with high confidence.

Positive factors

  • Measured category indicates high geological confidence.
  • Gold grade of 0.18 g/t provides byproduct potential.

Negative factors

  • The estimate is historical and has not been updated.
  • The estimate is being re-presented, not newly announced.

Evidence · table

“0.18”

Context: 3.1

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

indicatedOracle Ridge Copper Project · copperTonnes: 12200000Grade: 1.36Grade Unit: %Contained Metal: 166000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Oracle Ridge Copper Project
Commodity
copper
Region
usa_az
Reported Region
Arizona, USA
Ticker
EM2

Resource scope

Estimate type
resource
Effective date
2023-11-21T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Alex Lukomskyj, Fabio Vergara
Resource group id
resource:a17b8aada0d527d2ba08

Resource Data

Category
indicated
Tonnes
12200000
Grade
1.36
Grade Unit
%
Contained Metal
166000
Contained Unit
t
Cutoff Grade
0.8
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2023-11-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-11-21T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The Indicated resource for copper at Oracle Ridge shows good confidence and a strong grade, but its historical nature and re-presentation reduce its novelty.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Grade of 1.36% Cu is strong for a copper deposit.

Negative factors

  • The estimate is historical and has not been updated.
  • The estimate is being re-presented, not newly announced.

Evidence · table

“1.36”

Context: 12.2

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

indicatedOracle Ridge Copper Project · silverTonnes: 12200000Grade: 11.96Grade Unit: g/tContained Metal: 4.7Contained Unit: mozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Oracle Ridge Copper Project
Commodity
silver
Region
usa_az
Reported Region
Arizona, USA
Ticker
EM2

Resource scope

Estimate type
resource
Effective date
2023-11-21T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Alex Lukomskyj, Fabio Vergara
Resource group id
resource:a17b8aada0d527d2ba08

Resource Data

Category
indicated
Tonnes
12200000
Grade
11.96
Grade Unit
g/t
Contained Metal
4.7
Contained Unit
moz
Cutoff Grade
0.8
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2023-11-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-11-21T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The Indicated resource for silver at Oracle Ridge, while historical, indicates byproduct potential with reasonable confidence.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Silver grade of 11.96 g/t provides byproduct potential.

Negative factors

  • The estimate is historical and has not been updated.
  • The estimate is being re-presented, not newly announced.

Evidence · table

“11.96”

Context: 12.2

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

indicatedOracle Ridge Copper Project · goldTonnes: 12200000Grade: 0.18Grade Unit: g/tContained Metal: 71Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Oracle Ridge Copper Project
Commodity
gold
Region
usa_az
Reported Region
Arizona, USA
Ticker
EM2

Resource scope

Estimate type
resource
Effective date
2023-11-21T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Alex Lukomskyj, Fabio Vergara
Resource group id
resource:a17b8aada0d527d2ba08

Resource Data

Category
indicated
Tonnes
12200000
Grade
0.18
Grade Unit
g/t
Contained Metal
71
Contained Unit
koz
Cutoff Grade
0.8
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2023-11-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-11-21T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The Indicated resource for gold at Oracle Ridge, while historical, indicates byproduct potential with reasonable confidence.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Gold grade of 0.18 g/t provides byproduct potential.

Negative factors

  • The estimate is historical and has not been updated.
  • The estimate is being re-presented, not newly announced.

Evidence · table

“0.18”

Context: 12.2

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

inferredOracle Ridge Copper Project · copperTonnes: 13000000Grade: 1.32Grade Unit: %Contained Metal: 171000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Oracle Ridge Copper Project
Commodity
copper
Region
usa_az
Reported Region
Arizona, USA
Ticker
EM2

Resource scope

Estimate type
resource
Effective date
2023-11-21T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Alex Lukomskyj, Fabio Vergara
Resource group id
resource:a3234d2406d04cffaff0

Resource Data

Category
inferred
Tonnes
13000000
Grade
1.32
Grade Unit
%
Contained Metal
171000
Contained Unit
t
Cutoff Grade
0.8
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2023-11-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-11-21T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The Inferred resource for copper at Oracle Ridge, while showing a strong grade, has lower confidence due to its category and historical nature.

Positive factors

  • Grade of 1.32% Cu is strong for a copper deposit.

Negative factors

  • Inferred category indicates lower geological confidence.
  • The estimate is historical and has not been updated.
  • The estimate is being re-presented, not newly announced.

