CRI: Critica Investor Webinar Presentation
Original announcement by asx on
- Company
- Critica Limited
- Ticker
- CRI
- Exchange
- ASX
- Region
- Western Australia
- Primary commodity
- Rare earths
- Secondary commodities
- Tungsten, Tin, Yttrium, Gallium, Iron ore
- Document categories
- Other, Resource update, Metallurgy
- Extracted
- 2026-10-20 22:36:59 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Critica Limited has presented positive scoping study results for its Mt Lindsay tungsten-tin project and Jupiter rare earths-yttrium-gallium project, highlighting robust economics with after-tax NPVs of A$1.0 billion and A$2.0 billion respectively. The studies outline significant pre-production capital requirements and rapid paybacks, with production targets predominantly underpinned by Indicated Mineral Resources. The company is now advancing both projects towards further feasibility studies, off-take agreements, and securing funding.
Reasoning: Critica Limited has delivered two positive scoping studies for its Mt Lindsay (tungsten-tin) and Jupiter (rare earths-yttrium-gallium) projects, demonstrating strong economics and advancing them towards feasibility. The Jupiter project, in particular, shows compelling economics and a large resource base.
Positive factors
- Strong economics demonstrated for both projects (high NPV, IRR, rapid payback)
- Large resource base for Jupiter with significant Indicated component
- Production targets predominantly from Indicated Resources for both projects
- Focus on strategic critical minerals in Tier-1 Australian jurisdictions
- Physical product samples produced for Jupiter, advancing off-take discussions
Negative factors
- Scoping Study level accuracy (±25% to +50% for Mt Lindsay, ±35% for Jupiter)
- No Ore Reserve declared for either project
- Significant pre-production funding required for both projects (A$245.0m for Mt Lindsay, A$556.0m for Jupiter)
- Mt Lindsay recoveries not simultaneously demonstrated in integrated locked-cycle test program
- Jupiter MREC pricing is modelled, not a contracted sales price
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 143
Classification and evidence
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: the document describes a flotation route ("locked-cycle")
Multi-Domain Testedpositive
Variability across ore domains (oxide, transition, fresh) has been addressed.
Why it applies: 2 distinct composites were tested
Extracted facts
Stored fact records: 139. Some facts used in scoring do not have a stored record.
Resource Estimates (129)
indicatedJupiter · treoTonnes: 220000000Grade: 1400Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- treo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e3021b5cb99b01504c9d
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 220000000
- Grade
- 1400
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 1,400 ppm TREO, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“1,400”
Context: 220
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · magreoTonnes: 220000000Grade: 350Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- magreo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e3021b5cb99b01504c9d
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 220000000
- Grade
- 350
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 350 ppm MagREO, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“350”
Context: 220
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · pr6o11Tonnes: 220000000Grade: 71Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- pr6o11
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e3021b5cb99b01504c9d
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 220000000
- Grade
- 71
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 71 ppm Pr6O11, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“71”
Context: 220
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · nd2o3Tonnes: 220000000Grade: 260Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- nd2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e3021b5cb99b01504c9d
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 220000000
- Grade
- 260
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 260 ppm Nd2O3, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“260”
Context: 220
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · tb4o7Tonnes: 220000000Grade: 3Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- tb4o7
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e3021b5cb99b01504c9d
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 220000000
- Grade
- 3
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 3 ppm Tb4O7, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“3”
Context: 220
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · dy2o3Tonnes: 220000000Grade: 15Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- dy2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e3021b5cb99b01504c9d
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 220000000
- Grade
- 15
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 15 ppm Dy2O3, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“15”
Context: 220
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · y2o3Tonnes: 220000000Grade: 75Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- y2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e3021b5cb99b01504c9d
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 220000000
- Grade
- 75
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 75 ppm Y2O3, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“75”
Context: 220
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · sc2o3Tonnes: 220000000Grade: 40Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- sc2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e3021b5cb99b01504c9d
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 220000000
- Grade
- 40
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 40 ppm Sc2O3, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“40”
Context: 220
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · ga2o3Tonnes: 220000000Grade: 39Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- ga2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e3021b5cb99b01504c9d
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 220000000
- Grade
- 39
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 39 ppm Ga2O3, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“39”
Context: 220
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · iron_oreTonnes: 220000000Grade: 9.7Grade Unit: %View all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e3021b5cb99b01504c9d
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 220000000
- Grade
- 9.7
- Grade Unit
- %
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 9.7% Fe, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“9.7”
Context: 220
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · treoTonnes: 180000000Grade: 1600Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- treo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:110cd53dd3682be0cd28
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 180000000
- Grade
- 1600
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 1,600 ppm TREO, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“1,600”
Context: 180
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · magreoTonnes: 180000000Grade: 400Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- magreo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:110cd53dd3682be0cd28
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 180000000
- Grade
- 400
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 400 ppm MagREO, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“400”
Context: 180
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · pr6o11Tonnes: 180000000Grade: 80Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- pr6o11
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:110cd53dd3682be0cd28
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 180000000
- Grade
- 80
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 80 ppm Pr6O11, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“80”
Context: 180
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · nd2o3Tonnes: 180000000Grade: 290Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- nd2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:110cd53dd3682be0cd28
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 180000000
- Grade
- 290
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 290 ppm Nd2O3, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“290”
Context: 180
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · tb4o7Tonnes: 180000000Grade: 4Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- tb4o7
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:110cd53dd3682be0cd28
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 180000000
- Grade
- 4
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 4 ppm Tb4O7, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“4”
Context: 180
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · dy2o3Tonnes: 180000000Grade: 17Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- dy2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:110cd53dd3682be0cd28
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 180000000
- Grade
- 17
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 17 ppm Dy2O3, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“17”
Context: 180
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · y2o3Tonnes: 180000000Grade: 86Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- y2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:110cd53dd3682be0cd28
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 180000000
- Grade
- 86
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 86 ppm Y2O3, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“86”
Context: 180
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · sc2o3Tonnes: 180000000Grade: 44Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- sc2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:110cd53dd3682be0cd28
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 180000000
- Grade
- 44
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 44 ppm Sc2O3, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“44”
Context: 180
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · ga2o3Tonnes: 180000000Grade: 39Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- ga2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:110cd53dd3682be0cd28
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 180000000
- Grade
- 39
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 39 ppm Ga2O3, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“39”
Context: 180
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · iron_oreTonnes: 180000000Grade: 10Grade Unit: %View all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:110cd53dd3682be0cd28
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 180000000
- Grade
- 10
- Grade Unit
- %
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 10% Fe, providing a strong foundation for future studies.
