DVP: Annual Report to shareholders

Original announcement by asx on

Company
Develop Global Limited
Ticker
DVP
Exchange
ASX
Region
Unavailable
Primary commodity
Unavailable
Secondary commodities
None reported
Document categories
Resource update, Other
Extracted
2026-09-29 16:55:38 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Develop Global Limited's 2026 Annual Report details a year of significant growth, with the Woodlawn copper-zinc project achieving steady-state production and record performance. Final Investment Decisions were made for the Yitirrti copper-silver-zinc and Pioneer Dome lithium projects, backed by a US$400 million Trafigura financing and offtake agreement. The company reports updated Mineral Resources and Ore Reserves for these key projects, all compliant with JORC 2012, positioning it for substantial future production and cash flow.

Reasoning: The annual report details a strong year of operational and development progress, with key projects advancing to production or FID, supported by significant financing and updated resource/reserve estimates.

Positive factors

  • Significant growth in operations and project development
  • Woodlawn project achieved steady-state production and record performance
  • Final Investment Decisions made for Yitirrti and Pioneer Dome projects
  • Secured US$400m financing package with Trafigura
  • Updated Mineral Resources and Ore Reserves for key projects
  • All estimates are JORC 2012 compliant

Negative factors

  • No specific Qualified Person named for some resource estimates in the Competent Person Statement

Rubric flags

  • Inferred units for Ta2O5 and Fe2O3 — Units for Ta2O5 and Fe2O3 were not explicitly stated in the table headers for Pioneer Dome and were inferred based on common reporting practices. Ta2O5 assumed ppm, Fe2O3 assumed %.

Facts used in scoring: 66

Classification and evidence

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: All Mineral Resources and Ore Reserves estimates are reported in accordance with the guidelines of the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code).

Evidence · text

“The Mineral Resources Estimates are reported in accordance with the guidelines of the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code).”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Competent Persons are named for Pioneer Dome Resources (Mr Matthew Watson), Woodlawn Ore Reserves (Mr Tristan Sommerford), and Yitirrti Ore Reserves (Mr Matthew Keenan), and the general JORC compliance implies QP sign-off for other resource estimates.

Evidence · text

“The information contained in this announcement relating to the Pioneer Dome Resources is based on information compiled or reviewed by Mr Matthew Watson... The information contained in this announcement relating to the Woodlawn Ore Reserves is based on information compiled or reviewed by Mr Tristan Sommerford... The information contained in this announcement relating to the Yitirrti Ore Reserves is based on information compiled or reviewed by Mr Matthew Keenan”

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The cut-off grades for Mineral Resources and Ore Reserves are reported using a block value field (Net Smelter Return (NSR) $/t) based on forecast operating costs.

Evidence · text

“The Mineral Resources and Ore Reserves are reported using a block value field (Net Smelter Return (NSR) $/t) after consideration of the contained metal, payability, concentrate transport cost, and state government, traditional owner and third-party royalties. Cut-off grades are calculated as a dollar per ore tonne, based on the forecast operating costs in the financial model.”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: All projects (Woodlawn, Yitirrti, Pioneer Dome) include a significant portion of resources in the Inferred category, which is a speculative category with limited drilling.

Evidence · table

“Inferred”

Context: 3.1

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document presents updated Mineral Resources and Ore Reserves as part of the annual report, indicating a revision of existing estimates.

Evidence · text

“Mineral Resources and Ore Reserves Statement”

Extracted facts

Stored fact records: 66. Some facts used in scoring do not have a stored record.

Resource Estimates (66)

measuredWoodlawn · copperTonnes: 1300000Grade: 2.1Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
copper
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:96c9e25c0e0a78b763d1

Resource Data

Category
measured
Tonnes
1300000
Grade
2.1
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Measured resource estimate for the Woodlawn project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date
  • High confidence Measured category

Evidence · table

“2.1”

Context: 1.3

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

measuredWoodlawn · leadTonnes: 1300000Grade: 1.9Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:96c9e25c0e0a78b763d1

Resource Data

Category
measured
Tonnes
1300000
Grade
1.9
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Measured resource estimate for the Woodlawn project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date
  • High confidence Measured category

Evidence · table

“1.9”

Context: 1.3

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

measuredWoodlawn · zincTonnes: 1300000Grade: 4.3Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:96c9e25c0e0a78b763d1

