EL8: Annual Report to shareholders

Original announcement by asx on

Company
Elevate Uranium Limited
Ticker
EL8
Exchange
ASX
Region
Unavailable
Primary commodity
Uranium
Secondary commodities
None reported
Document categories
Other, Metallurgy, Resource update, Drill results
Extracted
2026-10-15 07:06:39 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Elevate Uranium Limited reported significant progress in its 2026 Annual Report, highlighted by the successful pilot-scale operation of its proprietary U-pgrade™ beneficiation process in Namibia, which achieved 88% mass rejection and 79% uranium recovery in its first four stages. The company also substantially increased its total uranium Mineral Resource inventory to 181 Mlb U3O8, with notable increases at Marenica and Koppies, and maiden resources at Hirabeb and Namib IV. These technical advancements were supported by a successful $25 million capital raise and the acquisition of the Napperby Uranium Project.

Reasoning: Elevate Uranium Limited reported a highly successful year, marked by the advancement of its proprietary U-pgrade™ beneficiation process through pilot-scale operation with strong initial results, and a substantial increase in its total uranium Mineral Resource inventory across multiple projects. These technical achievements were complemented by a significant capital raise and strategic project acquisitions, positioning the company for future development.

Positive factors

  • Successful pilot plant operation for U-pgrade™ beneficiation process, achieving high mass rejection and uranium recovery in initial stages.
  • Significant increase in total uranium Mineral Resource inventory to 181 Mlb U3O8.
  • Substantial resource grade improvement at Marenica (doubled to 180 ppm U3O8).
  • Maiden resource estimates for Hirabeb and Namib IV projects.
  • Successful $25 million capital raise in October 2025.
  • Acquisition of Napperby Uranium Project, adding 8.0 Mlb U3O8.
  • JORC 2012 compliant resource estimates with named Competent Persons.

Negative factors

  • Pilot plant results for the final (fifth) stage of the U-pgrade™ process are still pending.
  • Some drill results are outside current resource areas, indicating early-stage exploration.
  • Angela drilling did not yield mineralization at the principal deep seismic reflector target.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 29

Classification and evidence

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: the document describes a flotation route ("flotation")

Single Domain Onlynegative

Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

Extracted facts

Stored fact records: 29. Some facts used in scoring do not have a stored record.

Drill Results (10)

MAR1661Marenica Uranium · uraniumGrade: 300Grade Unit: ppm eU3O8Intercept: 9 mView all details
Link to this fact

Identity

Hole ID
MAR1661
Project
Marenica Uranium
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
EL8

Geometry

Grade
300
Grade Unit
ppm eU3O8
Intercept
9 m
From
3 m
To
12 m
Intercept Depth
3 m

Classification

Program
exploration
Sample Type
drill
Group ID
MAR1661:3-12

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: This intercept shows moderate uranium grades over a good width, but its location outside the current resource area suggests it is part of early-stage exploration.

Positive factors

  • Moderate grade (300 ppm eU3O8) for uranium.
  • Good intercept length (9.0 m).

Negative factors

  • Intercept is outside of the current resource area, indicating early-stage exploration.

Evidence · table

“300”

Context: 9.0

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

MAR2289Marenica Uranium · uraniumGrade: 439Grade Unit: ppm eU3O8Intercept: 12 mView all details
Link to this fact

Identity

Hole ID
MAR2289
Project
Marenica Uranium
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
EL8

Geometry

Grade
439
Grade Unit
ppm eU3O8
Intercept
12 m
From
14 m
To
26 m
Intercept Depth
14 m

Classification

Program
exploration
Sample Type
drill
Group ID
MAR2289:14-26

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: This intercept shows moderate uranium grades over a strong width, but its location outside the current resource area suggests it is part of early-stage exploration.

Positive factors

  • Moderate grade (439 ppm eU3O8) for uranium.
  • Strong intercept length (12.0 m).

Negative factors

  • Intercept is outside of the current resource area, indicating early-stage exploration.

