CXO: Core Lithium 2026 Annual Report to Shareholders
Original announcement by asx on
- Company
- Core Lithium Ltd
- Ticker
- CXO
- Exchange
- ASX
- Region
- Northern Territory
- Primary commodity
- Lithium
- Secondary commodities
- None reported
- Document categories
- Resource update, Drill results, Agreement transaction
- Extracted
- 2026-09-24 00:16:39 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Core Lithium successfully restarted its Finniss Lithium Operation in FY26, securing a fully funded restart package and commencing mining at Grants and underground development at BP33. The company is on track for its first spodumene concentrate shipment in December CY26, supported by updated Ore Reserve estimates showing a 3% increase in total Finniss Ore Reserves to 15.6Mt @ 1.27% Li2O. Exploration efforts continue, yielding high-grade drill results at BP33 and advancing the Blackbeard prospect towards a maiden Mineral Resource Estimate.
Reasoning: Core Lithium successfully restarted its Finniss Lithium Operation, securing significant funding and commencing mining activities. The report highlights strong drill results extending mineralization at BP33 and an increase in Ore Reserves, positioning the company for production despite ongoing market volatility.
Positive factors
- Successful restart of Finniss Lithium Operation
- Fully funded restart package secured
- Commencement of mining at Grants and underground development at BP33
- First spodumene concentrate shipment targeted for December CY26
- High-grade lithium drill results at BP33 extending mineralization
- Increase in Grants Ore Reserve and total Finniss Ore Reserves
- Strategic partnerships and marketing agreement with Glencore
- Strong cash balance of A$182 million
Negative factors
- Lithium market near-term volatility
- Significant portion of total Mineral Resource remains Inferred
- No new drilling for Mineral Resources since September 2025
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 73
Classification and evidence
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: The drill intercept of 34.08m @ 2.09% Li2O is an exceptionally high-grade zone for lithium, well above the deposit-type norm.
Evidence · text
“34.08m @ 2.09% Li2O”
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: The release states that Core relies on drilling results from accredited laboratories and conducts all data collection activities to industry standards based on quality assurance and quality control protocols.
Evidence · text
“Core relies on drilling results from accredited laboratories in providing assay data used for Exploration to estimate Mineral Resources and Ore Reserves. All data collection activities are conducted to industry standards based on a framework of quality assurance and quality control protocols covering all aspects of sample collection, topographical and geophysical surveys, drilling, sample preparation, physical and chemical analysis and data and sample management.”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: The Mineral Resource estimate is based on information compiled by Mr Jeremy Clark, a member of the Australian Institute of Geoscientists and a Competent Person as defined by JORC Code. The Ore Reserve estimate is based on information compiled by Mr Ben Darkwa, a Member of the Australasian Institute of Mining and Metallurgy and a Competent Person.
Evidence · text
“The information in this report that relates to the estimation and reporting of Mineral Resources at Finniss is based on, and fairly represents information compiled by Mr Jeremy Clark. Mr Clark is Managing Director of Lily Valley International and acts as a consultant to Core. Mr Clark is a member of the Australian Institute of Geoscientists. He has sufficient experience with the style of mineralisation, deposit type under consideration and the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (The JORC Code).”
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: The Mineral Resource and Ore Reserve estimates are stated to be in accordance with the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (The JORC Code).
Evidence · text
“The information in this report that relates to the estimation and reporting of Mineral Resources at Finniss is based on, and fairly represents information compiled by Mr Jeremy Clark. Mr Clark is Managing Director of Lily Valley International and acts as a consultant to Core. Mr Clark is a member of the Australian Institute of Geoscientists. He has sufficient experience with the style of mineralisation, deposit type under consideration and the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (The JORC Code).”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: The in situ Mineral Resource is estimated at a cut-off grade of 0.5% Li2O, and Ore Reserve cut-off grades are also disclosed (e.g., 0.8% for Grants Open Pit).
Evidence · text
“The in situ Mineral Resource is estimated at a cut-off grade of 0.5% Li2O.”
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The Mineral Resource Estimate is consistent with those previously reported by Core, with an effective date of 14 May 2025, which is over a year old.
Evidence · text
“Accordingly, there has been no material change to the Mineral Resource Estimate and the in situ Mineral Resources are consistent with those previously reported by Core. In situ Mineral Resources for the Finniss Lithium Operation comprise the Grants, BP33, Carlton, Hang Gong, Lees, Booths, Ah Hoy, Sandras, Penfolds, Bilatos and Seadog deposits.”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The total Finniss Mineral Resource includes a significant Inferred component of 20.3 Mt at 1.18% Li2O, which is a speculative category.
Evidence · table
“20.3”
Context: Finniss
Tonnage Growthpositive
Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
Why it applies: The Grants Ore Reserve Estimate increased by 33.0% to 1.53Mt @ 1.42% Li2O.
Evidence · text
“An updated Grants Ore Reserve Estimate was announced on 10 November 2025, increasing by 33.0% to 1.53Mt @ 1.42% with a 44% increase in contained metal to 22kt Li2O.”
Contained Metal Growthpositive
True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
Why it applies: The Grants Ore Reserve Estimate showed a 44% increase in contained metal to 22kt Li2O.
Evidence · text
“An updated Grants Ore Reserve Estimate was announced on 10 November 2025, increasing by 33.0% to 1.53Mt @ 1.42% with a 44% increase in contained metal to 22kt Li2O.”
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: The document provides an updated Ore Reserve Estimate for Grants and overall Finniss, reflecting changes from prior estimates.