Resource Data

Category
measured
Tonnes
1300000
Grade
4.3
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Measured resource estimate for the Woodlawn project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date
  • High confidence Measured category

Evidence · table

“4.3”

Context: 1.3

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

measuredWoodlawn · silverTonnes: 1300000Grade: 100Grade Unit: g/tView all details
Link to this fact

Identity

Project
Woodlawn
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:96c9e25c0e0a78b763d1

Resource Data

Category
measured
Tonnes
1300000
Grade
100
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Measured resource estimate for the Woodlawn project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date
  • High confidence Measured category

Evidence · table

“100”

Context: 1.3

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

measuredWoodlawn · goldTonnes: 1300000Grade: 1.4Grade Unit: g/tView all details
Link to this fact

Identity

Project
Woodlawn
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:96c9e25c0e0a78b763d1

Resource Data

Category
measured
Tonnes
1300000
Grade
1.4
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Measured resource estimate for the Woodlawn project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date
  • High confidence Measured category

Evidence · table

“1.4”

Context: 1.3

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedWoodlawn · copperTonnes: 6800000Grade: 1.8Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
copper
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:71de92e62d5ad28b78b3

Resource Data

Category
indicated
Tonnes
6800000
Grade
1.8
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Woodlawn project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“1.8”

Context: 6.8

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedWoodlawn · leadTonnes: 6800000Grade: 1.7Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:71de92e62d5ad28b78b3

Resource Data

Category
indicated
Tonnes
6800000
Grade
1.7
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Woodlawn project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“1.7”

Context: 6.8

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedWoodlawn · zincTonnes: 6800000Grade: 4.7Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:71de92e62d5ad28b78b3

Resource Data

Category
indicated
Tonnes
6800000
Grade
4.7
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Woodlawn project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“4.7”

Context: 6.8

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedWoodlawn · silverTonnes: 6800000Grade: 34.6Grade Unit: g/tView all details
Link to this fact

Identity

Project
Woodlawn
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:71de92e62d5ad28b78b3

Resource Data

Category
indicated
Tonnes
6800000
Grade
34.6
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Woodlawn project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“34.6”

Context: 6.8

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedWoodlawn · goldTonnes: 6800000Grade: 0.4Grade Unit: g/tView all details
Link to this fact

Identity

Project
Woodlawn
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:71de92e62d5ad28b78b3

Resource Data

Category
indicated
Tonnes
6800000
Grade
0.4
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Woodlawn project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“0.4”

Context: 6.8

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredWoodlawn · copperTonnes: 3100000Grade: 1.6Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
copper
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:ad28e2e199a8a135386d

Resource Data

Category
inferred
Tonnes
3100000
Grade
1.6
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Woodlawn project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“1.6”

Context: 3.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredWoodlawn · leadTonnes: 3100000Grade: 3.3Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:ad28e2e199a8a135386d

Resource Data

Category
inferred
Tonnes
3100000
Grade
3.3
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Woodlawn project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“3.3”

Context: 3.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredWoodlawn · zincTonnes: 3100000Grade: 8.5Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:ad28e2e199a8a135386d

Resource Data

Category
inferred
Tonnes
3100000
Grade
8.5
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Woodlawn project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“8.5”

Context: 3.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredWoodlawn · silverTonnes: 3100000Grade: 70Grade Unit: g/tView all details
Link to this fact

Identity

Project
Woodlawn
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:ad28e2e199a8a135386d

Resource Data

Category
inferred
Tonnes
3100000
Grade
70
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Woodlawn project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“70”

Context: 3.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredWoodlawn · goldTonnes: 3100000Grade: 0.5Grade Unit: g/tView all details
Link to this fact

Identity

Project
Woodlawn
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:ad28e2e199a8a135386d

Resource Data

Category
inferred
Tonnes
3100000
Grade
0.5
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Woodlawn project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“0.5”

Context: 3.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedYitirrti · copperTonnes: 12400000Grade: 1.2Grade Unit: %View all details
Link to this fact

Identity

Project
Yitirrti
Commodity
copper
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:ceb76f0dbad51e2f3ab7

Resource Data

Category
indicated
Tonnes
12400000
Grade
1.2
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Yitirrti project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“1.2”

Context: 12.4

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedYitirrti · leadTonnes: 12400000Grade: 0.3Grade Unit: %View all details
Link to this fact

Identity

Project
Yitirrti
Commodity
lead
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:ceb76f0dbad51e2f3ab7

