CRI: Critica Investor Webinar Presentation

Original announcement by asx on

Company
Critica Limited
Ticker
CRI
Exchange
ASX
Region
Western Australia
Primary commodity
Rare earths
Secondary commodities
Tungsten, Tin, Yttrium, Gallium, Iron ore
Document categories
Other, Resource update, Metallurgy
Extracted
2026-10-20 22:36:59 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Critica Limited has presented positive scoping study results for its Mt Lindsay tungsten-tin project and Jupiter rare earths-yttrium-gallium project, highlighting robust economics with after-tax NPVs of A$1.0 billion and A$2.0 billion respectively. The studies outline significant pre-production capital requirements and rapid paybacks, with production targets predominantly underpinned by Indicated Mineral Resources. The company is now advancing both projects towards further feasibility studies, off-take agreements, and securing funding.

Reasoning: Critica Limited has delivered two positive scoping studies for its Mt Lindsay (tungsten-tin) and Jupiter (rare earths-yttrium-gallium) projects, demonstrating strong economics and advancing them towards feasibility. The Jupiter project, in particular, shows compelling economics and a large resource base.

Positive factors

  • Strong economics demonstrated for both projects (high NPV, IRR, rapid payback)
  • Large resource base for Jupiter with significant Indicated component
  • Production targets predominantly from Indicated Resources for both projects
  • Focus on strategic critical minerals in Tier-1 Australian jurisdictions
  • Physical product samples produced for Jupiter, advancing off-take discussions

Negative factors

  • Scoping Study level accuracy (±25% to +50% for Mt Lindsay, ±35% for Jupiter)
  • No Ore Reserve declared for either project
  • Significant pre-production funding required for both projects (A$245.0m for Mt Lindsay, A$556.0m for Jupiter)
  • Mt Lindsay recoveries not simultaneously demonstrated in integrated locked-cycle test program
  • Jupiter MREC pricing is modelled, not a contracted sales price

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 143

Classification and evidence

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: the document describes a flotation route ("locked-cycle")

Multi-Domain Testedpositive

Variability across ore domains (oxide, transition, fresh) has been addressed.

Why it applies: 2 distinct composites were tested

Extracted facts

Stored fact records: 139. Some facts used in scoring do not have a stored record.

Resource Estimates (129)

indicatedJupiter · treoTonnes: 220000000Grade: 1400Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
treo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e3021b5cb99b01504c9d
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
220000000
Grade
1400
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 1,400 ppm TREO, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“1,400”

Context: 220

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · magreoTonnes: 220000000Grade: 350Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
magreo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e3021b5cb99b01504c9d
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
220000000
Grade
350
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 350 ppm MagREO, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“350”

Context: 220

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · pr6o11Tonnes: 220000000Grade: 71Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
pr6o11
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e3021b5cb99b01504c9d
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
220000000
Grade
71
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 71 ppm Pr6O11, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“71”

Context: 220

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · nd2o3Tonnes: 220000000Grade: 260Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
nd2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e3021b5cb99b01504c9d
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
220000000
Grade
260
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 260 ppm Nd2O3, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“260”

Context: 220

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · tb4o7Tonnes: 220000000Grade: 3Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
tb4o7
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e3021b5cb99b01504c9d
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
220000000
Grade
3
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 3 ppm Tb4O7, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“3”

Context: 220

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · dy2o3Tonnes: 220000000Grade: 15Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
dy2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e3021b5cb99b01504c9d
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
220000000
Grade
15
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 15 ppm Dy2O3, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“15”

Context: 220

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · y2o3Tonnes: 220000000Grade: 75Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
y2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e3021b5cb99b01504c9d
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
220000000
Grade
75
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 75 ppm Y2O3, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“75”

Context: 220

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · sc2o3Tonnes: 220000000Grade: 40Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
sc2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e3021b5cb99b01504c9d
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
220000000
Grade
40
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 40 ppm Sc2O3, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“40”

Context: 220

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · ga2o3Tonnes: 220000000Grade: 39Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
ga2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e3021b5cb99b01504c9d
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
220000000
Grade
39
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 39 ppm Ga2O3, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“39”

Context: 220

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · iron_oreTonnes: 220000000Grade: 9.7Grade Unit: %View all details
Link to this fact

Identity

Project
Jupiter
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e3021b5cb99b01504c9d
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
220000000
Grade
9.7
Grade Unit
%
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 220 Mt at 9.7% Fe, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“9.7”

Context: 220

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · treoTonnes: 180000000Grade: 1600Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
treo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:110cd53dd3682be0cd28
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
180000000
Grade
1600
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 1,600 ppm TREO, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“1,600”

Context: 180

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · magreoTonnes: 180000000Grade: 400Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
magreo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:110cd53dd3682be0cd28
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
180000000
Grade
400
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 400 ppm MagREO, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“400”

Context: 180

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · pr6o11Tonnes: 180000000Grade: 80Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
pr6o11
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:110cd53dd3682be0cd28
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
180000000
Grade
80
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 80 ppm Pr6O11, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“80”