Evidence · table

“439”

Context: 12.0

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

MAR1964Marenica Uranium · uraniumGrade: 748Grade Unit: ppm eU3O8Intercept: 2.9 mView all details
Link to this fact

Identity

Hole ID
MAR1964
Project
Marenica Uranium
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
EL8

Geometry

Grade
748
Grade Unit
ppm eU3O8
Intercept
2.9 m
From
30.1 m
To
33 m
Intercept Depth
30.1 m

Classification

Program
exploration
Sample Type
drill
Group ID
MAR1964:30.1-33

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: This intercept shows moderate uranium grades, but its narrow width and location outside the current resource area suggest it is part of early-stage exploration.

Positive factors

  • Moderate grade (748 ppm eU3O8) for uranium.

Negative factors

  • Narrow intercept length (2.9 m).
  • Intercept is outside of the current resource area, indicating early-stage exploration.

Evidence · table

“748”

Context: 2.9

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

HIR1722Hirabeb Resource · uraniumGrade: 194Grade Unit: ppm eU3O8Intercept: 24.5 mView all details
Link to this fact

Identity

Hole ID
HIR1722
Project
Hirabeb Resource
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
EL8

Geometry

Grade
194
Grade Unit
ppm eU3O8
Intercept
24.5 m
From
5 m
To
29.5 m
Intercept Depth
5 m

Classification

Program
exploration
Sample Type
drill
Group ID
HIR1722:5-29.5

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: This intercept shows economic uranium grades over a strong width, but its location outside the current resource area suggests it is part of early-stage exploration.

Positive factors

  • Strong intercept length (24.5 m).
  • Economic grade (194 ppm eU3O8) for uranium.

Negative factors

  • Intercept is outside of the current resource area, indicating early-stage exploration.

Evidence · table

“194”

Context: 24.5

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

HIR1863Hirabeb Resource · uraniumGrade: 367Grade Unit: ppm eU3O8Intercept: 8 mView all details
Link to this fact

Identity

Hole ID
HIR1863
Project
Hirabeb Resource
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
EL8

Geometry

Grade
367
Grade Unit
ppm eU3O8
Intercept
8 m
From
2 m
To
10 m
Intercept Depth
2 m

Classification

Program
exploration
Sample Type
drill
Group ID
HIR1863:2-10

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: This intercept shows moderate uranium grades over a moderate width, but its location outside the current resource area suggests it is part of early-stage exploration.

Positive factors

  • Moderate grade (367 ppm eU3O8) for uranium.
  • Moderate intercept length (8.0 m).

Negative factors

  • Intercept is outside of the current resource area, indicating early-stage exploration.

Evidence · table

“367”

Context: 8.0

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

NIV1354Namib IV Resource · uraniumGrade: 394Grade Unit: ppm eU3O8Intercept: 26.5 mView all details
Link to this fact

Identity

Hole ID
NIV1354
Project
Namib IV Resource
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
EL8

Geometry

Grade
394
Grade Unit
ppm eU3O8
Intercept
26.5 m
True Width
26.5 m
From
3.5 m
To
30 m
Intercept Depth
3.5 m

Classification

Program
exploration
Sample Type
drill
Group ID
NIV1354:3.5-30

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: This intercept shows moderate uranium grades over a continuous true width, indicating potential for resource extension outside the current area.

Positive factors

  • Moderate grade (394 ppm eU3O8) for uranium.
  • Continuous intercept length (26.5 m) with true width stated.
  • Intercept is outside of the current resource area, indicating potential for extension.

Evidence · table

“394”

Context: 26.5

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 26.5

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

NIV0349Namib IV Resource · uraniumGrade: 2053Grade Unit: ppm eU3O8Intercept: 3.5 mView all details
Link to this fact

Identity

Hole ID
NIV0349
Project
Namib IV Resource
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
EL8

Geometry

Grade
2053
Grade Unit
ppm eU3O8
Intercept
3.5 m
True Width
3.5 m
From
3.5 m
To
7 m
Intercept Depth
3.5 m

Classification

Program
exploration
Sample Type
drill
Group ID
NIV0349:3.5-7

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: This intercept shows strong uranium grades over a narrow true width, indicating potential for resource extension outside the current area.

Positive factors

  • Strong grade (2,053 ppm eU3O8) for uranium.
  • True width stated (3.5 m).
  • Intercept is outside of the current resource area, indicating potential for extension.