Resource Data

Category
indicated
Tonnes
12400000
Grade
0.3
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Yitirrti project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“0.3”

Context: 12.4

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedYitirrti · zincTonnes: 12400000Grade: 5.6Grade Unit: %View all details
Link to this fact

Identity

Project
Yitirrti
Commodity
zinc
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:ceb76f0dbad51e2f3ab7

Resource Data

Category
indicated
Tonnes
12400000
Grade
5.6
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Yitirrti project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“5.6”

Context: 12.4

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedYitirrti · silverTonnes: 12400000Grade: 21.8Grade Unit: g/tView all details
Link to this fact

Identity

Project
Yitirrti
Commodity
silver
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:ceb76f0dbad51e2f3ab7

Resource Data

Category
indicated
Tonnes
12400000
Grade
21.8
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Yitirrti project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“21.8”

Context: 12.4

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedYitirrti · goldTonnes: 12400000Grade: 0.1Grade Unit: g/tView all details
Link to this fact

Identity

Project
Yitirrti
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:ceb76f0dbad51e2f3ab7

Resource Data

Category
indicated
Tonnes
12400000
Grade
0.1
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Yitirrti project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“0.1”

Context: 12.4

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredYitirrti · copperTonnes: 1400000Grade: 0.2Grade Unit: %View all details
Link to this fact

Identity

Project
Yitirrti
Commodity
copper
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:c11487d7351ed16e8eaa

Resource Data

Category
inferred
Tonnes
1400000
Grade
0.2
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Yitirrti project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“0.2”

Context: 1.4

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredYitirrti · leadTonnes: 1400000Grade: 0.5Grade Unit: %View all details
Link to this fact

Identity

Project
Yitirrti
Commodity
lead
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:c11487d7351ed16e8eaa

Resource Data

Category
inferred
Tonnes
1400000
Grade
0.5
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Yitirrti project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“0.5”

Context: 1.4

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredYitirrti · zincTonnes: 1400000Grade: 6.4Grade Unit: %View all details
Link to this fact

Identity

Project
Yitirrti
Commodity
zinc
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:c11487d7351ed16e8eaa

Resource Data

Category
inferred
Tonnes
1400000
Grade
6.4
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Yitirrti project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“6.4”

Context: 1.4

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredYitirrti · silverTonnes: 1400000Grade: 38.4Grade Unit: g/tView all details
Link to this fact

Identity

Project
Yitirrti
Commodity
silver
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:c11487d7351ed16e8eaa

Resource Data

Category
inferred
Tonnes
1400000
Grade
38.4
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Yitirrti project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“38.4”

Context: 1.4

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredYitirrti · goldTonnes: 1400000Grade: 0.2Grade Unit: g/tView all details
Link to this fact

Identity

Project
Yitirrti
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:c11487d7351ed16e8eaa

Resource Data

Category
inferred
Tonnes
1400000
Grade
0.2
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Yitirrti project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“0.2”

Context: 1.4

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedYitirrti (Kangaroo Caves) · copperTonnes: 2300000Grade: 0.9Grade Unit: %View all details
Link to this fact

Identity

Project
Yitirrti (Kangaroo Caves)
Commodity
copper
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:6c956c863e2a478464aa

Resource Data

Category
indicated
Tonnes
2300000
Grade
0.9
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Kangaroo Caves deposit within the Yitirrti project.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“0.9”

Context: 2.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedYitirrti (Kangaroo Caves) · leadTonnes: 2300000Grade: 0.3Grade Unit: %View all details
Link to this fact

Identity

Project
Yitirrti (Kangaroo Caves)
Commodity
lead
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:6c956c863e2a478464aa

Resource Data

Category
indicated
Tonnes
2300000
Grade
0.3
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Kangaroo Caves deposit within the Yitirrti project.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“0.3”

Context: 2.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedYitirrti (Kangaroo Caves) · zincTonnes: 2300000Grade: 5.7Grade Unit: %View all details
Link to this fact

Identity

Project
Yitirrti (Kangaroo Caves)
Commodity
zinc
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:6c956c863e2a478464aa

Resource Data

Category
indicated
Tonnes
2300000
Grade
5.7
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Kangaroo Caves deposit within the Yitirrti project.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“5.7”