Positive factors
- Significant indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“10”
Context: 180
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · treoTonnes: 160000000Grade: 1700Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- treo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:3b99a873f2f8a6e5f33f
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 160000000
- Grade
- 1700
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 1,700 ppm TREO, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“1,700”
Context: 160
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · magreoTonnes: 160000000Grade: 420Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- magreo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:3b99a873f2f8a6e5f33f
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 160000000
- Grade
- 420
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 420 ppm MagREO, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“420”
Context: 160
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · pr6o11Tonnes: 160000000Grade: 84Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- pr6o11
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:3b99a873f2f8a6e5f33f
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 160000000
- Grade
- 84
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 84 ppm Pr6O11, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“84”
Context: 160
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · nd2o3Tonnes: 160000000Grade: 310Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- nd2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:3b99a873f2f8a6e5f33f
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 160000000
- Grade
- 310
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 310 ppm Nd2O3, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“310”
Context: 160
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · tb4o7Tonnes: 160000000Grade: 4Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- tb4o7
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:3b99a873f2f8a6e5f33f
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 160000000
- Grade
- 4
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 4 ppm Tb4O7, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“4”
Context: 160
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · dy2o3Tonnes: 160000000Grade: 18Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- dy2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:3b99a873f2f8a6e5f33f
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 160000000
- Grade
- 18
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 18 ppm Dy2O3, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“18”
Context: 160
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · y2o3Tonnes: 160000000Grade: 89Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- y2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:3b99a873f2f8a6e5f33f
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 160000000
- Grade
- 89
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 89 ppm Y2O3, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“89”
Context: 160
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · sc2o3Tonnes: 160000000Grade: 45Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- sc2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:3b99a873f2f8a6e5f33f
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 160000000
- Grade
- 45
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 45 ppm Sc2O3, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“45”
Context: 160
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · ga2o3Tonnes: 160000000Grade: 40Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- ga2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:3b99a873f2f8a6e5f33f
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 160000000
- Grade
- 40
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 40 ppm Ga2O3, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“40”
Context: 160
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · iron_oreTonnes: 160000000Grade: 11Grade Unit: %View all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:3b99a873f2f8a6e5f33f
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 160000000
- Grade
- 11
- Grade Unit
- %
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 11% Fe, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“11”
Context: 160
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · treoTonnes: 150000000Grade: 1700Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- treo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6b31418d29d287438b45
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 150000000
- Grade
- 1700
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 1,700 ppm TREO, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“1,700”
Context: 150
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · magreoTonnes: 150000000Grade: 420Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- magreo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6b31418d29d287438b45
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 150000000
- Grade
- 420
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 420 ppm MagREO, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“420”
Context: 150
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · pr6o11Tonnes: 150000000Grade: 86Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- pr6o11
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6b31418d29d287438b45
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 150000000
- Grade
- 86
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 86 ppm Pr6O11, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“86”
Context: 150
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · nd2o3Tonnes: 150000000Grade: 320Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- nd2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6b31418d29d287438b45
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 150000000
- Grade
- 320
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 320 ppm Nd2O3, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“320”
Context: 150
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · tb4o7Tonnes: 150000000Grade: 4Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- tb4o7
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6b31418d29d287438b45
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 150000000
- Grade
- 4
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 4 ppm Tb4O7, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“4”
Context: 150
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · dy2o3Tonnes: 150000000Grade: 18Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- dy2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6b31418d29d287438b45
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 150000000
- Grade
- 18
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 18 ppm Dy2O3, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“18”
Context: 150
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · y2o3Tonnes: 150000000Grade: 90Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- y2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6b31418d29d287438b45
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 150000000
- Grade
- 90
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 90 ppm Y2O3, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“90”
Context: 150
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · sc2o3Tonnes: 150000000Grade: 46Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- sc2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6b31418d29d287438b45
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 150000000
- Grade
- 46
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 46 ppm Sc2O3, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“46”
Context: 150
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · ga2o3Tonnes: 150000000Grade: 41Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- ga2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6b31418d29d287438b45
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 150000000
- Grade
- 41
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 41 ppm Ga2O3, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“41”
Context: 150
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · iron_oreTonnes: 150000000Grade: 11Grade Unit: %View all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6b31418d29d287438b45
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 150000000
- Grade
- 11
- Grade Unit
- %
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 11% Fe, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“11”
Context: 150
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · treoTonnes: 100000000Grade: 1900Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- treo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:d836be94645f574fbb49
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 100000000
- Grade
- 1900
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 1,900 ppm TREO, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“1,900”
Context: 100
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · magreoTonnes: 100000000Grade: 460Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- magreo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:d836be94645f574fbb49