Evidence · text
“An updated Grants Ore Reserve Estimate was announced on 10 November 2025, increasing by 33.0% to 1.53Mt @ 1.42% with a 44% increase in contained metal to 22kt Li2O.”
Extracted facts
Stored fact records: 70. Some facts used in scoring do not have a stored record.
Drill Results (2)
NMRD100Finniss Lithium Operation · lithiumGrade: 2.09Grade Unit: %Intercept: 34.08 mView all detailsHide details
Identity
- Hole ID
- NMRD100
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- australia_nt
- Ticker
- CXO
Geometry
- Grade
- 2.09
- Grade Unit
- %
- Intercept
- 34.08 m
- From
- 578.7 m
- To
- 612.78 m
- Intercept Depth
- 578.7 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- NMRD100:578.7-612.78
QA/QC
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The drill hole NMRD100 returned a high-grade lithium intercept of 34.08m at 2.09% Li2O, which is an exceptional grade for lithium and extends mineralization at the BP33 deposit, indicating strong potential for resource growth.
Positive factors
- Bonanza Intercept
- High-grade lithium result
- Significant intercept length
- Extends known mineralization at BP33
- QA/QC Disclosed
Evidence · text
“NMRD100, including 34.08m @ 2.09% Li2O from 578.70m”
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
NMRD100Finniss Lithium Operation · lithiumGrade: 2.44Grade Unit: %Intercept: 3.43 mView all detailsHide details
Identity
- Hole ID
- NMRD100
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- australia_nt
- Ticker
- CXO
Geometry
- Grade
- 2.44
- Grade Unit
- %
- Intercept
- 3.43 m
- From
- 616.54 m
- To
- 619.97 m
- Intercept Depth
- 616.54 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- NMRD100:616.54-619.97
QA/QC
- QA/QC Disclosed
- Yes
- Lab Certified
- Yes
- QP Signed
- Yes
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: A high-grade sub-interval of 3.43m at 2.44% Li2O within NMRD100 further confirms the strong lithium mineralization at BP33, contributing positively to exploration potential.
Positive factors
- Bonanza Intercept
- Very high-grade lithium result
- Extends known mineralization at BP33
- QA/QC Disclosed
Evidence · text
“and 3.43m @ 2.44% Li2O from 616.54m”
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Resource Estimates (68)
measuredFinniss Lithium Operation · lithiumTonnes: 1340000Grade: 1.48Grade Unit: % Li2OContained Metal: 19.8Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:d84a74827098d472eeb7
- Deposit or zone
- Grants
Resource Data
- Category
- measured
- Tonnes
- 1340000
- Grade
- 1.48
- Grade Unit
- % Li2O
- Contained Metal
- 19.8
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Grants deposit has a Measured Resource of 1.34 Mt at 1.48% Li2O, indicating high confidence in a good grade, though this is a restatement of a prior estimate.
Positive factors
- Measured Resource
- High-grade resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.48”
Context: 1.34
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
measuredFinniss Lithium Operation · lithiumTonnes: 1340000Contained Metal: 49Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:d84a74827098d472eeb7
- Deposit or zone
- Grants
Resource Data
- Category
- measured
- Tonnes
- 1340000
- Contained Metal
- 49
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Grants deposit has a Measured Resource of 49 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- Measured Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“49”
Context: 1.34
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 610000Grade: 1.49Grade Unit: % Li2OContained Metal: 9.1Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:076ea990253d787fae69
- Deposit or zone
- Grants
Resource Data
- Category
- indicated
- Tonnes
- 610000
- Grade
- 1.49
- Grade Unit
- % Li2O
- Contained Metal
- 9.1
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Grants deposit has an Indicated Resource of 0.61 Mt at 1.49% Li2O, providing reasonable geological confidence, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- High-grade resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.49”
Context: 0.61
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 610000Contained Metal: 22Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:076ea990253d787fae69
- Deposit or zone
- Grants
Resource Data
- Category
- indicated
- Tonnes
- 610000
- Contained Metal
- 22
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Grants deposit has an Indicated Resource of 22 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“22”
Context: 0.61
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 370000Grade: 1.27Grade Unit: % Li2OContained Metal: 4.7Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:72d1549a917d0f824170
- Deposit or zone
- Grants
Resource Data
- Category
- inferred
- Tonnes
- 370000
- Grade
- 1.27
- Grade Unit
- % Li2O
- Contained Metal
- 4.7
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Grants deposit includes an Inferred Resource of 0.37 Mt at 1.27% Li2O, which is a speculative category with lower confidence, and is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“1.27”
Context: 0.37
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 370000Contained Metal: 12Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:72d1549a917d0f824170
- Deposit or zone
- Grants
Resource Data
- Category
- inferred
- Tonnes
- 370000
- Contained Metal
- 12
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Grants deposit includes an Inferred Resource of 12 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“12”
Context: 0.37
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
measuredFinniss Lithium Operation · lithiumTonnes: 2850000Grade: 1.44Grade Unit: % Li2OContained Metal: 41Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:a6c81a7f4c44859fdfbd
- Deposit or zone
- BP33
Resource Data
- Category
- measured
- Tonnes
- 2850000
- Grade
- 1.44
- Grade Unit
- % Li2O
- Contained Metal
- 41
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The BP33 deposit has a Measured Resource of 2.85 Mt at 1.44% Li2O, indicating high confidence in a good grade, though this is a restatement of a prior estimate.