Context: 180

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · nd2o3Tonnes: 180000000Grade: 290Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
nd2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:110cd53dd3682be0cd28
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
180000000
Grade
290
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 290 ppm Nd2O3, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“290”

Context: 180

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · tb4o7Tonnes: 180000000Grade: 4Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Jupiter
Commodity
tb4o7
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:110cd53dd3682be0cd28
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
180000000
Grade
4
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 4 ppm Tb4O7, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“4”

Context: 180

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · dy2o3Tonnes: 180000000Grade: 17Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
dy2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:110cd53dd3682be0cd28
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
180000000
Grade
17
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 17 ppm Dy2O3, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“17”

Context: 180

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · y2o3Tonnes: 180000000Grade: 86Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
y2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:110cd53dd3682be0cd28
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
180000000
Grade
86
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 86 ppm Y2O3, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“86”

Context: 180

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · sc2o3Tonnes: 180000000Grade: 44Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
sc2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:110cd53dd3682be0cd28
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
180000000
Grade
44
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 44 ppm Sc2O3, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“44”

Context: 180

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · ga2o3Tonnes: 180000000Grade: 39Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
ga2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:110cd53dd3682be0cd28
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
180000000
Grade
39
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 39 ppm Ga2O3, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“39”

Context: 180

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · iron_oreTonnes: 180000000Grade: 10Grade Unit: %View all details
Link to this fact

Identity

Project
Jupiter
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:110cd53dd3682be0cd28
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
180000000
Grade
10
Grade Unit
%
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 180 Mt at 10% Fe, providing a strong foundation for future studies.

Positive factors

  • Significant indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“10”

Context: 180

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · treoTonnes: 160000000Grade: 1700Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
treo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:3b99a873f2f8a6e5f33f
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
160000000
Grade
1700
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 1,700 ppm TREO, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“1,700”

Context: 160

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · magreoTonnes: 160000000Grade: 420Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
magreo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:3b99a873f2f8a6e5f33f
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
160000000
Grade
420
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 420 ppm MagREO, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“420”

Context: 160

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · pr6o11Tonnes: 160000000Grade: 84Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
pr6o11
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:3b99a873f2f8a6e5f33f
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
160000000
Grade
84
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 84 ppm Pr6O11, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“84”

Context: 160

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · nd2o3Tonnes: 160000000Grade: 310Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
nd2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:3b99a873f2f8a6e5f33f
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
160000000
Grade
310
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 310 ppm Nd2O3, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“310”

Context: 160

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · tb4o7Tonnes: 160000000Grade: 4Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Jupiter
Commodity
tb4o7
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:3b99a873f2f8a6e5f33f
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
160000000
Grade
4
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 4 ppm Tb4O7, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“4”

Context: 160

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · dy2o3Tonnes: 160000000Grade: 18Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
dy2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:3b99a873f2f8a6e5f33f
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
160000000
Grade
18
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 18 ppm Dy2O3, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“18”

Context: 160

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · y2o3Tonnes: 160000000Grade: 89Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
y2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:3b99a873f2f8a6e5f33f
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
160000000
Grade
89
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 89 ppm Y2O3, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“89”

Context: 160

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · sc2o3Tonnes: 160000000Grade: 45Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
sc2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:3b99a873f2f8a6e5f33f
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
160000000
Grade
45
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 45 ppm Sc2O3, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“45”

Context: 160

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · ga2o3Tonnes: 160000000Grade: 40Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
ga2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:3b99a873f2f8a6e5f33f
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
160000000
Grade
40
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 40 ppm Ga2O3, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“40”

Context: 160

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · iron_oreTonnes: 160000000Grade: 11Grade Unit: %View all details
Link to this fact

Identity

Project
Jupiter
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:3b99a873f2f8a6e5f33f
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
160000000
Grade
11
Grade Unit
%
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 160 Mt at 11% Fe, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“11”

Context: 160

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · treoTonnes: 150000000Grade: 1700Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
treo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6b31418d29d287438b45
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
150000000
Grade
1700
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 1,700 ppm TREO, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“1,700”

Context: 150

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · magreoTonnes: 150000000Grade: 420Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
magreo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6b31418d29d287438b45
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
150000000
Grade
420
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 420 ppm MagREO, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“420”

Context: 150

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · pr6o11Tonnes: 150000000Grade: 86Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
pr6o11
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6b31418d29d287438b45
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
150000000
Grade
86
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 86 ppm Pr6O11, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“86”

Context: 150

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · nd2o3Tonnes: 150000000Grade: 320Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
nd2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6b31418d29d287438b45
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
150000000
Grade
320
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 320 ppm Nd2O3, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“320”

Context: 150

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · tb4o7Tonnes: 150000000Grade: 4Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Jupiter
Commodity
tb4o7
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6b31418d29d287438b45
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
150000000
Grade
4
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 4 ppm Tb4O7, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“4”