Evidence · table

“1.32”

Context: 13.0

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

inferredOracle Ridge Copper Project · silverTonnes: 13000000Grade: 9.53Grade Unit: g/tContained Metal: 4Contained Unit: mozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Oracle Ridge Copper Project
Commodity
silver
Region
usa_az
Reported Region
Arizona, USA
Ticker
EM2

Resource scope

Estimate type
resource
Effective date
2023-11-21T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Alex Lukomskyj, Fabio Vergara
Resource group id
resource:a3234d2406d04cffaff0

Resource Data

Category
inferred
Tonnes
13000000
Grade
9.53
Grade Unit
g/t
Contained Metal
4
Contained Unit
moz
Cutoff Grade
0.8
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2023-11-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-11-21T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The Inferred resource for silver at Oracle Ridge, while indicating byproduct potential, has lower confidence due to its category and historical nature.

Positive factors

  • Silver grade of 9.53 g/t provides byproduct potential.

Negative factors

  • Inferred category indicates lower geological confidence.
  • The estimate is historical and has not been updated.
  • The estimate is being re-presented, not newly announced.

Evidence · table

“9.53”

Context: 13.0

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

inferredOracle Ridge Copper Project · goldTonnes: 13000000Grade: 0.13Grade Unit: g/tContained Metal: 53Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Oracle Ridge Copper Project
Commodity
gold
Region
usa_az
Reported Region
Arizona, USA
Ticker
EM2

Resource scope

Estimate type
resource
Effective date
2023-11-21T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Alex Lukomskyj, Fabio Vergara
Resource group id
resource:a3234d2406d04cffaff0

Resource Data

Category
inferred
Tonnes
13000000
Grade
0.13
Grade Unit
g/t
Contained Metal
53
Contained Unit
koz
Cutoff Grade
0.8
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2023-11-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-11-21T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The Inferred resource for gold at Oracle Ridge, while indicating byproduct potential, has lower confidence due to its category and historical nature.

Positive factors

  • Gold grade of 0.13 g/t provides byproduct potential.

Negative factors

  • Inferred category indicates lower geological confidence.
  • The estimate is historical and has not been updated.
  • The estimate is being re-presented, not newly announced.

Evidence · table

“0.13”

Context: 13.0

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

indicatedOracle Ridge Copper Project · copperTonnes: 15300000Grade: 1.37Grade Unit: %Contained Metal: 209000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Oracle Ridge Copper Project
Commodity
copper
Region
usa_az
Reported Region
Arizona, USA
Ticker
EM2

Resource scope

Estimate type
resource
Effective date
2023-11-21T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Alex Lukomskyj, Fabio Vergara
Resource group id
resource:61bf3048a49350426ae0

Resource Data

Category
indicated
Tonnes
15300000
Grade
1.37
Grade Unit
%
Contained Metal
209000
Contained Unit
t
Cutoff Grade
0.8
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2023-11-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-11-21T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The combined M+I resource for copper at Oracle Ridge shows good confidence and a strong grade, but its historical nature and re-presentation reduce its novelty.

Positive factors

  • Combined Measured and Indicated resource provides good confidence.
  • Grade of 1.37% Cu is strong for a copper deposit.

Negative factors

  • The estimate is historical and has not been updated.
  • The estimate is being re-presented, not newly announced.

Evidence · table

“1.37”

Context: 15.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

indicatedOracle Ridge Copper Project · silverTonnes: 15300000Grade: 12.35Grade Unit: g/tContained Metal: 6.1Contained Unit: mozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Oracle Ridge Copper Project
Commodity
silver
Region
usa_az
Reported Region
Arizona, USA
Ticker
EM2

Resource scope

Estimate type
resource
Effective date
2023-11-21T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Alex Lukomskyj, Fabio Vergara
Resource group id
resource:61bf3048a49350426ae0

Resource Data

Category
indicated
Tonnes
15300000
Grade
12.35
Grade Unit
g/t
Contained Metal
6.1
Contained Unit
moz
Cutoff Grade
0.8
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2023-11-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-11-21T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The combined M+I resource for silver at Oracle Ridge, while historical, indicates byproduct potential with good confidence.

Positive factors

  • Combined Measured and Indicated resource provides good confidence.
  • Silver grade of 12.35 g/t provides byproduct potential.

Negative factors

  • The estimate is historical and has not been updated.
  • The estimate is being re-presented, not newly announced.