Positive factors
- Measured Resource
- High-grade resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.44”
Context: 2.85
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
measuredFinniss Lithium Operation · lithiumTonnes: 2850000Contained Metal: 101Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:a6c81a7f4c44859fdfbd
- Deposit or zone
- BP33
Resource Data
- Category
- measured
- Tonnes
- 2850000
- Contained Metal
- 101
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The BP33 deposit has a Measured Resource of 101 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- Measured Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“101”
Context: 2.85
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 6510000Grade: 1.55Grade Unit: % Li2OContained Metal: 101Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:23fe263040c8fe497ede
- Deposit or zone
- BP33
Resource Data
- Category
- indicated
- Tonnes
- 6510000
- Grade
- 1.55
- Grade Unit
- % Li2O
- Contained Metal
- 101
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The BP33 deposit has a significant Indicated Resource of 6.51 Mt at 1.55% Li2O, providing strong geological confidence, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- High-grade resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.55”
Context: 6.51
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 6510000Contained Metal: 249Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:23fe263040c8fe497ede
- Deposit or zone
- BP33
Resource Data
- Category
- indicated
- Tonnes
- 6510000
- Contained Metal
- 249
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The BP33 deposit has a significant Indicated Resource of 249 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“249”
Context: 6.51
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 1140000Grade: 1.59Grade Unit: % Li2OContained Metal: 18.1Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:83b80a84c996969aea2d
- Deposit or zone
- BP33
Resource Data
- Category
- inferred
- Tonnes
- 1140000
- Grade
- 1.59
- Grade Unit
- % Li2O
- Contained Metal
- 18.1
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The BP33 deposit includes an Inferred Resource of 1.14 Mt at 1.59% Li2O, which is a speculative category with lower confidence, and is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“1.59”
Context: 1.14
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 1140000Contained Metal: 45Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:83b80a84c996969aea2d
- Deposit or zone
- BP33
Resource Data
- Category
- inferred
- Tonnes
- 1140000
- Contained Metal
- 45
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The BP33 deposit includes an Inferred Resource of 45 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“45”
Context: 1.14
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
measuredFinniss Lithium Operation · lithiumTonnes: 2140000Grade: 1.33Grade Unit: % Li2OContained Metal: 28.5Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:0c324d490bbd9cd15021
- Deposit or zone
- Carlton
Resource Data
- Category
- measured
- Tonnes
- 2140000
- Grade
- 1.33
- Grade Unit
- % Li2O
- Contained Metal
- 28.5
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Carlton deposit has a Measured Resource of 2.14 Mt at 1.33% Li2O, indicating high confidence in a good grade, though this is a restatement of a prior estimate.
Positive factors
- Measured Resource
- High-grade resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.33”
Context: 2.14
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
measuredFinniss Lithium Operation · lithiumTonnes: 2140000Contained Metal: 70Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:0c324d490bbd9cd15021
- Deposit or zone
- Carlton
Resource Data
- Category
- measured
- Tonnes
- 2140000
- Contained Metal
- 70
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Carlton deposit has a Measured Resource of 70 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- Measured Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“70”
Context: 2.14
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 3430000Grade: 1.32Grade Unit: % Li2OContained Metal: 45.3Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:94270cd646c3ee35ab33
- Deposit or zone
- Carlton
Resource Data
- Category
- indicated
- Tonnes
- 3430000
- Grade
- 1.32
- Grade Unit
- % Li2O
- Contained Metal
- 45.3
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Carlton deposit has an Indicated Resource of 3.43 Mt at 1.32% Li2O, providing reasonable geological confidence, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- High-grade resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.32”
Context: 3.43
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 3430000Contained Metal: 119Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:94270cd646c3ee35ab33
- Deposit or zone
- Carlton
Resource Data
- Category
- indicated
- Tonnes
- 3430000
- Contained Metal
- 119
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Carlton deposit has an Indicated Resource of 119 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“119”
Context: 3.43
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 780000Grade: 1.14Grade Unit: % Li2OContained Metal: 8.9Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:6a513cc5da5278ace86c
- Deposit or zone
- Carlton
Resource Data
- Category
- inferred
- Tonnes
- 780000
- Grade
- 1.14
- Grade Unit
- % Li2O
- Contained Metal
- 8.9
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Carlton deposit includes an Inferred Resource of 0.78 Mt at 1.14% Li2O, which is a speculative category with lower confidence, and is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“1.14”
Context: 0.78
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 780000Contained Metal: 22Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:6a513cc5da5278ace86c
- Deposit or zone
- Carlton
Resource Data
- Category
- inferred
- Tonnes
- 780000
- Contained Metal
- 22
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Carlton deposit includes an Inferred Resource of 22 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“22”
Context: 0.78
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 1510000Grade: 1.18Grade Unit: % Li2OContained Metal: 17.8Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:8580f57ac477778c37ac
- Deposit or zone
- Hang Gong
Resource Data
- Category
- indicated
- Tonnes
- 1510000
- Grade
- 1.18
- Grade Unit
- % Li2O
- Contained Metal
- 17.8
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Hang Gong deposit has an Indicated Resource of 1.51 Mt at 1.18% Li2O, providing reasonable geological confidence, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.18”
Context: 1.51
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 1510000Contained Metal: 44Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:8580f57ac477778c37ac
- Deposit or zone
- Hang Gong
Resource Data
- Category
- indicated
- Tonnes
- 1510000
- Contained Metal
- 44