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 100000000
- Grade
- 460
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 460 ppm MagREO, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“460”
Context: 100
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · pr6o11Tonnes: 100000000Grade: 94Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- pr6o11
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:d836be94645f574fbb49
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 100000000
- Grade
- 94
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 94 ppm Pr6O11, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“94”
Context: 100
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · nd2o3Tonnes: 100000000Grade: 340Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- nd2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:d836be94645f574fbb49
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 100000000
- Grade
- 340
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 340 ppm Nd2O3, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“340”
Context: 100
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · tb4o7Tonnes: 100000000Grade: 4Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- tb4o7
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:d836be94645f574fbb49
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 100000000
- Grade
- 4
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 4 ppm Tb4O7, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“4”
Context: 100
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · dy2o3Tonnes: 100000000Grade: 19Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- dy2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:d836be94645f574fbb49
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 100000000
- Grade
- 19
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 19 ppm Dy2O3, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“19”
Context: 100
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · y2o3Tonnes: 100000000Grade: 94Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- y2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:d836be94645f574fbb49
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 100000000
- Grade
- 94
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 94 ppm Y2O3, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“94”
Context: 100
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · sc2o3Tonnes: 100000000Grade: 49Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- sc2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:d836be94645f574fbb49
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 100000000
- Grade
- 49
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 49 ppm Sc2O3, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“49”
Context: 100
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · ga2o3Tonnes: 100000000Grade: 42Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- ga2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:d836be94645f574fbb49
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 100000000
- Grade
- 42
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 42 ppm Ga2O3, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“42”
Context: 100
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · iron_oreTonnes: 100000000Grade: 11Grade Unit: %View all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:d836be94645f574fbb49
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 100000000
- Grade
- 11
- Grade Unit
- %
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 11% Fe, demonstrating a high-grade component within the resource.
Positive factors
- Significant indicated resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“11”
Context: 100
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · treoTonnes: 50000000Grade: 2100Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- treo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6e08dad0a79399730f21
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 50000000
- Grade
- 2100
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 2,100 ppm TREO, indicating a valuable core within the resource.
Positive factors
- High-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“2,100”
Context: 50
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · magreoTonnes: 50000000Grade: 520Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- magreo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6e08dad0a79399730f21
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 50000000
- Grade
- 520
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 520 ppm MagREO, indicating a valuable core within the resource.
Positive factors
- High-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“520”
Context: 50
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · pr6o11Tonnes: 50000000Grade: 110Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- pr6o11
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6e08dad0a79399730f21
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 50000000
- Grade
- 110
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 110 ppm Pr6O11, indicating a valuable core within the resource.
Positive factors
- High-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“110”
Context: 50
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · nd2o3Tonnes: 50000000Grade: 390Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- nd2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6e08dad0a79399730f21
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 50000000
- Grade
- 390
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 390 ppm Nd2O3, indicating a valuable core within the resource.
Positive factors
- High-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“390”
Context: 50
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · tb4o7Tonnes: 50000000Grade: 4Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- tb4o7
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6e08dad0a79399730f21
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 50000000
- Grade
- 4
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 4 ppm Tb4O7, indicating a valuable core within the resource.
Positive factors
- High-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“4”
Context: 50
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · dy2o3Tonnes: 50000000Grade: 20Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- dy2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6e08dad0a79399730f21
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 50000000
- Grade
- 20
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 20 ppm Dy2O3, indicating a valuable core within the resource.
Positive factors
- High-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“20”
Context: 50
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · y2o3Tonnes: 50000000Grade: 99Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- y2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6e08dad0a79399730f21
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 50000000
- Grade
- 99
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 99 ppm Y2O3, indicating a valuable core within the resource.
Positive factors
- High-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“99”
Context: 50
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · sc2o3Tonnes: 50000000Grade: 53Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- sc2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6e08dad0a79399730f21
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 50000000
- Grade
- 53
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 53 ppm Sc2O3, indicating a valuable core within the resource.
Positive factors
- High-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“53”
Context: 50
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · ga2o3Tonnes: 50000000Grade: 43Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- ga2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6e08dad0a79399730f21
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 50000000
- Grade
- 43
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 43 ppm Ga2O3, indicating a valuable core within the resource.
Positive factors
- High-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“43”
Context: 50
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · iron_oreTonnes: 50000000Grade: 12Grade Unit: %View all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:6e08dad0a79399730f21
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 50000000
- Grade
- 12
- Grade Unit
- %
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 12% Fe, indicating a valuable core within the resource.
Positive factors
- High-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“12”
Context: 50
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · treoTonnes: 28000000Grade: 2300Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- treo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:c750537b891633d22737
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 28000000
- Grade
- 2300
- Grade Unit
- ppm
- Cutoff Grade
- 2000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 2,300 ppm TREO, highlighting a significant high-value component.