Evidence · table

“2,053”

Context: 3.5

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 3.5

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

D25.000Namib IV Resource · uraniumGrade: 516Grade Unit: ppm eU3O8Intercept: 7 mView all details
Link to this fact

Identity

Hole ID
D25.000
Project
Namib IV Resource
Commodity
uranium
Region
namibia
Reported Region
namibia
Ticker
EL8

Geometry

Grade
516
Grade Unit
ppm eU3O8
Intercept
7 m
True Width
7 m
From
2 m
To
9 m
Intercept Depth
2 m

Classification

Program
exploration
Sample Type
drill
Group ID
D25.000:2-9

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: This intercept shows moderate uranium grades over a moderate true width, indicating potential for resource extension outside the current area.

Positive factors

  • Moderate grade (516 ppm eU3O8) for uranium.
  • Moderate intercept length (7.0 m) with true width stated.
  • Intercept is outside of the current resource area, indicating potential for extension.

Evidence · table

“516”

Context: 7.0

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 7

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

ANG0002Angela · uraniumGrade: 1421Grade Unit: ppm eU3O8Intercept: 1.4 mView all details
Link to this fact

Identity

Hole ID
ANG0002
Project
Angela
Commodity
uranium
Region
nt
Reported Region
nt
Ticker
EL8

Geometry

Grade
1421
Grade Unit
ppm eU3O8
Intercept
1.4 m
From
447.4 m
To
448.8 m
Intercept Depth
447.4 m

Classification

Program
exploration
Sample Type
drill
Group ID
ANG0002:447.4-448.8

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: This intercept shows moderate uranium grades over a narrow width, but the overall drilling program did not achieve its primary exploration objective at the deep target.

Positive factors

  • Moderate grade (1,421 ppm eU3O8) for uranium.

Negative factors

  • Narrow intercept length (1.4 m).
  • Drilling did not yield mineralization at the principal deep seismic reflector target.

Evidence · table

“1,421”

Context: 1.4

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

ANG0002Angela · uraniumGrade: 2884Grade Unit: ppm eU3O8Intercept: 0.6 mView all details
Link to this fact

Identity

Hole ID
ANG0002
Project
Angela
Commodity
uranium
Region
nt
Reported Region
nt
Ticker
EL8

Geometry

Grade
2884
Grade Unit
ppm eU3O8
Intercept
0.6 m
From
447.7 m
To
448.3 m
Intercept Depth
447.7 m

Classification

Program
exploration
Sample Type
drill
Group ID
ANG0002:447.7-448.3

QA/QC

QA/QC Disclosed
Yes
QP Signed
Yes

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: This sub-interval shows strong uranium grades, but its very narrow width and the overall program's failure to hit the primary deep target limit its materiality.

Positive factors

  • Strong grade (2,884 ppm eU3O8) for uranium.

Negative factors

  • Very narrow intercept length (0.6 m).
  • Drilling did not yield mineralization at the principal deep seismic reflector target.

Evidence · table

“2,884”

Context: 0.6

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Resource Estimates (17)

indicatedKoppies Project · uraniumTonnes: 98000000Grade: 200Grade Unit: ppm U3O8Contained Metal: 43.6Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Koppies Project
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:3f45fc3e66503fa5ff36
Deposit or zone
Koppies
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
98000000
Grade
200
Grade Unit
ppm U3O8
Contained Metal
43.6
Contained Unit
mlb u3o8
Cutoff Grade
100
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The Koppies project has a substantial indicated resource with an economic grade, providing a strong foundation for future development and high confidence in the estimate.

Positive factors

  • Large indicated resource (43.6 Mlb U3O8) provides high confidence for project development.
  • Economic grade (200 ppm U3O8) for uranium deposits.
  • 100% ownership by the company.

Evidence · table

“200”

Context: 98.0

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredKoppies Project · uraniumTonnes: 35400000Grade: 160Grade Unit: ppm U3O8Contained Metal: 12.3Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Koppies Project
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:f1fcd3a2b7648bcdc5b8
Deposit or zone
Koppies
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
35400000
Grade
160
Grade Unit
ppm U3O8
Contained Metal
12.3
Contained Unit
mlb u3o8
Cutoff Grade
100
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The Koppies project includes a substantial inferred resource at an economic grade, contributing to the overall project scale, but its inferred classification suggests a need for additional drilling to improve confidence.