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Hang Gong deposit has an Indicated Resource of 44 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“44”
Context: 1.51
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 1950000Grade: 1.14Grade Unit: % Li2OContained Metal: 22.2Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:d7d9365eaa7308bf9954
- Deposit or zone
- Hang Gong
Resource Data
- Category
- inferred
- Tonnes
- 1950000
- Grade
- 1.14
- Grade Unit
- % Li2O
- Contained Metal
- 22.2
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Hang Gong deposit includes an Inferred Resource of 1.95 Mt at 1.14% Li2O, which is a speculative category with lower confidence, and is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“1.14”
Context: 1.95
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 1950000Contained Metal: 55Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:d7d9365eaa7308bf9954
- Deposit or zone
- Hang Gong
Resource Data
- Category
- inferred
- Tonnes
- 1950000
- Contained Metal
- 55
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Hang Gong deposit includes an Inferred Resource of 55 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“55”
Context: 1.95
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 4160000Grade: 1.18Grade Unit: % Li2OContained Metal: 49.1Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:82bb96199b41a0cbfb24
- Deposit or zone
- Lees
Resource Data
- Category
- indicated
- Tonnes
- 4160000
- Grade
- 1.18
- Grade Unit
- % Li2O
- Contained Metal
- 49.1
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Lees deposit has an Indicated Resource of 4.16 Mt at 1.18% Li2O, providing reasonable geological confidence, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.18”
Context: 4.16
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 4160000Contained Metal: 121Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:82bb96199b41a0cbfb24
- Deposit or zone
- Lees
Resource Data
- Category
- indicated
- Tonnes
- 4160000
- Contained Metal
- 121
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Lees deposit has an Indicated Resource of 121 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“121”
Context: 4.16
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 7080000Grade: 1.12Grade Unit: % Li2OContained Metal: 79.3Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:bdad71c14d96a2b80fa2
- Deposit or zone
- Lees
Resource Data
- Category
- inferred
- Tonnes
- 7080000
- Grade
- 1.12
- Grade Unit
- % Li2O
- Contained Metal
- 79.3
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Lees deposit includes an Inferred Resource of 7.08 Mt at 1.12% Li2O, which is a speculative category with lower confidence, and is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“1.12”
Context: 7.08
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 7080000Contained Metal: 196Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:bdad71c14d96a2b80fa2
- Deposit or zone
- Lees
Resource Data
- Category
- inferred
- Tonnes
- 7080000
- Contained Metal
- 196
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Lees deposit includes an Inferred Resource of 196 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“196”
Context: 7.08
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 1840000Grade: 0.99Grade Unit: % Li2OContained Metal: 18.2Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:8e4b03e51e0767ed84ae
- Deposit or zone
- Booths
Resource Data
- Category
- indicated
- Tonnes
- 1840000
- Grade
- 0.99
- Grade Unit
- % Li2O
- Contained Metal
- 18.2
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Booths deposit has an Indicated Resource of 1.84 Mt at 0.99% Li2O, providing reasonable geological confidence, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“0.99”
Context: 1.84
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 1840000Contained Metal: 45Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:8e4b03e51e0767ed84ae
- Deposit or zone
- Booths
Resource Data
- Category
- indicated
- Tonnes
- 1840000
- Contained Metal
- 45
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Booths deposit has an Indicated Resource of 45 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“45”
Context: 1.84
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 1400000Grade: 1.06Grade Unit: % Li2OContained Metal: 14.8Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:828d3ebc297379bcc320
- Deposit or zone
- Booths
Resource Data
- Category
- inferred
- Tonnes
- 1400000
- Grade
- 1.06
- Grade Unit
- % Li2O
- Contained Metal
- 14.8
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Booths deposit includes an Inferred Resource of 1.40 Mt at 1.06% Li2O, which is a speculative category with lower confidence, and is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“1.06”
Context: 1.40
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 1400000Contained Metal: 37Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:828d3ebc297379bcc320
- Deposit or zone
- Booths
Resource Data
- Category
- inferred
- Tonnes
- 1400000
- Contained Metal
- 37
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Booths deposit includes an Inferred Resource of 37 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“37”
Context: 1.40
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 1710000Grade: 1.2Grade Unit: % Li2OContained Metal: 20.5Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:3a9dd263ce4b3dccbf4b
- Deposit or zone
- Ah Hoy
Resource Data
- Category
- indicated
- Tonnes
- 1710000
- Grade
- 1.2
- Grade Unit
- % Li2O
- Contained Metal
- 20.5
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Ah Hoy deposit has an Indicated Resource of 1.71 Mt at 1.20% Li2O, providing reasonable geological confidence, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.20”
Context: 1.71
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 1710000Contained Metal: 51Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:3a9dd263ce4b3dccbf4b
- Deposit or zone
- Ah Hoy
Resource Data
- Category
- indicated
- Tonnes
- 1710000
- Contained Metal
- 51
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Ah Hoy deposit has an Indicated Resource of 51 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“51”
Context: 1.71
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 2930000Grade: 1.38Grade Unit: % Li2OContained Metal: 40.4Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:ac770b8eeaeb1dac7ccb
- Deposit or zone
- Ah Hoy
Resource Data
- Category
- inferred
- Tonnes
- 2930000
- Grade
- 1.38
- Grade Unit
- % Li2O
- Contained Metal
- 40.4
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Ah Hoy deposit includes an Inferred Resource of 2.93 Mt at 1.38% Li2O, which is a speculative category with lower confidence, and is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“1.38”
Context: 2.93
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 2930000Contained Metal: 100Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:ac770b8eeaeb1dac7ccb
- Deposit or zone
