# Element 29 Engages Synectiq to Advance Resource Modelling and Metallurgical Test Work at its Elida Porphyry Cu-Mo-Ag Deposit, Peru

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/element-29-engages-synectiq-to-advance-resource-modelling-and-metallurgical-test--cf04b796-ae74-4a34-91ba-6fb66071f904

Original source: https://money.tmx.com/en/quote/ECU/news/6888620655125617/element-29-engages-synectiq-to-advance-resource-modelling-and-metallurgical-test

Publisher: tmx

Original announcement: 2026-05-07T11:30:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: Unknown date

Atlas analysis updated: Unknown date

- Company: Element 29 Resources Inc.

- Ticker: ECU

- Exchange: TSX

- Region: Peru

- Primary commodity: Copper

- Secondary commodities: Molybdenum, Silver

- Document categories: Resource update, Metallurgy

- Extracted: 2026-08-24 05:46:13 UTC

Narrative sentiment: 0.40 · Bullish

## Minestarters Atlas summary

Element 29 has engaged Synectiq to support resource modelling and metallurgical test work at its Elida porphyry deposit in Peru. The work follows Phase 3 drilling that extended copper mineralization beyond the existing pit shell and aims to support an updated Mineral Resource Estimate by year-end.

Reasoning: The announcement details the engagement of a consultant to advance resource modelling and metallurgical testing, driven by recent drilling that extended mineralization. While no new assay values are provided, the intent to update the MRE is a significant project milestone.

- Positive factor: extension of copper mineralization beyond current pit shell

- Positive factor: engagement of specialist consultant for resource and metallurgical advancement

- Positive factor: upcoming MRE expected by year-end

Facts used in scoring: 3

## Classification and evidence

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The reported resource is explicitly categorized as an inferred MRE.

Evidence · text

> initial pit-constrained inferred MRE

**Resource Update**

Polarity: neutral

Definition: Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The company is engaging a consultant specifically to prepare an updated Mineral Resource Estimate.

Evidence · text

> support the preparation of an updated Mineral Resource Estimate

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: The release states the technical content was reviewed and approved by a Qualified Person \(Richard Osmond, P.Geo\).

Evidence · text

> reviewed and approved by Richard Osmond, P.Geo., Element 29's President and CEO, who is the "Qualified Person"

## Extracted facts

Stored fact records: 3. Some facts used in scoring do not have a stored record.

## Resource Estimates (3)

### inferred

[Link to this fact](https://atlas-staging.minestarters.com/news/element-29-engages-synectiq-to-advance-resource-modelling-and-metallurgical-test--cf04b796-ae74-4a34-91ba-6fb66071f904#fact-resource-facts-0)

copper

Historical result

Needs review: historical\_restatement

#### Identity

- Commodity: copper
- Ticker: ECU

#### Resource Data

- Category: inferred
- Tonnes: 321700000
- Grade: 0.32
- Grade Unit: %
- Cutoff Grade: 0.2

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2022-09-20T00:00:00.000Z

#### Dates

- Event date: 2026-05-07T00:00:00.000Z

Reasoning: This is a restatement of the existing pit-constrained inferred resource from the 2022 MRE.

Evidence · text

> initial pit-constrained inferred MRE of 321.7 million tonnes grading 0.32% Cu

### inferred

[Link to this fact](https://atlas-staging.minestarters.com/news/element-29-engages-synectiq-to-advance-resource-modelling-and-metallurgical-test--cf04b796-ae74-4a34-91ba-6fb66071f904#fact-resource-facts-1)

molybdenum

Historical result

Needs review: historical\_restatement

#### Identity

- Commodity: molybdenum
- Ticker: ECU

#### Resource Data

- Category: inferred
- Tonnes: 321700000
- Grade: 0.03
- Grade Unit: %
- Cutoff Grade: 0.2

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2022-09-20T00:00:00.000Z

#### Dates

- Event date: 2026-05-07T00:00:00.000Z

Reasoning: Restatement of historical resource component.

Evidence · text

> 321.7 million tonnes grading 0.32% Cu, 0.03% Mo

### inferred

[Link to this fact](https://atlas-staging.minestarters.com/news/element-29-engages-synectiq-to-advance-resource-modelling-and-metallurgical-test--cf04b796-ae74-4a34-91ba-6fb66071f904#fact-resource-facts-2)

silver

Historical result

Needs review: historical\_restatement

#### Identity

- Commodity: silver
- Ticker: ECU

#### Resource Data

- Category: inferred
- Tonnes: 321700000
- Grade: 2.61
- Grade Unit: g/t
- Cutoff Grade: 0.2

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2022-09-20T00:00:00.000Z

#### Dates

- Event date: 2026-05-07T00:00:00.000Z

Reasoning: Restatement of historical resource component.

Evidence · text

> 321.7 million tonnes grading 0.32% Cu, 0.03% Mo and 2.61 g/t Ag

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