Positive factors

  • Significant inferred resource (12.3 Mlb U3O8) adds to overall project scale.
  • Economic grade (160 ppm U3O8) for uranium deposits.

Negative factors

  • Inferred category indicates lower geological confidence, requiring further drilling for upgrade.

Evidence · table

“160”

Context: 35.4

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredKoppies Project · uraniumTonnes: 23300000Grade: 200Grade Unit: ppm U3O8Contained Metal: 10.2Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Koppies Project
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:40f6aa9a3ec2d6c578ed
Deposit or zone
Hirabeb
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
23300000
Grade
200
Grade Unit
ppm U3O8
Contained Metal
10.2
Contained Unit
mlb u3o8
Cutoff Grade
100
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The maiden inferred resource at Hirabeb adds new potential to the Koppies project with an economic grade, but its inferred classification means more work is needed to increase confidence.

Positive factors

  • Maiden inferred resource (10.2 Mlb U3O8) adds new potential to the Koppies project area.
  • Economic grade (200 ppm U3O8) for uranium deposits.

Negative factors

  • Inferred category indicates lower geological confidence, requiring further drilling for upgrade.

Evidence · table

“200”

Context: 23.3

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredKoppies Project · uraniumTonnes: 29500000Grade: 155Grade Unit: ppm U3O8Contained Metal: 10.1Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Koppies Project
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:5f5381c55e09d238664e
Deposit or zone
Namib IV
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
29500000
Grade
155
Grade Unit
ppm U3O8
Contained Metal
10.1
Contained Unit
mlb u3o8
Cutoff Grade
100
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The maiden inferred resource at Namib IV contributes new potential to the Koppies project with an economic grade, but its inferred classification means more work is needed to increase confidence.

Positive factors

  • Maiden inferred resource (10.1 Mlb U3O8) adds new potential to the Koppies project area.
  • Economic grade (155 ppm U3O8) for uranium deposits.

Negative factors

  • Inferred category indicates lower geological confidence, requiring further drilling for upgrade.

Evidence · table

“155”

Context: 29.5

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedMarenica Uranium Project · uraniumTonnes: 16800000Grade: 205Grade Unit: ppm U3O8Contained Metal: 7.5Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Marenica Uranium Project
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:25e227517c2d637ec669
Deposit or zone
Marenica
Ownership percent
75 %

Resource Data

Category
indicated
Tonnes
16800000
Grade
205
Grade Unit
ppm U3O8
Contained Metal
7.5
Contained Unit
mlb u3o8
Cutoff Grade
100
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The Marenica project saw a significant increase in its indicated resource grade, improving project economics and providing good geological confidence for future studies.

Positive factors

  • Significant increase in resource grade (doubled to 180 ppm U3O8 overall) improves project economics.
  • Economic grade (205 ppm U3O8) for uranium deposits.
  • Indicated category provides good geological confidence.

Evidence · table

“205”

Context: 16.8

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredMarenica Uranium Project · uraniumTonnes: 117700000Grade: 175Grade Unit: ppm U3O8Contained Metal: 45.3Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Marenica Uranium Project
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:74b35620f4dabcfb1114
Deposit or zone
Marenica
Ownership percent
75 %

Resource Data

Category
inferred
Tonnes
117700000
Grade
175
Grade Unit
ppm U3O8
Contained Metal
45.3
Contained Unit
mlb u3o8
Cutoff Grade
100
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The Marenica project's inferred resource shows a significant grade increase and adds substantial contained metal, but its inferred classification means more work is needed to improve confidence.

Positive factors

  • Significant increase in resource grade (doubled to 180 ppm U3O8 overall) improves project economics.
  • Large inferred resource (45.3 Mlb U3O8) adds to overall project scale.
  • Economic grade (175 ppm U3O8) for uranium deposits.

Negative factors

  • Inferred category indicates lower geological confidence, requiring further drilling for upgrade.

Evidence · table

“175”

Context: 117.7

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredAngela · uraniumTonnes: 10700000Grade: 1310Grade Unit: ppm U3O8Contained Metal: 30.8Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Angela
Commodity
uranium
Region
nt
Reported Region
NT
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:2268cd1bb5b730321b09
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
10700000
Grade
1310
Grade Unit
ppm U3O8
Contained Metal
30.8
Contained Unit
mlb u3o8
Cutoff Grade
300
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The Angela project holds a high-grade inferred resource with significant contained metal, indicating strong potential, but its inferred classification requires further work to increase confidence.