- Ah Hoy
Resource Data
- Category
- inferred
- Tonnes
- 2930000
- Contained Metal
- 100
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Ah Hoy deposit includes an Inferred Resource of 100 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“100”
Context: 2.93
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 1170000Grade: 0.92Grade Unit: % Li2OContained Metal: 10.8Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:04214930d887863f8748
- Deposit or zone
- Sandras
Resource Data
- Category
- indicated
- Tonnes
- 1170000
- Grade
- 0.92
- Grade Unit
- % Li2O
- Contained Metal
- 10.8
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Sandras deposit has an Indicated Resource of 1.17 Mt at 0.92% Li2O, providing reasonable geological confidence, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“0.92”
Context: 1.17
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 1170000Contained Metal: 27Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:04214930d887863f8748
- Deposit or zone
- Sandras
Resource Data
- Category
- indicated
- Tonnes
- 1170000
- Contained Metal
- 27
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Sandras deposit has an Indicated Resource of 27 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“27”
Context: 1.17
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 570000Grade: 0.82Grade Unit: % Li2OContained Metal: 4.7Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:1edc6cd32d5a16463da3
- Deposit or zone
- Sandras
Resource Data
- Category
- inferred
- Tonnes
- 570000
- Grade
- 0.82
- Grade Unit
- % Li2O
- Contained Metal
- 4.7
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Sandras deposit includes an Inferred Resource of 0.57 Mt at 0.82% Li2O, which is a speculative category with lower confidence, and is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“0.82”
Context: 0.57
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 570000Contained Metal: 12Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:1edc6cd32d5a16463da3
- Deposit or zone
- Sandras
Resource Data
- Category
- inferred
- Tonnes
- 570000
- Contained Metal
- 12
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Sandras deposit includes an Inferred Resource of 12 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“12”
Context: 0.57
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 650000Grade: 1.25Grade Unit: % Li2OContained Metal: 8.1Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:83d64cc6736325b99fb5
- Deposit or zone
- Penfolds
Resource Data
- Category
- indicated
- Tonnes
- 650000
- Grade
- 1.25
- Grade Unit
- % Li2O
- Contained Metal
- 8.1
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Penfolds deposit has an Indicated Resource of 0.65 Mt at 1.25% Li2O, providing reasonable geological confidence, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.25”
Context: 0.65
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 650000Contained Metal: 20Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:83d64cc6736325b99fb5
- Deposit or zone
- Penfolds
Resource Data
- Category
- indicated
- Tonnes
- 650000
- Contained Metal
- 20
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Penfolds deposit has an Indicated Resource of 20 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“20”
Context: 0.65
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 710000Grade: 1.24Grade Unit: % Li2OContained Metal: 8.8Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:4a983f8f339d63dae69d
- Deposit or zone
- Penfolds
Resource Data
- Category
- inferred
- Tonnes
- 710000
- Grade
- 1.24
- Grade Unit
- % Li2O
- Contained Metal
- 8.8
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Penfolds deposit includes an Inferred Resource of 0.71 Mt at 1.24% Li2O, which is a speculative category with lower confidence, and is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“1.24”
Context: 0.71
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 710000Contained Metal: 22Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:4a983f8f339d63dae69d
- Deposit or zone
- Penfolds
Resource Data
- Category
- inferred
- Tonnes
- 710000
- Contained Metal
- 22
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Penfolds deposit includes an Inferred Resource of 22 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“22”
Context: 0.71
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 1920000Grade: 1.03Grade Unit: % Li2OContained Metal: 19.8Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:74e9c1d2a18b2b7a8b62
- Deposit or zone
- Bilatos
Resource Data
- Category
- inferred
- Tonnes
- 1920000
- Grade
- 1.03
- Grade Unit
- % Li2O
- Contained Metal
- 19.8
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Bilatos deposit includes an Inferred Resource of 1.92 Mt at 1.03% Li2O, which is a speculative category with lower confidence, and is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“1.03”
Context: 1.92
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 1920000Contained Metal: 49Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:74e9c1d2a18b2b7a8b62
- Deposit or zone
- Bilatos
Resource Data
- Category
- inferred
- Tonnes
- 1920000
- Contained Metal
- 49
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Bilatos deposit includes an Inferred Resource of 49 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“49”
Context: 1.92
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 1410000Grade: 1.18Grade Unit: % Li2OContained Metal: 16.6Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:ae2cf537ea47dac82046
- Deposit or zone
- Seadog
Resource Data
- Category
- inferred
- Tonnes
- 1410000
- Grade
- 1.18
- Grade Unit
- % Li2O
- Contained Metal
- 16.6
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Seadog deposit includes an Inferred Resource of 1.41 Mt at 1.18% Li2O, which is a speculative category with lower confidence, and is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“1.18”
Context: 1.41
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 1410000Contained Metal: 41Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:ae2cf537ea47dac82046
- Deposit or zone
- Seadog
Resource Data
- Category
- inferred
- Tonnes
- 1410000
- Contained Metal
- 41
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Seadog deposit includes an Inferred Resource of 41 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“41”
Context: 1.41
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
measuredFinniss Lithium Operation · lithiumTonnes: 6300000Grade: 1.41Grade Unit: % Li2OContained Metal: 89Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:3ceced2bb4061cbb5ea4
- Deposit or zone
- Finniss
Resource Data
- Category
- measured
- Tonnes
- 6300000
- Grade
- 1.41
- Grade Unit
- % Li2O
- Contained Metal
- 89
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The overall Finniss Lithium Operation has a Measured Resource of 6.3 Mt at 1.41% Li2O, indicating high confidence in a good grade, though this is a restatement of a prior estimate.