Evidence · table

“12.35”

Context: 15.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

indicatedOracle Ridge Copper Project · goldTonnes: 15300000Grade: 0.18Grade Unit: g/tContained Metal: 89Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Oracle Ridge Copper Project
Commodity
gold
Region
usa_az
Reported Region
Arizona, USA
Ticker
EM2

Resource scope

Estimate type
resource
Effective date
2023-11-21T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Alex Lukomskyj, Fabio Vergara
Resource group id
resource:61bf3048a49350426ae0

Resource Data

Category
indicated
Tonnes
15300000
Grade
0.18
Grade Unit
g/t
Contained Metal
89
Contained Unit
koz
Cutoff Grade
0.8
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2023-11-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-11-21T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The combined M+I resource for gold at Oracle Ridge, while historical, indicates byproduct potential with good confidence.

Positive factors

  • Combined Measured and Indicated resource provides good confidence.
  • Gold grade of 0.18 g/t provides byproduct potential.

Negative factors

  • The estimate is historical and has not been updated.
  • The estimate is being re-presented, not newly announced.

Evidence · table

“0.18”

Context: 15.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

inferredOracle Ridge Copper Project · copperTonnes: 28200000Grade: 1.35Grade Unit: %Contained Metal: 380000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Oracle Ridge Copper Project
Commodity
copper
Region
usa_az
Reported Region
Arizona, USA
Ticker
EM2

Resource scope

Estimate type
resource
Effective date
2023-11-21T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Alex Lukomskyj, Fabio Vergara
Resource group id
resource:05c81759241bee30162c

Resource Data

Category
inferred
Tonnes
28200000
Grade
1.35
Grade Unit
%
Contained Metal
380000
Contained Unit
t
Cutoff Grade
0.8
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2023-11-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-11-21T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The total resource for copper at Oracle Ridge is substantial with a strong grade, but the high proportion of Inferred material and its historical nature reduce confidence and novelty.

Positive factors

  • Total resource of 28.2 Mt at 1.35% Cu is substantial.
  • Grade of 1.35% Cu is strong for a copper deposit.

Negative factors

  • A significant portion of the total resource is in the Inferred category.
  • The estimate is historical and has not been updated.
  • The estimate is being re-presented, not newly announced.

Evidence · table

“1.35”

Context: 28.2

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

inferredOracle Ridge Copper Project · silverTonnes: 28200000Grade: 11.06Grade Unit: g/tContained Metal: 10Contained Unit: mozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Oracle Ridge Copper Project
Commodity
silver
Region
usa_az
Reported Region
Arizona, USA
Ticker
EM2

Resource scope

Estimate type
resource
Effective date
2023-11-21T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Alex Lukomskyj, Fabio Vergara
Resource group id
resource:05c81759241bee30162c

Resource Data

Category
inferred
Tonnes
28200000
Grade
11.06
Grade Unit
g/t
Contained Metal
10
Contained Unit
moz
Cutoff Grade
0.8
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2023-11-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-11-21T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The total resource for silver at Oracle Ridge is substantial, but the high proportion of Inferred material and its historical nature reduce confidence and novelty.

Positive factors

  • Total contained silver of 10.0 MOz is substantial.
  • Silver grade of 11.06 g/t provides byproduct potential.

Negative factors

  • A significant portion of the total resource is in the Inferred category.
  • The estimate is historical and has not been updated.
  • The estimate is being re-presented, not newly announced.

Evidence · table

“11.06”

Context: 28.2

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

inferredOracle Ridge Copper Project · goldTonnes: 28200000Grade: 0.16Grade Unit: g/tContained Metal: 142Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Oracle Ridge Copper Project
Commodity
gold
Region
usa_az
Reported Region
Arizona, USA
Ticker
EM2

Resource scope

Estimate type
resource
Effective date
2023-11-21T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Alex Lukomskyj, Fabio Vergara
Resource group id
resource:05c81759241bee30162c

Resource Data

Category
inferred
Tonnes
28200000
Grade
0.16
Grade Unit
g/t
Contained Metal
142
Contained Unit
koz
Cutoff Grade
0.8
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2023-11-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-11-21T00:00:00.000Z

Dates

Event date
2026-10-22T00:00:00.000Z

Reasoning: The total resource for gold at Oracle Ridge is substantial, but the high proportion of Inferred material and its historical nature reduce confidence and novelty.

Positive factors

  • Total contained gold of 142 kOz is substantial.
  • Gold grade of 0.16 g/t provides byproduct potential.

Negative factors

  • A significant portion of the total resource is in the Inferred category.
  • The estimate is historical and has not been updated.
  • The estimate is being re-presented, not newly announced.

Evidence · table

“0.16”

Context: 28.2

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.9 years before this release

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.