Positive factors

  • High-grade inferred resource (1,310 ppm U3O8) indicates strong potential.
  • Significant contained metal (30.8 Mlb U3O8).

Negative factors

  • Inferred category indicates lower geological confidence, requiring further drilling for upgrade.

Evidence · table

“1,310”

Context: 10.7

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredNapperby · uraniumTonnes: 9500000Grade: 382Grade Unit: ppm U3O8Contained Metal: 8Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Napperby
Commodity
uranium
Region
nt
Reported Region
NT
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:12c94c8151935caa9e76
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
9500000
Grade
382
Grade Unit
ppm U3O8
Contained Metal
8
Contained Unit
mlb u3o8
Cutoff Grade
200
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The Napperby project, acquired during the year, adds a high-grade inferred resource with synergy to the company's beneficiation process, but its inferred classification means more work is needed to increase confidence.

Positive factors

  • Maiden inferred resource for the company (8.0 Mlb U3O8) adds new project to portfolio.
  • High-grade inferred resource (382 ppm U3O8) indicates good potential.
  • Technical synergy with U-pgrade™ beneficiation process.

Negative factors

  • Inferred category indicates lower geological confidence, requiring further drilling for upgrade.

Evidence · table

“382”

Context: 9.5

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredThatcher Soak · uraniumTonnes: 11600000Grade: 425Grade Unit: ppm U3O8Contained Metal: 10.9Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Thatcher Soak
Commodity
uranium
Region
wa
Reported Region
WA
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:22fc7f880a4c281a713c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
11600000
Grade
425
Grade Unit
ppm U3O8
Contained Metal
10.9
Contained Unit
mlb u3o8
Cutoff Grade
150
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The Thatcher Soak project holds a high-grade inferred resource with significant contained metal, indicating good potential, but its inferred classification requires further work to increase confidence.

Positive factors

  • High-grade inferred resource (425 ppm U3O8) indicates good potential.
  • Significant contained metal (10.9 Mlb U3O8).

Negative factors

  • Inferred category indicates lower geological confidence, requiring further drilling for upgrade.

Evidence · table

“425”

Context: 11.6

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

measuredBigrlyi Deposit · uraniumTonnes: 1700000Grade: 1300Grade Unit: ppm U3O8Contained Metal: 4.9Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Bigrlyi Deposit
Commodity
uranium
Region
nt
Reported Region
NT
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:a545ca9168b9e5a99b01
Ownership percent
20.87 %

Resource Data

Category
measured
Tonnes
1700000
Grade
1300
Grade Unit
ppm U3O8
Contained Metal
4.9
Contained Unit
mlb u3o8
Cutoff Grade
500
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The Bigrlyi project has a high-grade measured resource, indicating very high geological confidence and strong potential for development.

Positive factors

  • High-grade measured resource (1,300 ppm U3O8) provides highest geological confidence.
  • Significant contained metal (4.9 Mlb U3O8) for the measured category.

Evidence · table

“1,300”

Context: 1.7

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedBigrlyi Deposit · uraniumTonnes: 3800000Grade: 1410Grade Unit: ppm U3O8Contained Metal: 11.7Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Bigrlyi Deposit
Commodity
uranium
Region
nt
Reported Region
NT
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:5664b732678c9ad2f228
Ownership percent
20.87 %

Resource Data

Category
indicated
Tonnes
3800000
Grade
1410
Grade Unit
ppm U3O8
Contained Metal
11.7
Contained Unit
mlb u3o8
Cutoff Grade
500
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The Bigrlyi project has a high-grade indicated resource, providing good geological confidence and strong potential for development.

Positive factors

  • High-grade indicated resource (1,410 ppm U3O8) provides good geological confidence.
  • Significant contained metal (11.7 Mlb U3O8).