Positive factors
- Measured Resource
- High-grade resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.41”
Context: 6.3
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
measuredFinniss Lithium Operation · lithiumTonnes: 6300000Contained Metal: 221Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:3ceced2bb4061cbb5ea4
- Deposit or zone
- Finniss
Resource Data
- Category
- measured
- Tonnes
- 6300000
- Contained Metal
- 221
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The overall Finniss Lithium Operation has a Measured Resource of 221 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- Measured Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“221”
Context: 6.3
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 21900000Grade: 1.29Grade Unit: % Li2OContained Metal: 283Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:774f35b2e02281175c70
- Deposit or zone
- Finniss
Resource Data
- Category
- indicated
- Tonnes
- 21900000
- Grade
- 1.29
- Grade Unit
- % Li2O
- Contained Metal
- 283
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The overall Finniss Lithium Operation has a significant Indicated Resource of 21.9 Mt at 1.29% Li2O, providing strong geological confidence, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.29”
Context: 21.9
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 21900000Contained Metal: 698Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:774f35b2e02281175c70
- Deposit or zone
- Finniss
Resource Data
- Category
- indicated
- Tonnes
- 21900000
- Contained Metal
- 698
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The overall Finniss Lithium Operation has a significant Indicated Resource of 698 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“698”
Context: 21.9
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 20300000Grade: 1.18Grade Unit: % Li2OContained Metal: 239Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:05918a581a1ea4c7bf1f
- Deposit or zone
- Finniss
Resource Data
- Category
- inferred
- Tonnes
- 20300000
- Grade
- 1.18
- Grade Unit
- % Li2O
- Contained Metal
- 239
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The overall Finniss Lithium Operation includes a large Inferred Resource of 20.3 Mt at 1.18% Li2O, which is a speculative category with lower confidence, and is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“1.18”
Context: 20.3
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
inferredFinniss Lithium Operation · lithiumTonnes: 20300000Contained Metal: 592Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:05918a581a1ea4c7bf1f
- Deposit or zone
- Finniss
Resource Data
- Category
- inferred
- Tonnes
- 20300000
- Contained Metal
- 592
- Contained Unit
- kt
- Cutoff Grade
- 0.5
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The overall Finniss Lithium Operation includes a large Inferred Resource of 592 kt LiCO3, providing additional detail on the contained metal, though this is a restatement of a prior estimate.
Positive factors
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Inferred Resource
- Stale Estimate
Evidence · table
“592”
Context: 20.3
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 310000Grade: 0.66Grade Unit: % Li2OContained Metal: 2Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:4c0015f235f450c97c7f
- Deposit or zone
- TSF/Stockpiles
Resource Data
- Category
- indicated
- Tonnes
- 310000
- Grade
- 0.66
- Grade Unit
- % Li2O
- Contained Metal
- 2
- Contained Unit
- kt
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The TSF/Stockpiles have an Indicated Resource of 0.31 Mt at 0.66% Li2O, representing material from production records, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
Negative factors
- Stale Estimate
Evidence · table
“0.66”
Context: 0.31
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
indicatedFinniss Lithium Operation · lithiumTonnes: 310000Contained Metal: 4.9Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Jeremy Clark
- Resource group id
- resource:4c0015f235f450c97c7f
- Deposit or zone
- TSF/Stockpiles
Resource Data
- Category
- indicated
- Tonnes
- 310000
- Contained Metal
- 4.9
- Contained Unit
- kt
Prior Estimate
- Resource Date
- 2025-05-14
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-05-14T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The TSF/Stockpiles have an Indicated Resource of 4.9 kt LiCO3, representing material from production records, though this is a restatement of a prior estimate.
Positive factors
- Indicated Resource
- JORC Compliant
- QP/CP Signed
Negative factors
- Stale Estimate
Evidence · table
“4.9”
Context: 0.31
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
provenFinniss Lithium Operation · lithiumTonnes: 2600000Grade: 1.27Grade Unit: % Li2OContained Metal: 32Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Ben Darkwa
- Resource group id
- resource:d5800850f0eab20f28a3
- Deposit or zone
- BP33 Underground
Resource Data
- Category
- proven
- Tonnes
- 2600000
- Grade
- 1.27
- Grade Unit
- % Li2O
- Contained Metal
- 32
- Contained Unit
- kt
- Cutoff Grade
- 110
- Cutoff Unit
- $/t NSR
Prior Estimate
- Resource Date
- 2025-04-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-04-30T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The BP33 Underground deposit has a Proved Ore Reserve of 2.6 Mt at 1.27% Li2O, indicating high confidence in economic viability, though this is a restatement of a prior estimate.
Positive factors
- Proven Reserve
- High-grade resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.27”
Context: 2.6
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
probableFinniss Lithium Operation · lithiumTonnes: 6700000Grade: 1.32Grade Unit: % Li2OContained Metal: 89Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Ben Darkwa
- Resource group id
- resource:ec77db599a7e9528fc44
- Deposit or zone
- BP33 Underground
Resource Data
- Category
- probable
- Tonnes
- 6700000
- Grade
- 1.32
- Grade Unit
- % Li2O
- Contained Metal
- 89
- Contained Unit
- kt
- Cutoff Grade
- 110
- Cutoff Unit
- $/t NSR
Prior Estimate
- Resource Date
- 2025-04-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-04-30T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The BP33 Underground deposit has a significant Probable Ore Reserve of 6.7 Mt at 1.32% Li2O, indicating strong economic viability, though this is a restatement of a prior estimate.