Context: 150

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · dy2o3Tonnes: 150000000Grade: 18Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
dy2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6b31418d29d287438b45
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
150000000
Grade
18
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 18 ppm Dy2O3, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“18”

Context: 150

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · y2o3Tonnes: 150000000Grade: 90Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
y2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6b31418d29d287438b45
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
150000000
Grade
90
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 90 ppm Y2O3, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“90”

Context: 150

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · sc2o3Tonnes: 150000000Grade: 46Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
sc2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6b31418d29d287438b45
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
150000000
Grade
46
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 46 ppm Sc2O3, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“46”

Context: 150

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · ga2o3Tonnes: 150000000Grade: 41Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
ga2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6b31418d29d287438b45
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
150000000
Grade
41
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 41 ppm Ga2O3, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“41”

Context: 150

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · iron_oreTonnes: 150000000Grade: 11Grade Unit: %View all details
Link to this fact

Identity

Project
Jupiter
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6b31418d29d287438b45
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
150000000
Grade
11
Grade Unit
%
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 150 Mt at 11% Fe, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“11”

Context: 150

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · treoTonnes: 100000000Grade: 1900Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
treo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:d836be94645f574fbb49
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
100000000
Grade
1900
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 1,900 ppm TREO, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“1,900”

Context: 100

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · magreoTonnes: 100000000Grade: 460Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
magreo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:d836be94645f574fbb49
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
100000000
Grade
460
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 460 ppm MagREO, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“460”

Context: 100

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · pr6o11Tonnes: 100000000Grade: 94Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
pr6o11
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:d836be94645f574fbb49
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
100000000
Grade
94
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 94 ppm Pr6O11, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“94”

Context: 100

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · nd2o3Tonnes: 100000000Grade: 340Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
nd2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:d836be94645f574fbb49
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
100000000
Grade
340
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 340 ppm Nd2O3, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“340”

Context: 100

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · tb4o7Tonnes: 100000000Grade: 4Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Jupiter
Commodity
tb4o7
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:d836be94645f574fbb49
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
100000000
Grade
4
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 4 ppm Tb4O7, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“4”

Context: 100

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · dy2o3Tonnes: 100000000Grade: 19Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
dy2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:d836be94645f574fbb49
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
100000000
Grade
19
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 19 ppm Dy2O3, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“19”

Context: 100

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · y2o3Tonnes: 100000000Grade: 94Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
y2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:d836be94645f574fbb49
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
100000000
Grade
94
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 94 ppm Y2O3, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“94”

Context: 100

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · sc2o3Tonnes: 100000000Grade: 49Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
sc2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:d836be94645f574fbb49
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
100000000
Grade
49
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 49 ppm Sc2O3, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“49”

Context: 100

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · ga2o3Tonnes: 100000000Grade: 42Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
ga2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:d836be94645f574fbb49
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
100000000
Grade
42
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 42 ppm Ga2O3, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“42”

Context: 100

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · iron_oreTonnes: 100000000Grade: 11Grade Unit: %View all details
Link to this fact

Identity

Project
Jupiter
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:d836be94645f574fbb49
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
100000000
Grade
11
Grade Unit
%
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a substantial Indicated Mineral Resource of 100 Mt at 11% Fe, demonstrating a high-grade component within the resource.

Positive factors

  • Significant indicated resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“11”

Context: 100

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · treoTonnes: 50000000Grade: 2100Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
treo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6e08dad0a79399730f21
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
50000000
Grade
2100
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 2,100 ppm TREO, indicating a valuable core within the resource.

Positive factors

  • High-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“2,100”

Context: 50

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · magreoTonnes: 50000000Grade: 520Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
magreo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6e08dad0a79399730f21
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
50000000
Grade
520
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 520 ppm MagREO, indicating a valuable core within the resource.

Positive factors

  • High-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“520”

Context: 50

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · pr6o11Tonnes: 50000000Grade: 110Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
pr6o11
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6e08dad0a79399730f21
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
50000000
Grade
110
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 110 ppm Pr6O11, indicating a valuable core within the resource.

Positive factors

  • High-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“110”

Context: 50

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · nd2o3Tonnes: 50000000Grade: 390Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
nd2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6e08dad0a79399730f21
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
50000000
Grade
390
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 390 ppm Nd2O3, indicating a valuable core within the resource.

Positive factors

  • High-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“390”

Context: 50

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · tb4o7Tonnes: 50000000Grade: 4Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Jupiter
Commodity
tb4o7
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6e08dad0a79399730f21
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
50000000
Grade
4
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 4 ppm Tb4O7, indicating a valuable core within the resource.

Positive factors

  • High-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“4”

Context: 50

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · dy2o3Tonnes: 50000000Grade: 20Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
dy2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6e08dad0a79399730f21
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
50000000
Grade
20
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 20 ppm Dy2O3, indicating a valuable core within the resource.

Positive factors

  • High-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“20”

Context: 50

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · y2o3Tonnes: 50000000Grade: 99Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
y2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6e08dad0a79399730f21
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
50000000
Grade
99
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 99 ppm Y2O3, indicating a valuable core within the resource.