Context: 2.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedYitirrti (Kangaroo Caves) · silverTonnes: 2300000Grade: 13.6Grade Unit: g/tView all details
Link to this fact

Identity

Project
Yitirrti (Kangaroo Caves)
Commodity
silver
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:6c956c863e2a478464aa

Resource Data

Category
indicated
Tonnes
2300000
Grade
13.6
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Kangaroo Caves deposit within the Yitirrti project.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“13.6”

Context: 2.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedYitirrti (Kangaroo Caves) · goldTonnes: 2300000Grade: 0Grade Unit: g/tView all details
Link to this fact

Identity

Project
Yitirrti (Kangaroo Caves)
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:6c956c863e2a478464aa

Resource Data

Category
indicated
Tonnes
2300000
Grade
0
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Kangaroo Caves deposit within the Yitirrti project.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“0.0”

Context: 2.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredYitirrti (Kangaroo Caves) · copperTonnes: 1300000Grade: 0.5Grade Unit: %View all details
Link to this fact

Identity

Project
Yitirrti (Kangaroo Caves)
Commodity
copper
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:9776b6125d3008d4a8b2

Resource Data

Category
inferred
Tonnes
1300000
Grade
0.5
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Kangaroo Caves deposit within the Yitirrti project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“0.5”

Context: 1.3

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredYitirrti (Kangaroo Caves) · leadTonnes: 1300000Grade: 0.4Grade Unit: %View all details
Link to this fact

Identity

Project
Yitirrti (Kangaroo Caves)
Commodity
lead
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:9776b6125d3008d4a8b2

Resource Data

Category
inferred
Tonnes
1300000
Grade
0.4
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Kangaroo Caves deposit within the Yitirrti project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“0.4”

Context: 1.3

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredYitirrti (Kangaroo Caves) · zincTonnes: 1300000Grade: 6.5Grade Unit: %View all details
Link to this fact

Identity

Project
Yitirrti (Kangaroo Caves)
Commodity
zinc
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:9776b6125d3008d4a8b2

Resource Data

Category
inferred
Tonnes
1300000
Grade
6.5
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Kangaroo Caves deposit within the Yitirrti project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“6.5”

Context: 1.3

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredYitirrti (Kangaroo Caves) · silverTonnes: 1300000Grade: 18Grade Unit: g/tView all details
Link to this fact

Identity

Project
Yitirrti (Kangaroo Caves)
Commodity
silver
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:9776b6125d3008d4a8b2

Resource Data

Category
inferred
Tonnes
1300000
Grade
18
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Kangaroo Caves deposit within the Yitirrti project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“18.0”

Context: 1.3

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredYitirrti (Kangaroo Caves) · goldTonnes: 1300000Grade: 0Grade Unit: g/tView all details
Link to this fact

Identity

Project
Yitirrti (Kangaroo Caves)
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:9776b6125d3008d4a8b2

Resource Data

Category
inferred
Tonnes
1300000
Grade
0
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Kangaroo Caves deposit within the Yitirrti project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“0.0”

Context: 1.3

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedWoodlawn · copperTonnes: 21500000Grade: 1.4Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
copper
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:77cb594142e854a1a967

Resource Data

Category
indicated
Tonnes
21500000
Grade
1.4
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Woodlawn project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“1.4”

Context: 21.5

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedWoodlawn · leadTonnes: 21500000Grade: 0.8Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:77cb594142e854a1a967

Resource Data

Category
indicated
Tonnes
21500000
Grade
0.8
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Woodlawn project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“0.8”

Context: 21.5

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedWoodlawn · zincTonnes: 21500000Grade: 5.3Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:77cb594142e854a1a967

Resource Data

Category
indicated
Tonnes
21500000
Grade
5.3
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Woodlawn project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“5.3”

Context: 21.5

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedWoodlawn · silverTonnes: 21500000Grade: 25.8Grade Unit: g/tView all details
Link to this fact

Identity

Project
Woodlawn
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:77cb594142e854a1a967

Resource Data

Category
indicated
Tonnes
21500000
Grade
25.8
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Woodlawn project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“25.8”

Context: 21.5

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedWoodlawn · goldTonnes: 21500000Grade: 0.2Grade Unit: g/tView all details
Link to this fact

Identity

Project
Woodlawn
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:77cb594142e854a1a967

Resource Data

Category
indicated
Tonnes
21500000
Grade
0.2
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Woodlawn project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Evidence · table