Positive factors
- Probable Reserve
- High-grade resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.32”
Context: 6.7
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
provenFinniss Lithium Operation · lithiumTonnes: 1200000Grade: 1.43Grade Unit: % Li2OContained Metal: 17Contained Unit: ktView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Ben Darkwa
- Resource group id
- resource:643ee1a46bec9ad19523
- Deposit or zone
- Grants Open Pit and Underground
Resource Data
- Category
- proven
- Tonnes
- 1200000
- Grade
- 1.43
- Grade Unit
- % Li2O
- Contained Metal
- 17
- Contained Unit
- kt
- Cutoff Grade
- 0.8
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-10-30
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Grants Open Pit and Underground deposit has a new Proved Ore Reserve of 1.2 Mt at 1.43% Li2O, representing a significant increase in tonnage and contained metal, enhancing project economics.
Positive factors
- Proven Reserve
- High-grade resource
- Tonnage Growth
- Contained Metal Growth
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Evidence · table
“1.43”
Context: 1.2
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
probableFinniss Lithium Operation · lithiumTonnes: 400000Grade: 1.41Grade Unit: % Li2OContained Metal: 5Contained Unit: ktView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Ben Darkwa
- Resource group id
- resource:d2171e7374e4ae0b9065
- Deposit or zone
- Grants Open Pit and Underground
Resource Data
- Category
- probable
- Tonnes
- 400000
- Grade
- 1.41
- Grade Unit
- % Li2O
- Contained Metal
- 5
- Contained Unit
- kt
- Cutoff Grade
- 0.8
- Cutoff Unit
- % Li2O
Prior Estimate
- Resource Date
- 2025-10-30
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Grants Open Pit and Underground deposit has a new Probable Ore Reserve of 0.4 Mt at 1.41% Li2O, contributing to the overall increase in reserves and supporting project viability.
Positive factors
- Probable Reserve
- High-grade resource
- Tonnage Growth
- Contained Metal Growth
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Evidence · table
“1.41”
Context: 0.4
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
provenFinniss Lithium Operation · lithiumTonnes: 1700000Grade: 1.19Grade Unit: % Li2OContained Metal: 20Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Ben Darkwa
- Resource group id
- resource:7ba6149174cfe7fd5588
- Deposit or zone
- Carlton
Resource Data
- Category
- proven
- Tonnes
- 1700000
- Grade
- 1.19
- Grade Unit
- % Li2O
- Contained Metal
- 20
- Contained Unit
- kt
- Cutoff Grade
- 125
- Cutoff Unit
- $/t NSR
Prior Estimate
- Resource Date
- 2025-09-05
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-09-05T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Carlton deposit has a Proved Ore Reserve of 1.7 Mt at 1.19% Li2O, indicating high confidence in economic viability, though this is a restatement of a prior estimate.
Positive factors
- Proven Reserve
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.19”
Context: 1.7
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
probableFinniss Lithium Operation · lithiumTonnes: 2800000Grade: 1.19Grade Unit: % Li2OContained Metal: 34Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Ben Darkwa
- Resource group id
- resource:9f307ced128c00f0908b
- Deposit or zone
- Carlton
Resource Data
- Category
- probable
- Tonnes
- 2800000
- Grade
- 1.19
- Grade Unit
- % Li2O
- Contained Metal
- 34
- Contained Unit
- kt
- Cutoff Grade
- 125
- Cutoff Unit
- $/t NSR
Prior Estimate
- Resource Date
- 2025-09-05
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-09-05T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Carlton deposit has a Probable Ore Reserve of 2.8 Mt at 1.19% Li2O, indicating strong economic viability, though this is a restatement of a prior estimate.
Positive factors
- Probable Reserve
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.19”
Context: 2.8
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
probableFinniss Lithium Operation · lithiumTonnes: 300000Grade: 0.68Grade Unit: % Li2OContained Metal: 2Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Ben Darkwa
- Resource group id
- resource:ab487e08685ce4b35cb7
- Deposit or zone
- TSF/Stockpiles
Resource Data
- Category
- probable
- Tonnes
- 300000
- Grade
- 0.68
- Grade Unit
- % Li2O
- Contained Metal
- 2
- Contained Unit
- kt
Prior Estimate
- Resource Date
- 2025-04-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-04-30T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The TSF/Stockpiles have a Probable Ore Reserve of 0.3 Mt at 0.68% Li2O, representing economically viable material, though this is a restatement of a prior estimate.
Positive factors
- Probable Reserve
- JORC Compliant
- QP/CP Signed
Negative factors
- Stale Estimate
Evidence · table
“0.68”
Context: 0.3
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
provenFinniss Lithium Operation · lithiumTonnes: 2600000Grade: 1.27Grade Unit: % Li2OContained Metal: 32Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Ben Darkwa
- Resource group id
- resource:d5800850f0eab20f28a3
- Deposit or zone
- BP33 Underground
Resource Data
- Category
- proven
- Tonnes
- 2600000
- Grade
- 1.27
- Grade Unit
- % Li2O
- Contained Metal
- 32
- Contained Unit
- kt
- Cutoff Grade
- 110
- Cutoff Unit
- $/t NSR
Prior Estimate
- Resource Date
- 2025-04-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-04-30T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The BP33 Underground deposit had a Proved Ore Reserve of 2.6 Mt at 1.27% Li2O in the prior estimate, providing a baseline for comparison.