Evidence · table

“1,410”

Context: 3.8

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredBigrlyi Deposit · uraniumTonnes: 2500000Grade: 1340Grade Unit: ppm U3O8Contained Metal: 7.4Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Bigrlyi Deposit
Commodity
uranium
Region
nt
Reported Region
NT
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:bf44fb28aea8201cdb5e
Ownership percent
20.87 %

Resource Data

Category
inferred
Tonnes
2500000
Grade
1340
Grade Unit
ppm U3O8
Contained Metal
7.4
Contained Unit
mlb u3o8
Cutoff Grade
500
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The Bigrlyi project has a high-grade inferred resource with strong potential, but its inferred classification means more work is needed to increase confidence.

Positive factors

  • High-grade inferred resource (1,340 ppm U3O8) indicates strong potential.
  • Significant contained metal (7.4 Mlb U3O8).

Negative factors

  • Inferred category indicates lower geological confidence, requiring further drilling for upgrade.

Evidence · table

“1,340”

Context: 2.5

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredWalbiri Joint Venture · uraniumTonnes: 5100000Grade: 636Grade Unit: ppm U3O8Contained Metal: 7.1Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Walbiri Joint Venture
Commodity
uranium
Region
nt
Reported Region
NT
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:b42d1674d423f3b349b8
Ownership percent
22.88 %

Resource Data

Category
inferred
Tonnes
5100000
Grade
636
Grade Unit
ppm U3O8
Contained Metal
7.1
Contained Unit
mlb u3o8
Cutoff Grade
200
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The Walbiri Joint Venture holds a high-grade inferred resource with good potential, but its inferred classification means more work is needed to increase confidence.

Positive factors

  • High-grade inferred resource (636 ppm U3O8) indicates good potential.
  • Significant contained metal (7.1 Mlb U3O8).

Negative factors

  • Inferred category indicates lower geological confidence, requiring further drilling for upgrade.

Evidence · table

“636”

Context: 5.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredSundberg · uraniumTonnes: 1010000Grade: 259Grade Unit: ppm U3O8Contained Metal: 0.57Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Sundberg
Commodity
uranium
Region
nt
Reported Region
NT
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:c471e58f720dd9f40a28
Ownership percent
20.87 %

Resource Data

Category
inferred
Tonnes
1010000
Grade
259
Grade Unit
ppm U3O8
Contained Metal
0.57
Contained Unit
mlb u3o8
Cutoff Grade
200
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The Sundberg project has an inferred resource with an economic grade, but its small scale and inferred classification mean it is less material and requires further work.

Positive factors

  • Economic grade (259 ppm U3O8) for uranium deposits.

Negative factors

  • Inferred category indicates lower geological confidence, requiring further drilling for upgrade.
  • Relatively small contained metal (0.57 Mlb U3O8).

Evidence · table

“259”

Context: 1.01

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredHill One Joint Venture · uraniumTonnes: 80000Grade: 208Grade Unit: ppm U3O8View all details
Link to this fact

Identity

Project
Hill One Joint Venture
Commodity
uranium
Region
nt
Reported Region
NT
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:385200e2409a8aa06c12
Ownership percent
20.87 %

Resource Data

Category
inferred
Tonnes
80000
Grade
208
Grade Unit
ppm U3O8
Cutoff Grade
200
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The Hill One Joint Venture has a very small inferred resource, making it less material despite an economic grade, and requiring significant further work to be meaningful.

Positive factors

  • Economic grade (208 ppm U3O8) for uranium deposits.

Negative factors

  • Very small tonnage (0.08 Mt) and contained metal.
  • Inferred category indicates lower geological confidence.

Evidence · table

“208”

Context: 0.08

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredKarins · uraniumTonnes: 1240000Grade: 556Grade Unit: ppm U3O8Contained Metal: 1.52Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Karins
Commodity
uranium
Region
nt
Reported Region
NT
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:bd96772604c254464f7e
Ownership percent
20.87 %

Resource Data

Category
inferred
Tonnes
1240000
Grade
556
Grade Unit
ppm U3O8
Contained Metal
1.52
Contained Unit
mlb u3o8
Cutoff Grade
200
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The Karins project has a high-grade inferred resource with good potential, but its inferred classification means more work is needed to increase confidence.

Positive factors

  • High-grade inferred resource (556 ppm U3O8) indicates good potential.

Negative factors

  • Inferred category indicates lower geological confidence, requiring further drilling for upgrade.