“0.2”

Context: 21.5

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredWoodlawn · copperTonnes: 5800000Grade: 0.8Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
copper
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:e999839ef332e2e8035a

Resource Data

Category
inferred
Tonnes
5800000
Grade
0.8
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Woodlawn project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“0.8”

Context: 5.8

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredWoodlawn · leadTonnes: 5800000Grade: 1.6Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:e999839ef332e2e8035a

Resource Data

Category
inferred
Tonnes
5800000
Grade
1.6
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Woodlawn project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“1.6”

Context: 5.8

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredWoodlawn · zincTonnes: 5800000Grade: 7.2Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:e999839ef332e2e8035a

Resource Data

Category
inferred
Tonnes
5800000
Grade
7.2
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Woodlawn project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“7.2”

Context: 5.8

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredWoodlawn · silverTonnes: 5800000Grade: 48.3Grade Unit: g/tView all details
Link to this fact

Identity

Project
Woodlawn
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:e999839ef332e2e8035a

Resource Data

Category
inferred
Tonnes
5800000
Grade
48.3
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Woodlawn project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“48.3”

Context: 5.8

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredWoodlawn · goldTonnes: 5800000Grade: 0.3Grade Unit: g/tView all details
Link to this fact

Identity

Project
Woodlawn
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:e999839ef332e2e8035a

Resource Data

Category
inferred
Tonnes
5800000
Grade
0.3
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Woodlawn project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date

Negative factors

  • Inferred category

Evidence · table

“0.3”

Context: 5.8

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedPioneer Dome · lithiumTonnes: 8600000Grade: 1.23Grade Unit: % Li2OContained Metal: 105000Contained Unit: tView all details
Link to this fact

Identity

Project
Pioneer Dome
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Matthew Watson
Resource group id
resource:8061234b1a7d7349929e

Resource Data

Category
indicated
Tonnes
8600000
Grade
1.23
Grade Unit
% Li2O
Contained Metal
105000
Contained Unit
t
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Pioneer Dome project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date
  • QP signed

Evidence · table

“1.23”

Context: 8.6

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedPioneer Dome · tantalumTonnes: 8600000Grade: 55Grade Unit: ppmView all details
Link to this fact

Identity

Project
Pioneer Dome
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Matthew Watson
Resource group id
resource:8061234b1a7d7349929e

Resource Data

Category
indicated
Tonnes
8600000
Grade
55
Grade Unit
ppm
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Pioneer Dome project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date
  • QP signed

Evidence · table

“55”

Context: 8.6

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedPioneer Dome · iron_oreTonnes: 8600000Grade: 0.46Grade Unit: %View all details
Link to this fact

Identity

Project
Pioneer Dome
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Matthew Watson
Resource group id
resource:8061234b1a7d7349929e

Resource Data

Category
indicated
Tonnes
8600000
Grade
0.46
Grade Unit
%
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Indicated resource estimate for the Pioneer Dome project, contributing to the overall project value.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date
  • QP signed

Evidence · table

“0.46”

Context: 8.6

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredPioneer Dome · lithiumTonnes: 2600000Grade: 0.92Grade Unit: % Li2OContained Metal: 24000Contained Unit: tView all details
Link to this fact

Identity

Project
Pioneer Dome
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Matthew Watson
Resource group id
resource:8b3db5aa326cc62a8f28

Resource Data

Category
inferred
Tonnes
2600000
Grade
0.92
Grade Unit
% Li2O
Contained Metal
24000
Contained Unit
t
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Pioneer Dome project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date
  • QP signed

Negative factors

  • Inferred category

Evidence · table

“0.92”

Context: 2.6

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredPioneer Dome · tantalumTonnes: 2600000Grade: 62Grade Unit: ppmView all details
Link to this fact

Identity

Project
Pioneer Dome
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Matthew Watson
Resource group id
resource:8b3db5aa326cc62a8f28

Resource Data

Category
inferred
Tonnes
2600000
Grade
62
Grade Unit
ppm
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Pioneer Dome project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date
  • QP signed

Negative factors

  • Inferred category

Evidence · table

“62”

Context: 2.6

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredPioneer Dome · iron_oreTonnes: 2600000Grade: 0.55Grade Unit: %View all details
Link to this fact

Identity

Project
Pioneer Dome
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Matthew Watson
Resource group id
resource:8b3db5aa326cc62a8f28

Resource Data

Category
inferred
Tonnes
2600000
Grade
0.55
Grade Unit
%
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Inferred resource estimate for the Pioneer Dome project, which is a lower confidence category.