Positive factors

  • High-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“99”

Context: 50

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · sc2o3Tonnes: 50000000Grade: 53Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
sc2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6e08dad0a79399730f21
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
50000000
Grade
53
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 53 ppm Sc2O3, indicating a valuable core within the resource.

Positive factors

  • High-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“53”

Context: 50

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · ga2o3Tonnes: 50000000Grade: 43Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
ga2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6e08dad0a79399730f21
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
50000000
Grade
43
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 43 ppm Ga2O3, indicating a valuable core within the resource.

Positive factors

  • High-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“43”

Context: 50

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · iron_oreTonnes: 50000000Grade: 12Grade Unit: %View all details
Link to this fact

Identity

Project
Jupiter
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:6e08dad0a79399730f21
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
50000000
Grade
12
Grade Unit
%
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Indicated Mineral Resource of 50 Mt at 12% Fe, indicating a valuable core within the resource.

Positive factors

  • High-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“12”

Context: 50

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · treoTonnes: 28000000Grade: 2300Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
treo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:c750537b891633d22737
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
28000000
Grade
2300
Grade Unit
ppm
Cutoff Grade
2000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 2,300 ppm TREO, highlighting a significant high-value component.

Positive factors

  • Very high-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“2,300”

Context: 28

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · magreoTonnes: 28000000Grade: 560Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
magreo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:c750537b891633d22737
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
28000000
Grade
560
Grade Unit
ppm
Cutoff Grade
2000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 560 ppm MagREO, highlighting a significant high-value component.

Positive factors

  • Very high-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“560”

Context: 28

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · pr6o11Tonnes: 28000000Grade: 120Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
pr6o11
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:c750537b891633d22737
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
28000000
Grade
120
Grade Unit
ppm
Cutoff Grade
2000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 120 ppm Pr6O11, highlighting a significant high-value component.

Positive factors

  • Very high-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“120”

Context: 28

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · nd2o3Tonnes: 28000000Grade: 420Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
nd2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:c750537b891633d22737
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
28000000
Grade
420
Grade Unit
ppm
Cutoff Grade
2000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 420 ppm Nd2O3, highlighting a significant high-value component.

Positive factors

  • Very high-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“420”

Context: 28

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · tb4o7Tonnes: 28000000Grade: 5Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
tb4o7
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:c750537b891633d22737
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
28000000
Grade
5
Grade Unit
ppm
Cutoff Grade
2000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 5 ppm Tb4O7, highlighting a significant high-value component.

Positive factors

  • Very high-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“5”

Context: 28

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · dy2o3Tonnes: 28000000Grade: 22Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
dy2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:c750537b891633d22737
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
28000000
Grade
22
Grade Unit
ppm
Cutoff Grade
2000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 22 ppm Dy2O3, highlighting a significant high-value component.

Positive factors

  • Very high-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“22”

Context: 28

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · y2o3Tonnes: 28000000Grade: 104Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
y2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:c750537b891633d22737
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
28000000
Grade
104
Grade Unit
ppm
Cutoff Grade
2000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 104 ppm Y2O3, highlighting a significant high-value component.

Positive factors

  • Very high-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“104”

Context: 28

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · sc2o3Tonnes: 28000000Grade: 56Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
sc2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:c750537b891633d22737
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
28000000
Grade
56
Grade Unit
ppm
Cutoff Grade
2000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 56 ppm Sc2O3, highlighting a significant high-value component.

Positive factors

  • Very high-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“56”

Context: 28

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · ga2o3Tonnes: 28000000Grade: 44Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
ga2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:c750537b891633d22737
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
28000000
Grade
44
Grade Unit
ppm
Cutoff Grade
2000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 44 ppm Ga2O3, highlighting a significant high-value component.

Positive factors

  • Very high-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“44”

Context: 28

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedJupiter · iron_oreTonnes: 28000000Grade: 12Grade Unit: %View all details
Link to this fact

Identity

Project
Jupiter
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:c750537b891633d22737
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
28000000
Grade
12
Grade Unit
%
Cutoff Grade
2000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very high-grade Indicated Mineral Resource of 28 Mt at 12% Fe, highlighting a significant high-value component.

Positive factors

  • Very high-grade indicated resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Evidence · table

“12”

Context: 28

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · treoTonnes: 2500000000Grade: 1300Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
treo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:89f456685f6e6768173c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
2500000000
Grade
1300
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 1,300 ppm TREO, indicating significant exploration potential.

Positive factors

  • Very large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“1,300”

Context: 2,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · magreoTonnes: 2500000000Grade: 290Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
magreo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:89f456685f6e6768173c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
2500000000
Grade
290
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 290 ppm MagREO, indicating significant exploration potential.

Positive factors

  • Very large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“290”

Context: 2,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · pr6o11Tonnes: 2500000000Grade: 62Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
pr6o11
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:89f456685f6e6768173c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
2500000000
Grade
62
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 62 ppm Pr6O11, indicating significant exploration potential.