Positive factors
- Proven Reserve
- High-grade resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.27”
Context: 2.6
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
probableFinniss Lithium Operation · lithiumTonnes: 6700000Grade: 1.32Grade Unit: % Li2OContained Metal: 89Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Ben Darkwa
- Resource group id
- resource:ec77db599a7e9528fc44
- Deposit or zone
- BP33 Underground
Resource Data
- Category
- probable
- Tonnes
- 6700000
- Grade
- 1.32
- Grade Unit
- % Li2O
- Contained Metal
- 89
- Contained Unit
- kt
- Cutoff Grade
- 110
- Cutoff Unit
- $/t NSR
Prior Estimate
- Resource Date
- 2025-04-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-04-30T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The BP33 Underground deposit had a Probable Ore Reserve of 6.7 Mt at 1.32% Li2O in the prior estimate, providing a baseline for comparison.
Positive factors
- Probable Reserve
- High-grade resource
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.32”
Context: 6.7
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
provenFinniss Lithium Operation · lithiumTonnes: 900000Grade: 1.29Grade Unit: % Li2OContained Metal: 11Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Ben Darkwa
- Resource group id
- resource:b35da5b286094c083a62
- Deposit or zone
- Grants Underground
Resource Data
- Category
- proven
- Tonnes
- 900000
- Grade
- 1.29
- Grade Unit
- % Li2O
- Contained Metal
- 11
- Contained Unit
- kt
- Cutoff Grade
- 110
- Cutoff Unit
- $/t NSR
Prior Estimate
- Resource Date
- 2025-04-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-04-30T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Grants Underground deposit had a Proved Ore Reserve of 0.9 Mt at 1.29% Li2O in the prior estimate, providing a baseline for comparison.
Positive factors
- Proven Reserve
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.29”
Context: 0.9
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
probableFinniss Lithium Operation · lithiumTonnes: 300000Grade: 1.36Grade Unit: % Li2OContained Metal: 4Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Ben Darkwa
- Resource group id
- resource:3f2ea83f39a29b48aee4
- Deposit or zone
- Grants Underground
Resource Data
- Category
- probable
- Tonnes
- 300000
- Grade
- 1.36
- Grade Unit
- % Li2O
- Contained Metal
- 4
- Contained Unit
- kt
- Cutoff Grade
- 110
- Cutoff Unit
- $/t NSR
Prior Estimate
- Resource Date
- 2025-04-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-04-30T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Grants Underground deposit had a Probable Ore Reserve of 0.3 Mt at 1.36% Li2O in the prior estimate, providing a baseline for comparison.
Positive factors
- Probable Reserve
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.36”
Context: 0.3
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
provenFinniss Lithium Operation · lithiumTonnes: 1700000Grade: 1.19Grade Unit: % Li2OContained Metal: 20Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Ben Darkwa
- Resource group id
- resource:7ba6149174cfe7fd5588
- Deposit or zone
- Carlton
Resource Data
- Category
- proven
- Tonnes
- 1700000
- Grade
- 1.19
- Grade Unit
- % Li2O
- Contained Metal
- 20
- Contained Unit
- kt
- Cutoff Grade
- 125
- Cutoff Unit
- $/t NSR
Prior Estimate
- Resource Date
- 2025-09-05
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-09-05T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Carlton deposit had a Proved Ore Reserve of 1.7 Mt at 1.19% Li2O in the prior estimate, providing a baseline for comparison.
Positive factors
- Proven Reserve
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.19”
Context: 1.7
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
probableFinniss Lithium Operation · lithiumTonnes: 2800000Grade: 1.19Grade Unit: % Li2OContained Metal: 34Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Ben Darkwa
- Resource group id
- resource:9f307ced128c00f0908b
- Deposit or zone
- Carlton
Resource Data
- Category
- probable
- Tonnes
- 2800000
- Grade
- 1.19
- Grade Unit
- % Li2O
- Contained Metal
- 34
- Contained Unit
- kt
- Cutoff Grade
- 125
- Cutoff Unit
- $/t NSR
Prior Estimate
- Resource Date
- 2025-09-05
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-09-05T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The Carlton deposit had a Probable Ore Reserve of 2.8 Mt at 1.19% Li2O in the prior estimate, providing a baseline for comparison.
Positive factors
- Probable Reserve
- JORC Compliant
- QP/CP Signed
- Cut-off Disclosed
Negative factors
- Stale Estimate
Evidence · table
“1.19”
Context: 2.8
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
probableFinniss Lithium Operation · lithiumTonnes: 300000Grade: 0.68Grade Unit: % Li2OContained Metal: 2Contained Unit: ktHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Finniss Lithium Operation
- Commodity
- lithium
- Region
- australia_nt
- Reported Region
- Northern Territory
- Ticker
- CXO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Ben Darkwa
- Resource group id
- resource:ab487e08685ce4b35cb7
- Deposit or zone
- TSF/Stockpiles
Resource Data
- Category
- probable
- Tonnes
- 300000
- Grade
- 0.68
- Grade Unit
- % Li2O
- Contained Metal
- 2
- Contained Unit
- kt
Prior Estimate
- Resource Date
- 2025-04-30
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-04-30T00:00:00.000Z
Dates
- Event date
- 2026-09-23T00:00:00.000Z
Reasoning: The TSF/Stockpiles had a Probable Ore Reserve of 0.3 Mt at 0.68% Li2O in the prior estimate, providing a baseline for comparison.
Positive factors
- Probable Reserve
- JORC Compliant
- QP/CP Signed
Negative factors
- Stale Estimate
Evidence · table
“0.68”
Context: 0.3
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.