Positive factors
- Very high-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“2,300”
Context: 28
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · magreoTonnes: 28000000Grade: 560Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- magreo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:c750537b891633d22737
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 28000000
- Grade
- 560
- Grade Unit
- ppm
- Cutoff Grade
- 2000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 560 ppm MagREO, highlighting a significant high-value component.
Positive factors
- Very high-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“560”
Context: 28
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · pr6o11Tonnes: 28000000Grade: 120Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- pr6o11
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:c750537b891633d22737
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 28000000
- Grade
- 120
- Grade Unit
- ppm
- Cutoff Grade
- 2000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 120 ppm Pr6O11, highlighting a significant high-value component.
Positive factors
- Very high-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“120”
Context: 28
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · nd2o3Tonnes: 28000000Grade: 420Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- nd2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:c750537b891633d22737
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 28000000
- Grade
- 420
- Grade Unit
- ppm
- Cutoff Grade
- 2000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 420 ppm Nd2O3, highlighting a significant high-value component.
Positive factors
- Very high-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“420”
Context: 28
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · tb4o7Tonnes: 28000000Grade: 5Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- tb4o7
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:c750537b891633d22737
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 28000000
- Grade
- 5
- Grade Unit
- ppm
- Cutoff Grade
- 2000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 5 ppm Tb4O7, highlighting a significant high-value component.
Positive factors
- Very high-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“5”
Context: 28
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · dy2o3Tonnes: 28000000Grade: 22Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- dy2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:c750537b891633d22737
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 28000000
- Grade
- 22
- Grade Unit
- ppm
- Cutoff Grade
- 2000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 22 ppm Dy2O3, highlighting a significant high-value component.
Positive factors
- Very high-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“22”
Context: 28
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · y2o3Tonnes: 28000000Grade: 104Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- y2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:c750537b891633d22737
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 28000000
- Grade
- 104
- Grade Unit
- ppm
- Cutoff Grade
- 2000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 104 ppm Y2O3, highlighting a significant high-value component.
Positive factors
- Very high-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“104”
Context: 28
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · sc2o3Tonnes: 28000000Grade: 56Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- sc2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:c750537b891633d22737
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 28000000
- Grade
- 56
- Grade Unit
- ppm
- Cutoff Grade
- 2000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 56 ppm Sc2O3, highlighting a significant high-value component.
Positive factors
- Very high-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“56”
Context: 28
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · ga2o3Tonnes: 28000000Grade: 44Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- ga2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:c750537b891633d22737
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 28000000
- Grade
- 44
- Grade Unit
- ppm
- Cutoff Grade
- 2000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 44 ppm Ga2O3, highlighting a significant high-value component.
Positive factors
- Very high-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“44”
Context: 28
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedJupiter · iron_oreTonnes: 28000000Grade: 12Grade Unit: %View all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:c750537b891633d22737
- Ownership percent
- 100 %
Resource Data
- Category
- indicated
- Tonnes
- 28000000
- Grade
- 12
- Grade Unit
- %
- Cutoff Grade
- 2000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 12% Fe, highlighting a significant high-value component.
Positive factors
- Very high-grade indicated resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Evidence · table
“12”
Context: 28
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · treoTonnes: 2500000000Grade: 1300Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- treo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:89f456685f6e6768173c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 2500000000
- Grade
- 1300
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 1,300 ppm TREO, indicating significant exploration potential.
Positive factors
- Very large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“1,300”
Context: 2,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · magreoTonnes: 2500000000Grade: 290Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- magreo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:89f456685f6e6768173c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 2500000000
- Grade
- 290
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 290 ppm MagREO, indicating significant exploration potential.
Positive factors
- Very large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“290”
Context: 2,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · pr6o11Tonnes: 2500000000Grade: 62Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- pr6o11
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:89f456685f6e6768173c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 2500000000
- Grade
- 62
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 62 ppm Pr6O11, indicating significant exploration potential.
Positive factors
- Very large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“62”
Context: 2,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · nd2o3Tonnes: 2500000000Grade: 210Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- nd2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:89f456685f6e6768173c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 2500000000
- Grade
- 210
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 210 ppm Nd2O3, indicating significant exploration potential.
Positive factors
- Very large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“210”
Context: 2,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · tb4o7Tonnes: 2500000000Grade: 2Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- tb4o7
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:89f456685f6e6768173c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 2500000000
- Grade
- 2
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 2 ppm Tb4O7, indicating significant exploration potential.
Positive factors
- Very large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“2”
Context: 2,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · dy2o3Tonnes: 2500000000Grade: 11Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- dy2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:89f456685f6e6768173c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 2500000000
- Grade
- 11
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 11 ppm Dy2O3, indicating significant exploration potential.
Positive factors
- Very large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“11”
Context: 2,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · y2o3Tonnes: 2500000000Grade: 55Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- y2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:89f456685f6e6768173c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 2500000000
- Grade
- 55
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 55 ppm Y2O3, indicating significant exploration potential.
Positive factors
- Very large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“55”
Context: 2,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · sc2o3Tonnes: 2500000000Grade: 30Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- sc2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:89f456685f6e6768173c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 2500000000
- Grade
- 30
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 30 ppm Sc2O3, indicating significant exploration potential.