Positive factors

  • Very large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“62”

Context: 2,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · nd2o3Tonnes: 2500000000Grade: 210Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
nd2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:89f456685f6e6768173c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
2500000000
Grade
210
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 210 ppm Nd2O3, indicating significant exploration potential.

Positive factors

  • Very large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“210”

Context: 2,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · tb4o7Tonnes: 2500000000Grade: 2Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
tb4o7
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:89f456685f6e6768173c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
2500000000
Grade
2
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 2 ppm Tb4O7, indicating significant exploration potential.

Positive factors

  • Very large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“2”

Context: 2,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · dy2o3Tonnes: 2500000000Grade: 11Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
dy2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:89f456685f6e6768173c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
2500000000
Grade
11
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 11 ppm Dy2O3, indicating significant exploration potential.

Positive factors

  • Very large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“11”

Context: 2,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · y2o3Tonnes: 2500000000Grade: 55Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
y2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:89f456685f6e6768173c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
2500000000
Grade
55
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 55 ppm Y2O3, indicating significant exploration potential.

Positive factors

  • Very large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“55”

Context: 2,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · sc2o3Tonnes: 2500000000Grade: 30Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
sc2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:89f456685f6e6768173c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
2500000000
Grade
30
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 30 ppm Sc2O3, indicating significant exploration potential.

Positive factors

  • Very large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“30”

Context: 2,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · ga2o3Tonnes: 2500000000Grade: 38Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
ga2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:89f456685f6e6768173c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
2500000000
Grade
38
Grade Unit
ppm
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 38 ppm Ga2O3, indicating significant exploration potential.

Positive factors

  • Very large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“38”

Context: 2,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · iron_oreTonnes: 2500000000Grade: 6.9Grade Unit: %View all details
Link to this fact

Identity

Project
Jupiter
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:89f456685f6e6768173c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
2500000000
Grade
6.9
Grade Unit
%
Cutoff Grade
400
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a very large Inferred Mineral Resource of 2.5 Bt at 6.9% Fe, indicating significant exploration potential.

Positive factors

  • Very large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“6.9”

Context: 2,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · treoTonnes: 1700000000Grade: 1600Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
treo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:2ec7232e17388cd640f1
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1700000000
Grade
1600
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 1,600 ppm TREO, indicating significant exploration potential.

Positive factors

  • Large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“1,600”

Context: 1,700

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · magreoTonnes: 1700000000Grade: 360Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
magreo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:2ec7232e17388cd640f1
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1700000000
Grade
360
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 360 ppm MagREO, indicating significant exploration potential.

Positive factors

  • Large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“360”

Context: 1,700

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · pr6o11Tonnes: 1700000000Grade: 77Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
pr6o11
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:2ec7232e17388cd640f1
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1700000000
Grade
77
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 77 ppm Pr6O11, indicating significant exploration potential.

Positive factors

  • Large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“77”

Context: 1,700

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · nd2o3Tonnes: 1700000000Grade: 270Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
nd2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:2ec7232e17388cd640f1
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1700000000
Grade
270
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 270 ppm Nd2O3, indicating significant exploration potential.

Positive factors

  • Large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“270”

Context: 1,700

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · tb4o7Tonnes: 1700000000Grade: 3Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
tb4o7
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:2ec7232e17388cd640f1
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1700000000
Grade
3
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 3 ppm Tb4O7, indicating significant exploration potential.

Positive factors

  • Large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“3”

Context: 1,700

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · dy2o3Tonnes: 1700000000Grade: 13Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
dy2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:2ec7232e17388cd640f1
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1700000000
Grade
13
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 13 ppm Dy2O3, indicating significant exploration potential.

Positive factors

  • Large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“13”

Context: 1,700

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · y2o3Tonnes: 1700000000Grade: 69Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
y2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:2ec7232e17388cd640f1
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1700000000
Grade
69
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 69 ppm Y2O3, indicating significant exploration potential.

Positive factors

  • Large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“69”

Context: 1,700

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · sc2o3Tonnes: 1700000000Grade: 35Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
sc2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:2ec7232e17388cd640f1
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1700000000
Grade
35
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 35 ppm Sc2O3, indicating significant exploration potential.

Positive factors

  • Large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“35”

Context: 1,700

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · ga2o3Tonnes: 1700000000Grade: 39Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
ga2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:2ec7232e17388cd640f1
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1700000000
Grade
39
Grade Unit
ppm
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 39 ppm Ga2O3, indicating significant exploration potential.

Positive factors

  • Large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“39”

Context: 1,700

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · iron_oreTonnes: 1700000000Grade: 7.3Grade Unit: %View all details
Link to this fact

Identity

Project
Jupiter
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:2ec7232e17388cd640f1
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1700000000
Grade
7.3
Grade Unit
%
Cutoff Grade
800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.7 Bt at 7.3% Fe, indicating significant exploration potential.