Positive factors

  • JORC compliant
  • Defined resource
  • Current effective date
  • QP signed

Negative factors

  • Inferred category

Evidence · table

“0.55”

Context: 2.6

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

provenWoodlawn · copperTonnes: 1200000Grade: 1.7Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
copper
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Tristan Sommerford
Resource group id
resource:de7a243505a1a0458356

Resource Data

Category
proven
Tonnes
1200000
Grade
1.7
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Proved Ore Reserve estimate for the Woodlawn project, representing high confidence economic viability.

Positive factors

  • JORC compliant
  • Defined reserve
  • Current effective date
  • QP signed
  • Highest confidence Proved category

Evidence · table

“1.7”

Context: 1.2

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

provenWoodlawn · leadTonnes: 1200000Grade: 1.4Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Tristan Sommerford
Resource group id
resource:de7a243505a1a0458356

Resource Data

Category
proven
Tonnes
1200000
Grade
1.4
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Proved Ore Reserve estimate for the Woodlawn project, representing high confidence economic viability.

Positive factors

  • JORC compliant
  • Defined reserve
  • Current effective date
  • QP signed
  • Highest confidence Proved category

Evidence · table

“1.4”

Context: 1.2

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

provenWoodlawn · zincTonnes: 1200000Grade: 4.5Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Tristan Sommerford
Resource group id
resource:de7a243505a1a0458356

Resource Data

Category
proven
Tonnes
1200000
Grade
4.5
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Proved Ore Reserve estimate for the Woodlawn project, representing high confidence economic viability.

Positive factors

  • JORC compliant
  • Defined reserve
  • Current effective date
  • QP signed
  • Highest confidence Proved category

Evidence · table

“4.5”

Context: 1.2

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

provenWoodlawn · silverTonnes: 1200000Grade: 37.1Grade Unit: g/tView all details
Link to this fact

Identity

Project
Woodlawn
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Tristan Sommerford
Resource group id
resource:de7a243505a1a0458356

Resource Data

Category
proven
Tonnes
1200000
Grade
37.1
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Proved Ore Reserve estimate for the Woodlawn project, representing high confidence economic viability.

Positive factors

  • JORC compliant
  • Defined reserve
  • Current effective date
  • QP signed
  • Highest confidence Proved category

Evidence · table

“37.1”

Context: 1.2

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

provenWoodlawn · goldTonnes: 1200000Grade: 0.7Grade Unit: g/tView all details
Link to this fact

Identity

Project
Woodlawn
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Tristan Sommerford
Resource group id
resource:de7a243505a1a0458356

Resource Data

Category
proven
Tonnes
1200000
Grade
0.7
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Proved Ore Reserve estimate for the Woodlawn project, representing high confidence economic viability.

Positive factors

  • JORC compliant
  • Defined reserve
  • Current effective date
  • QP signed
  • Highest confidence Proved category

Evidence · table

“0.7”

Context: 1.2

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableWoodlawn · copperTonnes: 4800000Grade: 1.4Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
copper
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Tristan Sommerford
Resource group id
resource:abfeb14142701fe7a91f

Resource Data

Category
probable
Tonnes
4800000
Grade
1.4
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Probable Ore Reserve estimate for the Woodlawn project, representing economic viability.

Positive factors

  • JORC compliant
  • Defined reserve
  • Current effective date
  • QP signed

Evidence · table

“1.4”

Context: 4.8

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableWoodlawn · leadTonnes: 4800000Grade: 1.3Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Tristan Sommerford
Resource group id
resource:abfeb14142701fe7a91f

Resource Data

Category
probable
Tonnes
4800000
Grade
1.3
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Probable Ore Reserve estimate for the Woodlawn project, representing economic viability.

Positive factors

  • JORC compliant
  • Defined reserve
  • Current effective date
  • QP signed

Evidence · table

“1.3”

Context: 4.8

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableWoodlawn · zincTonnes: 4800000Grade: 3.4Grade Unit: %View all details
Link to this fact

Identity

Project
Woodlawn
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Tristan Sommerford
Resource group id
resource:abfeb14142701fe7a91f

Resource Data

Category
probable
Tonnes
4800000
Grade
3.4
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Probable Ore Reserve estimate for the Woodlawn project, representing economic viability.