Positive factors
- Very large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“30”
Context: 2,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · ga2o3Tonnes: 2500000000Grade: 38Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- ga2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:89f456685f6e6768173c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 2500000000
- Grade
- 38
- Grade Unit
- ppm
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 38 ppm Ga2O3, indicating significant exploration potential.
Positive factors
- Very large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“38”
Context: 2,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · iron_oreTonnes: 2500000000Grade: 6.9Grade Unit: %View all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:89f456685f6e6768173c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 2500000000
- Grade
- 6.9
- Grade Unit
- %
- Cutoff Grade
- 400
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 6.9% Fe, indicating significant exploration potential.
Positive factors
- Very large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“6.9”
Context: 2,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · treoTonnes: 1700000000Grade: 1600Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- treo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:2ec7232e17388cd640f1
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1700000000
- Grade
- 1600
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 1,600 ppm TREO, indicating significant exploration potential.
Positive factors
- Large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“1,600”
Context: 1,700
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · magreoTonnes: 1700000000Grade: 360Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- magreo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:2ec7232e17388cd640f1
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1700000000
- Grade
- 360
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 360 ppm MagREO, indicating significant exploration potential.
Positive factors
- Large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“360”
Context: 1,700
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · pr6o11Tonnes: 1700000000Grade: 77Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- pr6o11
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:2ec7232e17388cd640f1
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1700000000
- Grade
- 77
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 77 ppm Pr6O11, indicating significant exploration potential.
Positive factors
- Large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“77”
Context: 1,700
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · nd2o3Tonnes: 1700000000Grade: 270Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- nd2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:2ec7232e17388cd640f1
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1700000000
- Grade
- 270
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 270 ppm Nd2O3, indicating significant exploration potential.
Positive factors
- Large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“270”
Context: 1,700
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · tb4o7Tonnes: 1700000000Grade: 3Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- tb4o7
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:2ec7232e17388cd640f1
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1700000000
- Grade
- 3
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 3 ppm Tb4O7, indicating significant exploration potential.
Positive factors
- Large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“3”
Context: 1,700
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · dy2o3Tonnes: 1700000000Grade: 13Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- dy2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:2ec7232e17388cd640f1
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1700000000
- Grade
- 13
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 13 ppm Dy2O3, indicating significant exploration potential.
Positive factors
- Large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“13”
Context: 1,700
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · y2o3Tonnes: 1700000000Grade: 69Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- y2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:2ec7232e17388cd640f1
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1700000000
- Grade
- 69
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 69 ppm Y2O3, indicating significant exploration potential.
Positive factors
- Large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“69”
Context: 1,700
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · sc2o3Tonnes: 1700000000Grade: 35Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- sc2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:2ec7232e17388cd640f1
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1700000000
- Grade
- 35
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 35 ppm Sc2O3, indicating significant exploration potential.
Positive factors
- Large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“35”
Context: 1,700
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · ga2o3Tonnes: 1700000000Grade: 39Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- ga2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:2ec7232e17388cd640f1
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1700000000
- Grade
- 39
- Grade Unit
- ppm
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 39 ppm Ga2O3, indicating significant exploration potential.
Positive factors
- Large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“39”
Context: 1,700
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · iron_oreTonnes: 1700000000Grade: 7.3Grade Unit: %View all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:2ec7232e17388cd640f1
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1700000000
- Grade
- 7.3
- Grade Unit
- %
- Cutoff Grade
- 800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 7.3% Fe, indicating significant exploration potential.
Positive factors
- Large inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“7.3”
Context: 1,700
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · treoTonnes: 1500000000Grade: 1700Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- treo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:cef42186b7406c0b3713
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1500000000
- Grade
- 1700
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 1,700 ppm TREO, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“1,700”
Context: 1,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · magreoTonnes: 1500000000Grade: 380Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- magreo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:cef42186b7406c0b3713
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1500000000
- Grade
- 380
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 380 ppm MagREO, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“380”
Context: 1,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · pr6o11Tonnes: 1500000000Grade: 82Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- pr6o11
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:cef42186b7406c0b3713
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1500000000
- Grade
- 82
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 82 ppm Pr6O11, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“82”
Context: 1,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · nd2o3Tonnes: 1500000000Grade: 280Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- nd2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:cef42186b7406c0b3713
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1500000000
- Grade
- 280
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 280 ppm Nd2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“280”
Context: 1,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · tb4o7Tonnes: 1500000000Grade: 3Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- tb4o7
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:cef42186b7406c0b3713
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1500000000
- Grade
- 3
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 3 ppm Tb4O7, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“3”
Context: 1,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · dy2o3Tonnes: 1500000000Grade: 14Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- dy2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:cef42186b7406c0b3713
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1500000000
- Grade
- 14
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 14 ppm Dy2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“14”
Context: 1,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · y2o3Tonnes: 1500000000Grade: 72Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- y2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:cef42186b7406c0b3713
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1500000000
- Grade
- 72
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 72 ppm Y2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“72”
Context: 1,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · sc2o3Tonnes: 1500000000Grade: 36Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- sc2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:cef42186b7406c0b3713
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1500000000
- Grade
- 36
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 36 ppm Sc2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“36”
Context: 1,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · ga2o3Tonnes: 1500000000Grade: 40Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- ga2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:cef42186b7406c0b3713