Evidence · table

“556”

Context: 1.24

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredMalawiri Joint Venture · uraniumTonnes: 420000Grade: 1288Grade Unit: ppm U3O8Contained Metal: 1.2Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Malawiri Joint Venture
Commodity
uranium
Region
nt
Reported Region
NT
Ticker
EL8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr David Princep, Mr Daniel Guibal, Mr Peter Gleeson, Mr Arnold van der Heyden, Mr Dimitry Pertel, Dr Maxim Seredkin, Mr Ian Glacken, Mr Mark Menzies
Resource group id
resource:b5e2d06cd17a2484618a
Ownership percent
23.97 %

Resource Data

Category
inferred
Tonnes
420000
Grade
1288
Grade Unit
ppm U3O8
Contained Metal
1.2
Contained Unit
mlb u3o8
Cutoff Grade
100
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The Malawiri Joint Venture has an inferred resource with a world-class grade, indicating very strong potential, but its inferred classification means more work is needed to increase confidence.

Positive factors

  • World-class grade (1,288 ppm U3O8) indicates very strong potential.

Negative factors

  • Inferred category indicates lower geological confidence, requiring further drilling for upgrade.

Evidence · table

“1,288”

Context: 0.42

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Metallurgical Results (2)

pilot plantMarenica Uranium Project · uraniumRecovery: 79 %Head Grade: 89Head Grade Unit: ppm UView all details
Link to this fact

Identity

Project
Marenica Uranium Project
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
EL8

Test Work

Program Status
detailed
Test Type
pilot plant
Processing Route
U-pgrade™ beneficiation process (Stages 1-4)
Sample
Marenica ore

Recovery

Recovery
79 %
Recovery Basis
actual_test
Head Grade
89
Head Grade Unit
ppm U
Conc. Grade
590
Conc. Grade Unit
ppm U
Mass Pull
12 %

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The U-pgrade™ pilot plant successfully demonstrated high mass rejection and uranium recovery in its first four stages, significantly upgrading the ore and enabling a more efficient acid leach route, which is a major de-risking step for the project.

Positive factors

  • High mass rejection (88%) significantly reduces material to be processed downstream.
  • High uranium recovery (79%) for the initial stages.
  • Significant grade increase (from 89 ppm U to 590 ppm U) before final flotation.
  • Pilot plant scale demonstrates scalability and continuous operation, de-risking the process.
  • Enables a simpler and lower-cost acid leach route by removing carbonate.

Evidence · text

“The first four stages have demonstrated 88% mass rejection and recovered 79% of the uranium into the Stage 5 feed. Stages 1 to 4 increased the grade the Marenica samples from 105 ppm to 695 ppm U₃O₈ (89 ppm to 590 ppm U).”

Tags used in scoring

Pilot Scale Completepositive

Pilot or demonstration plant testing completed under continuous operation.

Why it applies: test_type names pilot-scale work

pilot plantMarenica Uranium Project · uraniumView all details
Link to this fact

Identity

Project
Marenica Uranium Project
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
EL8

Test Work

Program Status
detailed
Test Type
pilot plant
Processing Route
U-pgrade™ beneficiation process (Stage 5)
Sample
Marenica ore

Recovery

Recovery Basis
theoretical
Conc. Grade
5000
Conc. Grade Unit
ppm U3O8

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-15T00:00:00.000Z

Reasoning: The target concentrate grade for the final flotation stage is high, but it is based on historical bench-scale test work, and pilot-scale results are still pending, which introduces some uncertainty regarding the final process performance.

Positive factors

  • High target concentrate grade (5,000 ppm U3O8) indicates significant potential for further upgrading.

Negative factors

  • This is a historical bench-scale result, and pilot-scale performance for Stage 5 is still being established.
  • Results for the final stage are pending, introducing some uncertainty.

Evidence · text

“Historical bench-scale test work previously reported by the Company demonstrated a concentrate grade of approximately 5,000 ppm U₃O₈ (equivalent to 4,240 ppm U) from samples of Marenica ore.”

Tags used in scoring

Pilot Scale Completepositive

Pilot or demonstration plant testing completed under continuous operation.

Why it applies: test_type names pilot-scale work

Theoretical Recovery Onlynegative

Only theoretical or liberation-derived recovery reported, with no actual test result.

Why it applies: recovery_basis is theoretical

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.