Positive factors

  • JORC compliant
  • Defined reserve
  • Current effective date
  • QP signed

Evidence · table

“3.4”

Context: 4.8

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableWoodlawn · silverTonnes: 4800000Grade: 27Grade Unit: g/tView all details
Link to this fact

Identity

Project
Woodlawn
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Tristan Sommerford
Resource group id
resource:abfeb14142701fe7a91f

Resource Data

Category
probable
Tonnes
4800000
Grade
27
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Probable Ore Reserve estimate for the Woodlawn project, representing economic viability.

Positive factors

  • JORC compliant
  • Defined reserve
  • Current effective date
  • QP signed

Evidence · table

“27”

Context: 4.8

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableWoodlawn · goldTonnes: 4800000Grade: 0.4Grade Unit: g/tView all details
Link to this fact

Identity

Project
Woodlawn
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
DVP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Tristan Sommerford
Resource group id
resource:abfeb14142701fe7a91f

Resource Data

Category
probable
Tonnes
4800000
Grade
0.4
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Probable Ore Reserve estimate for the Woodlawn project, representing economic viability.

Positive factors

  • JORC compliant
  • Defined reserve
  • Current effective date
  • QP signed

Evidence · table

“0.4”

Context: 4.8

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableYitirrti · copperTonnes: 8800000Grade: 1.1Grade Unit: %View all details
Link to this fact

Identity

Project
Yitirrti
Commodity
copper
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Matthew Keenan
Resource group id
resource:c493c3a6b9bb21a5174c

Resource Data

Category
probable
Tonnes
8800000
Grade
1.1
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Probable Ore Reserve estimate for the Yitirrti project, representing economic viability.

Positive factors

  • JORC compliant
  • Defined reserve
  • Current effective date
  • QP signed

Evidence · table

“1.1”

Context: 8.8

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableYitirrti · leadTonnes: 8800000Grade: 0.2Grade Unit: %View all details
Link to this fact

Identity

Project
Yitirrti
Commodity
lead
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Matthew Keenan
Resource group id
resource:c493c3a6b9bb21a5174c

Resource Data

Category
probable
Tonnes
8800000
Grade
0.2
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Probable Ore Reserve estimate for the Yitirrti project, representing economic viability.

Positive factors

  • JORC compliant
  • Defined reserve
  • Current effective date
  • QP signed

Evidence · table

“0.2”

Context: 8.8

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableYitirrti · zincTonnes: 8800000Grade: 5.4Grade Unit: %View all details
Link to this fact

Identity

Project
Yitirrti
Commodity
zinc
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Matthew Keenan
Resource group id
resource:c493c3a6b9bb21a5174c

Resource Data

Category
probable
Tonnes
8800000
Grade
5.4
Grade Unit
%
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Probable Ore Reserve estimate for the Yitirrti project, representing economic viability.

Positive factors

  • JORC compliant
  • Defined reserve
  • Current effective date
  • QP signed

Evidence · table

“5.4”

Context: 8.8

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableYitirrti · silverTonnes: 8800000Grade: 20.6Grade Unit: g/tView all details
Link to this fact

Identity

Project
Yitirrti
Commodity
silver
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Matthew Keenan
Resource group id
resource:c493c3a6b9bb21a5174c

Resource Data

Category
probable
Tonnes
8800000
Grade
20.6
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Probable Ore Reserve estimate for the Yitirrti project, representing economic viability.

Positive factors

  • JORC compliant
  • Defined reserve
  • Current effective date
  • QP signed

Evidence · table

“20.6”

Context: 8.8

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableYitirrti · goldTonnes: 8800000Grade: 0.1Grade Unit: g/tView all details
Link to this fact

Identity

Project
Yitirrti
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
DVP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Matthew Keenan
Resource group id
resource:c493c3a6b9bb21a5174c

Resource Data

Category
probable
Tonnes
8800000
Grade
0.1
Grade Unit
g/t
Cutoff Unit
NSR $/t

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-28T00:00:00.000Z

Reasoning: This is a JORC 2012 compliant Probable Ore Reserve estimate for the Yitirrti project, representing economic viability.

Positive factors

  • JORC compliant
  • Defined reserve
  • Current effective date
  • QP signed

Evidence · table

“0.1”

Context: 8.8

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.