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1500000000
- Grade
- 40
- Grade Unit
- ppm
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 40 ppm Ga2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“40”
Context: 1,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · iron_oreTonnes: 1500000000Grade: 7.5Grade Unit: %View all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:cef42186b7406c0b3713
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1500000000
- Grade
- 7.5
- Grade Unit
- %
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 7.5% Fe, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“7.5”
Context: 1,500
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · treoTonnes: 1400000000Grade: 1700Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- treo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e2422974ea5b860b7aba
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1400000000
- Grade
- 1700
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 1,700 ppm TREO, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“1,700”
Context: 1,400
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · magreoTonnes: 1400000000Grade: 400Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- magreo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e2422974ea5b860b7aba
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1400000000
- Grade
- 400
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 400 ppm MagREO, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“400”
Context: 1,400
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · pr6o11Tonnes: 1400000000Grade: 85Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- pr6o11
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e2422974ea5b860b7aba
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1400000000
- Grade
- 85
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 85 ppm Pr6O11, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“85”
Context: 1,400
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · nd2o3Tonnes: 1400000000Grade: 290Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- nd2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e2422974ea5b860b7aba
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1400000000
- Grade
- 290
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 290 ppm Nd2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“290”
Context: 1,400
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · tb4o7Tonnes: 1400000000Grade: 3Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- tb4o7
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e2422974ea5b860b7aba
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1400000000
- Grade
- 3
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 3 ppm Tb4O7, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“3”
Context: 1,400
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · dy2o3Tonnes: 1400000000Grade: 14Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- dy2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e2422974ea5b860b7aba
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1400000000
- Grade
- 14
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 14 ppm Dy2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“14”
Context: 1,400
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · y2o3Tonnes: 1400000000Grade: 74Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- y2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e2422974ea5b860b7aba
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1400000000
- Grade
- 74
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 74 ppm Y2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“74”
Context: 1,400
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · sc2o3Tonnes: 1400000000Grade: 37Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- sc2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e2422974ea5b860b7aba
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1400000000
- Grade
- 37
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 37 ppm Sc2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“37”
Context: 1,400
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · ga2o3Tonnes: 1400000000Grade: 40Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- ga2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e2422974ea5b860b7aba
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1400000000
- Grade
- 40
- Grade Unit
- ppm
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 40 ppm Ga2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“40”
Context: 1,400
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · iron_oreTonnes: 1400000000Grade: 7.7Grade Unit: %View all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:e2422974ea5b860b7aba
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 1400000000
- Grade
- 7.7
- Grade Unit
- %
- Cutoff Grade
- 1200
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 7.7% Fe, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“7.7”
Context: 1,400
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · treoTonnes: 900000000Grade: 1900Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- treo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:8e4e68b89c999806214c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 900000000
- Grade
- 1900
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 1,900 ppm TREO, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“1,900”
Context: 900
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · magreoTonnes: 900000000Grade: 440Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- magreo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:8e4e68b89c999806214c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 900000000
- Grade
- 440
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 440 ppm MagREO, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“440”
Context: 900
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · pr6o11Tonnes: 900000000Grade: 94Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- pr6o11
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:8e4e68b89c999806214c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 900000000
- Grade
- 94
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 94 ppm Pr6O11, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“94”
Context: 900
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · nd2o3Tonnes: 900000000Grade: 330Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- nd2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:8e4e68b89c999806214c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 900000000
- Grade
- 330
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 330 ppm Nd2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“330”
Context: 900
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · tb4o7Tonnes: 900000000Grade: 3Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- tb4o7
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:8e4e68b89c999806214c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 900000000
- Grade
- 3
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 3 ppm Tb4O7, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“3”
Context: 900
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · dy2o3Tonnes: 900000000Grade: 16Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- dy2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:8e4e68b89c999806214c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 900000000
- Grade
- 16
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 16 ppm Dy2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“16”
Context: 900
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · y2o3Tonnes: 900000000Grade: 80Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- y2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:8e4e68b89c999806214c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 900000000
- Grade
- 80
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 80 ppm Y2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“80”
Context: 900
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · sc2o3Tonnes: 900000000Grade: 39Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- sc2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:8e4e68b89c999806214c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 900000000
- Grade
- 39
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 39 ppm Sc2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“39”
Context: 900
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · ga2o3Tonnes: 900000000Grade: 41Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- ga2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:8e4e68b89c999806214c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 900000000
- Grade
- 41
- Grade Unit
- ppm
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 41 ppm Ga2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“41”
Context: 900
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · iron_oreTonnes: 900000000Grade: 7.9Grade Unit: %View all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:8e4e68b89c999806214c
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 900000000
- Grade
- 7.9
- Grade Unit
- %
- Cutoff Grade
- 1500
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 7.9% Fe, indicating significant exploration potential at a higher cut-off.
Positive factors
- Large inferred resource tonnage at a higher cut-off grade
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“7.9”
Context: 900
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · treoTonnes: 460000000Grade: 2200Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- treo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:83ce36c8c959ad9f30a5
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 460000000
- Grade
- 2200
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 2,200 ppm TREO, indicating significant exploration potential at a higher cut-off.