Positive factors

  • Large inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“7.3”

Context: 1,700

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · treoTonnes: 1500000000Grade: 1700Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
treo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:cef42186b7406c0b3713
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1500000000
Grade
1700
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 1,700 ppm TREO, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“1,700”

Context: 1,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · magreoTonnes: 1500000000Grade: 380Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
magreo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:cef42186b7406c0b3713
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1500000000
Grade
380
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 380 ppm MagREO, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“380”

Context: 1,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · pr6o11Tonnes: 1500000000Grade: 82Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
pr6o11
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:cef42186b7406c0b3713
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1500000000
Grade
82
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 82 ppm Pr6O11, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“82”

Context: 1,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · nd2o3Tonnes: 1500000000Grade: 280Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
nd2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:cef42186b7406c0b3713
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1500000000
Grade
280
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 280 ppm Nd2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“280”

Context: 1,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · tb4o7Tonnes: 1500000000Grade: 3Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
tb4o7
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:cef42186b7406c0b3713
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1500000000
Grade
3
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 3 ppm Tb4O7, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“3”

Context: 1,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · dy2o3Tonnes: 1500000000Grade: 14Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Jupiter
Commodity
dy2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:cef42186b7406c0b3713
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1500000000
Grade
14
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 14 ppm Dy2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“14”

Context: 1,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · y2o3Tonnes: 1500000000Grade: 72Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
y2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:cef42186b7406c0b3713
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1500000000
Grade
72
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 72 ppm Y2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“72”

Context: 1,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · sc2o3Tonnes: 1500000000Grade: 36Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
sc2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:cef42186b7406c0b3713
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1500000000
Grade
36
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 36 ppm Sc2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“36”

Context: 1,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · ga2o3Tonnes: 1500000000Grade: 40Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
ga2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:cef42186b7406c0b3713
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1500000000
Grade
40
Grade Unit
ppm
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 40 ppm Ga2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“40”

Context: 1,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · iron_oreTonnes: 1500000000Grade: 7.5Grade Unit: %View all details
Link to this fact

Identity

Project
Jupiter
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:cef42186b7406c0b3713
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1500000000
Grade
7.5
Grade Unit
%
Cutoff Grade
1000
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.5 Bt at 7.5% Fe, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“7.5”

Context: 1,500

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · treoTonnes: 1400000000Grade: 1700Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
treo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e2422974ea5b860b7aba
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1400000000
Grade
1700
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 1,700 ppm TREO, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“1,700”

Context: 1,400

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · magreoTonnes: 1400000000Grade: 400Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
magreo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e2422974ea5b860b7aba
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1400000000
Grade
400
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 400 ppm MagREO, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“400”

Context: 1,400

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · pr6o11Tonnes: 1400000000Grade: 85Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
pr6o11
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e2422974ea5b860b7aba
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1400000000
Grade
85
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 85 ppm Pr6O11, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“85”

Context: 1,400

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · nd2o3Tonnes: 1400000000Grade: 290Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
nd2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e2422974ea5b860b7aba
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1400000000
Grade
290
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 290 ppm Nd2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“290”

Context: 1,400

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · tb4o7Tonnes: 1400000000Grade: 3Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
tb4o7
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e2422974ea5b860b7aba
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1400000000
Grade
3
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 3 ppm Tb4O7, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“3”

Context: 1,400

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · dy2o3Tonnes: 1400000000Grade: 14Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Jupiter
Commodity
dy2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e2422974ea5b860b7aba
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1400000000
Grade
14
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 14 ppm Dy2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“14”

Context: 1,400

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · y2o3Tonnes: 1400000000Grade: 74Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
y2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e2422974ea5b860b7aba
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1400000000
Grade
74
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 74 ppm Y2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“74”

Context: 1,400

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · sc2o3Tonnes: 1400000000Grade: 37Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
sc2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e2422974ea5b860b7aba
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1400000000
Grade
37
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 37 ppm Sc2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“37”

Context: 1,400

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · ga2o3Tonnes: 1400000000Grade: 40Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
ga2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e2422974ea5b860b7aba
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1400000000
Grade
40
Grade Unit
ppm
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 40 ppm Ga2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“40”

Context: 1,400

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · iron_oreTonnes: 1400000000Grade: 7.7Grade Unit: %View all details
Link to this fact

Identity

Project
Jupiter
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:e2422974ea5b860b7aba
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1400000000
Grade
7.7
Grade Unit
%
Cutoff Grade
1200
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 1.4 Bt at 7.7% Fe, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“7.7”

Context: 1,400

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · treoTonnes: 900000000Grade: 1900Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
treo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:8e4e68b89c999806214c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
900000000
Grade
1900
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 1,900 ppm TREO, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“1,900”

Context: 900

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · magreoTonnes: 900000000Grade: 440Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
magreo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:8e4e68b89c999806214c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
900000000
Grade
440
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 440 ppm MagREO, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“440”

Context: 900

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · pr6o11Tonnes: 900000000Grade: 94Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
pr6o11
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:8e4e68b89c999806214c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
900000000
Grade
94
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 94 ppm Pr6O11, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“94”

Context: 900

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · nd2o3Tonnes: 900000000Grade: 330Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
nd2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:8e4e68b89c999806214c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
900000000
Grade
330
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 330 ppm Nd2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“330”

Context: 900

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · tb4o7Tonnes: 900000000Grade: 3Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
tb4o7
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:8e4e68b89c999806214c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
900000000
Grade
3
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 3 ppm Tb4O7, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“3”

Context: 900

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · dy2o3Tonnes: 900000000Grade: 16Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
dy2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:8e4e68b89c999806214c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
900000000
Grade
16
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 16 ppm Dy2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“16”

Context: 900

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · y2o3Tonnes: 900000000Grade: 80Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
y2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:8e4e68b89c999806214c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
900000000
Grade
80
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 80 ppm Y2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“80”

Context: 900

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · sc2o3Tonnes: 900000000Grade: 39Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
sc2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:8e4e68b89c999806214c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
900000000
Grade
39
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 39 ppm Sc2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“39”

Context: 900

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · ga2o3Tonnes: 900000000Grade: 41Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
ga2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:8e4e68b89c999806214c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
900000000
Grade
41
Grade Unit
ppm
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 41 ppm Ga2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“41”

Context: 900

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · iron_oreTonnes: 900000000Grade: 7.9Grade Unit: %View all details
Link to this fact

Identity

Project
Jupiter
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:8e4e68b89c999806214c
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
900000000
Grade
7.9
Grade Unit
%
Cutoff Grade
1500
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a large Inferred Mineral Resource of 900 Mt at 7.9% Fe, indicating significant exploration potential at a higher cut-off.

Positive factors

  • Large inferred resource tonnage at a higher cut-off grade
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“7.9”

Context: 900

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · treoTonnes: 460000000Grade: 2200Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
treo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:83ce36c8c959ad9f30a5
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
460000000
Grade
2200
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 2,200 ppm TREO, indicating significant exploration potential at a higher cut-off.

Positive factors

  • High-grade inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“2,200”

Context: 460

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · magreoTonnes: 460000000Grade: 500Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
magreo
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:83ce36c8c959ad9f30a5
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
460000000
Grade
500
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 500 ppm MagREO, indicating significant exploration potential at a higher cut-off.

Positive factors

  • High-grade inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“500”

Context: 460

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · pr6o11Tonnes: 460000000Grade: 110Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
pr6o11
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:83ce36c8c959ad9f30a5
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
460000000
Grade
110
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 110 ppm Pr6O11, indicating significant exploration potential at a higher cut-off.

Positive factors

  • High-grade inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“110”

Context: 460

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · nd2o3Tonnes: 460000000Grade: 370Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
nd2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:83ce36c8c959ad9f30a5
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
460000000
Grade
370
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 370 ppm Nd2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • High-grade inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“370”

Context: 460

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · tb4o7Tonnes: 460000000Grade: 4Grade Unit: ppmHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Jupiter
Commodity
tb4o7
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:83ce36c8c959ad9f30a5
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
460000000
Grade
4
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 4 ppm Tb4O7, indicating significant exploration potential at a higher cut-off.

Positive factors

  • High-grade inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“4”

Context: 460

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · dy2o3Tonnes: 460000000Grade: 17Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
dy2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:83ce36c8c959ad9f30a5
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
460000000
Grade
17
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 17 ppm Dy2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • High-grade inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“17”

Context: 460

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · y2o3Tonnes: 460000000Grade: 87Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
y2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:83ce36c8c959ad9f30a5
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
460000000
Grade
87
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 87 ppm Y2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • High-grade inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“87”

Context: 460

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · sc2o3Tonnes: 460000000Grade: 40Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
sc2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:83ce36c8c959ad9f30a5
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
460000000
Grade
40
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 40 ppm Sc2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • High-grade inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“40”

Context: 460

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredJupiter · ga2o3Tonnes: 460000000Grade: 42Grade Unit: ppmView all details
Link to this fact

Identity

Project
Jupiter
Commodity
ga2o3
Region
australia_wa
Reported Region
Western Australia
Ticker
CRI

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dr Stuart Owen, Dr Natalee Bonnici, Mr Rodney Brown
Resource group id
resource:83ce36c8c959ad9f30a5
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
460000000
Grade
42
Grade Unit
ppm
Cutoff Grade
1800
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-10-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project reports a high-grade Inferred Mineral Resource of 460 Mt at 42 ppm Ga2O3, indicating significant exploration potential at a higher cut-off.

Positive factors

  • High-grade inferred resource tonnage
  • JORC 2012 compliant estimate with QP sign-off

Negative factors

  • Inferred category has low geological confidence

Evidence · table

“42”

Context: 460

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Metallurgical Results (10)

Fact 1Mt Lindsay · tinRecovery: 75 %View all details
Link to this fact

Identity

Project
Mt Lindsay
Commodity
tin
Ticker
CRI

Test Work

Program Status
scoping
Processing Route
conventional flowsheet

Recovery

Recovery
75 %
Recovery Basis
unspecified

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Mt Lindsay Scoping Study assumes a 75% tin recovery for its conventional flowsheet, which is a reasonable target for a scoping study, though not yet demonstrated in integrated testwork.