Positive factors
- High-grade inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“2,200”
Context: 460
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · magreoTonnes: 460000000Grade: 500Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- magreo
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:83ce36c8c959ad9f30a5
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 460000000
- Grade
- 500
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 500 ppm MagREO, indicating significant exploration potential at a higher cut-off.
Positive factors
- High-grade inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“500”
Context: 460
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · pr6o11Tonnes: 460000000Grade: 110Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- pr6o11
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:83ce36c8c959ad9f30a5
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 460000000
- Grade
- 110
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 110 ppm Pr6O11, indicating significant exploration potential at a higher cut-off.
Positive factors
- High-grade inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“110”
Context: 460
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · nd2o3Tonnes: 460000000Grade: 370Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- nd2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:83ce36c8c959ad9f30a5
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 460000000
- Grade
- 370
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 370 ppm Nd2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- High-grade inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“370”
Context: 460
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · tb4o7Tonnes: 460000000Grade: 4Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- tb4o7
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:83ce36c8c959ad9f30a5
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 460000000
- Grade
- 4
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 4 ppm Tb4O7, indicating significant exploration potential at a higher cut-off.
Positive factors
- High-grade inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“4”
Context: 460
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · dy2o3Tonnes: 460000000Grade: 17Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- dy2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:83ce36c8c959ad9f30a5
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 460000000
- Grade
- 17
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 17 ppm Dy2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- High-grade inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“17”
Context: 460
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · y2o3Tonnes: 460000000Grade: 87Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- y2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:83ce36c8c959ad9f30a5
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 460000000
- Grade
- 87
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 87 ppm Y2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- High-grade inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“87”
Context: 460
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · sc2o3Tonnes: 460000000Grade: 40Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- sc2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:83ce36c8c959ad9f30a5
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 460000000
- Grade
- 40
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 40 ppm Sc2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- High-grade inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“40”
Context: 460
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredJupiter · ga2o3Tonnes: 460000000Grade: 42Grade Unit: ppmView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- ga2o3
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CRI
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
- Resource group id
- resource:83ce36c8c959ad9f30a5
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 460000000
- Grade
- 42
- Grade Unit
- ppm
- Cutoff Grade
- 1800
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-10-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 42 ppm Ga2O3, indicating significant exploration potential at a higher cut-off.
Positive factors
- High-grade inferred resource tonnage
- JORC 2012 compliant estimate with QP sign-off
Negative factors
- Inferred category has low geological confidence
Evidence · table
“42”
Context: 460
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Metallurgical Results (10)
Fact 1Mt Lindsay · tinRecovery: 75 %View all detailsHide details
Identity
- Project
- Mt Lindsay
- Commodity
- tin
- Ticker
- CRI
Test Work
- Program Status
- scoping
- Processing Route
- conventional flowsheet
Recovery
- Recovery
- 75 %
- Recovery Basis
- unspecified
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Mt Lindsay Scoping Study assumes a 75% tin recovery for its conventional flowsheet, which is a reasonable target for a scoping study, though not yet demonstrated in integrated testwork.
Positive factors
- Recovery is part of a conventional flowsheet
Negative factors
- Recoveries not simultaneously demonstrated in a single integrated locked-cycle test program
- Recovery basis unspecified
Evidence · text
“Base Case processing recoveries of 75% tin, 85% WO₃ and 98% magnetite are modestly above recoveries demonstrated or estimated in individual historical testwork programs and have not all been demonstrated simultaneously in a single integrated locked-cycle test program.”
Fact 2Mt Lindsay · tungstenRecovery: 85 %View all detailsHide details
Identity
- Project
- Mt Lindsay
- Commodity
- tungsten
- Ticker
- CRI
Test Work
- Program Status
- scoping
- Processing Route
- conventional flowsheet
Recovery
- Recovery
- 85 %
- Recovery Basis
- unspecified
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Mt Lindsay Scoping Study assumes an 85% tungsten recovery for its conventional flowsheet, which is a reasonable target for a scoping study, though not yet demonstrated in integrated testwork.
Positive factors
- Recovery is part of a conventional flowsheet
Negative factors
- Recoveries not simultaneously demonstrated in a single integrated locked-cycle test program
- Recovery basis unspecified
Evidence · text
“Base Case processing recoveries of 75% tin, 85% WO₃ and 98% magnetite are modestly above recoveries demonstrated or estimated in individual historical testwork programs and have not all been demonstrated simultaneously in a single integrated locked-cycle test program.”
Fact 3Mt Lindsay · magnetiteRecovery: 98 %View all detailsHide details
Identity
- Project
- Mt Lindsay
- Commodity
- magnetite
- Ticker
- CRI
Test Work
- Program Status
- scoping
- Processing Route
- conventional flowsheet
Recovery
- Recovery
- 98 %
- Recovery Basis
- unspecified
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Mt Lindsay Scoping Study assumes a 98% magnetite recovery for its conventional flowsheet, which is a reasonable target for a scoping study, though not yet demonstrated in integrated testwork.
Positive factors
- Recovery is part of a conventional flowsheet
Negative factors
- Recoveries not simultaneously demonstrated in a single integrated locked-cycle test program
- Recovery basis unspecified
Evidence · text
“Base Case processing recoveries of 75% tin, 85% WO₃ and 98% magnetite are modestly above recoveries demonstrated or estimated in individual historical testwork programs and have not all been demonstrated simultaneously in a single integrated locked-cycle test program.”
Fact 4Jupiter · rare_earthsRecovery: 58 %View all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- rare_earths
- Ticker
- CRI
Test Work
- Program Status
- scoping
- Processing Route
- Beneficiation + Hydrometallurgical
Recovery
- Recovery
- 58 %
- Recovery Basis
- theoretical
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter Scoping Study models an overall TREO recovery of 58% for its beneficiation and hydrometallurgical flowsheet, which is a key assumption for the project's economics.
Positive factors
- Overall recovery for the proposed flowsheet
- Beneficiation first approach reduces downstream processing volume
Negative factors
- Recovery is modelled, not yet fully demonstrated in integrated testwork
Evidence · text
“The Base Case financial model adopts approximately 58% overall TREO recovery, comprising 69% beneficiation recovery and approximately 84% downstream hydrometallurgical recovery, compared with Sedgman’s approximately 63% overall process design basis.”
Tags used in scoring
Theoretical Recovery Onlynegative
Only theoretical or liberation-derived recovery reported, with no actual test result.
Why it applies: recovery_basis is theoretical
Fact 5Jupiter · rare_earthsRecovery: 69 %View all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- rare_earths
- Ticker
- CRI
Test Work
- Program Status
- scoping
- Processing Route
- Beneficiation
Recovery
- Recovery
- 69 %
- Recovery Basis
- actual_test
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter Scoping Study assumes a 69% beneficiation recovery, which is a critical step in reducing the mass requiring downstream chemical processing.
Positive factors
- Beneficiation recovery is a key step in the flowsheet
- High mass rejection before hydrometallurgy
Evidence · text
“The Base Case financial model adopts approximately 58% overall TREO recovery, comprising 69% beneficiation recovery and approximately 84% downstream hydrometallurgical recovery, compared with Sedgman’s approximately 63% overall process design basis.”
Fact 6Jupiter · rare_earthsRecovery: 84 %View all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- rare_earths
- Ticker
- CRI
Test Work
- Program Status
- scoping
- Processing Route
- Hydrometallurgical
Recovery
- Recovery
- 84 %
- Recovery Basis
- actual_test
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter Scoping Study assumes an 84% downstream hydrometallurgical recovery, contributing to the overall TREO recovery.
Positive factors
- Hydrometallurgical recovery is a key step in the flowsheet
Evidence · text
“The Base Case financial model adopts approximately 58% overall TREO recovery, comprising 69% beneficiation recovery and approximately 84% downstream hydrometallurgical recovery, compared with Sedgman’s approximately 63% overall process design basis.”
Fact 7Jupiter · rare_earthsView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- rare_earths
- Ticker
- CRI
Test Work
- Program Status
- scoping
- Processing Route
- Beneficiation + Hydrometallurgical
Recovery
- Conc. Grade
- 58
- Conc. Grade Unit
- % TREO
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project targets a high-grade Mixed Rare Earth Carbonate (MREC) product with approximately 58% TREO, which is a key output for downstream separation.
Positive factors
- High-grade MREC product is targeted
- Magnet rare earth exposure (Nd, Pr, Dy, Tb)
Evidence · text
“MIXED RARE EARTH CARBONATE ~58% TREO Modelled MREC product grade”
Fact 8Jupiter · rare_earthsView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- rare_earths
- Ticker
- CRI
Test Work
- Program Status
- scoping
- Processing Route
- Beneficiation + Hydrometallurgical
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: The Jupiter project aims for a substantial LOM average production of approximately 8,300 tpa of contained TREO in MREC, indicating a large-scale operation.
Positive factors
- Significant LOM average production of contained TREO in MREC
Evidence · text
“LOM AVERAGE PRODUCTION ~8,300 tpa Contained TREO in MREC”
Fact 9Jupiter · rare_earthsView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- rare_earths
- Ticker
- CRI
Test Work
- Program Status
- optimization
- Sample
- Latest MREO sample
Recovery
- Conc. Grade
- 98.2
- Conc. Grade Unit
- % TREO
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: Critica has produced a high-purity Mixed Rare Earth Oxide (MREO) sample grading 98.2% TREO, which is a significant step towards product qualification and off-take agreements.
Positive factors
- Very high purity rare earth product achieved
- Sample available for customer evaluation and qualification
- Includes magnet rare earths (Nd, Pr, Dy, Tb) and Yttrium
Evidence · text
“Latest MREO sample: 98.2% TREO, including 28.4% MagREO/TREO.”
Fact 10Jupiter · iron_oreView all detailsHide details
Identity
- Project
- Jupiter
- Commodity
- iron_ore
- Ticker
- CRI
Test Work
- Program Status
- optimization
- Sample
- Iron concentrate sample
Recovery
- Conc. Grade
- 64.1
- Conc. Grade Unit
- % Fe
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-20T00:00:00.000Z
Reasoning: A high-grade magnetite concentrate sample of 64.1% Fe has been produced, indicating potential for an iron by-product, although it is not yet included in the project's base case economics.
Positive factors
- High-grade magnetite concentrate sample produced
- Potential future by-product revenue stream
Negative factors
- No iron revenue included in the Scoping Study Base Case
Evidence · text
“Iron concentrate sample: 64.1% Fe.”
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.