Positive factors

  • Recovery is part of a conventional flowsheet

Negative factors

  • Recoveries not simultaneously demonstrated in a single integrated locked-cycle test program
  • Recovery basis unspecified

Evidence · text

“Base Case processing recoveries of 75% tin, 85% WO₃ and 98% magnetite are modestly above recoveries demonstrated or estimated in individual historical testwork programs and have not all been demonstrated simultaneously in a single integrated locked-cycle test program.”
Fact 2Mt Lindsay · tungstenRecovery: 85 %View all details
Link to this fact

Identity

Project
Mt Lindsay
Commodity
tungsten
Ticker
CRI

Test Work

Program Status
scoping
Processing Route
conventional flowsheet

Recovery

Recovery
85 %
Recovery Basis
unspecified

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Mt Lindsay Scoping Study assumes an 85% tungsten recovery for its conventional flowsheet, which is a reasonable target for a scoping study, though not yet demonstrated in integrated testwork.

Positive factors

  • Recovery is part of a conventional flowsheet

Negative factors

  • Recoveries not simultaneously demonstrated in a single integrated locked-cycle test program
  • Recovery basis unspecified

Evidence · text

“Base Case processing recoveries of 75% tin, 85% WO₃ and 98% magnetite are modestly above recoveries demonstrated or estimated in individual historical testwork programs and have not all been demonstrated simultaneously in a single integrated locked-cycle test program.”
Fact 3Mt Lindsay · magnetiteRecovery: 98 %View all details
Link to this fact

Identity

Project
Mt Lindsay
Commodity
magnetite
Ticker
CRI

Test Work

Program Status
scoping
Processing Route
conventional flowsheet

Recovery

Recovery
98 %
Recovery Basis
unspecified

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Mt Lindsay Scoping Study assumes a 98% magnetite recovery for its conventional flowsheet, which is a reasonable target for a scoping study, though not yet demonstrated in integrated testwork.

Positive factors

  • Recovery is part of a conventional flowsheet

Negative factors

  • Recoveries not simultaneously demonstrated in a single integrated locked-cycle test program
  • Recovery basis unspecified

Evidence · text

“Base Case processing recoveries of 75% tin, 85% WO₃ and 98% magnetite are modestly above recoveries demonstrated or estimated in individual historical testwork programs and have not all been demonstrated simultaneously in a single integrated locked-cycle test program.”
Fact 4Jupiter · rare_earthsRecovery: 58 %View all details
Link to this fact

Identity

Project
Jupiter
Commodity
rare_earths
Ticker
CRI

Test Work

Program Status
scoping
Processing Route
Beneficiation + Hydrometallurgical

Recovery

Recovery
58 %
Recovery Basis
theoretical

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter Scoping Study models an overall TREO recovery of 58% for its beneficiation and hydrometallurgical flowsheet, which is a key assumption for the project's economics.

Positive factors

  • Overall recovery for the proposed flowsheet
  • Beneficiation first approach reduces downstream processing volume

Negative factors

  • Recovery is modelled, not yet fully demonstrated in integrated testwork

Evidence · text

“The Base Case financial model adopts approximately 58% overall TREO recovery, comprising 69% beneficiation recovery and approximately 84% downstream hydrometallurgical recovery, compared with Sedgman’s approximately 63% overall process design basis.”

Tags used in scoring

Theoretical Recovery Onlynegative

Only theoretical or liberation-derived recovery reported, with no actual test result.

Why it applies: recovery_basis is theoretical

Fact 5Jupiter · rare_earthsRecovery: 69 %View all details
Link to this fact

Identity

Project
Jupiter
Commodity
rare_earths
Ticker
CRI

Test Work

Program Status
scoping
Processing Route
Beneficiation

Recovery

Recovery
69 %
Recovery Basis
actual_test

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter Scoping Study assumes a 69% beneficiation recovery, which is a critical step in reducing the mass requiring downstream chemical processing.

Positive factors

  • Beneficiation recovery is a key step in the flowsheet
  • High mass rejection before hydrometallurgy

Evidence · text

“The Base Case financial model adopts approximately 58% overall TREO recovery, comprising 69% beneficiation recovery and approximately 84% downstream hydrometallurgical recovery, compared with Sedgman’s approximately 63% overall process design basis.”
Fact 6Jupiter · rare_earthsRecovery: 84 %View all details
Link to this fact

Identity

Project
Jupiter
Commodity
rare_earths
Ticker
CRI

Test Work

Program Status
scoping
Processing Route
Hydrometallurgical

Recovery

Recovery
84 %
Recovery Basis
actual_test

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter Scoping Study assumes an 84% downstream hydrometallurgical recovery, contributing to the overall TREO recovery.

Positive factors

  • Hydrometallurgical recovery is a key step in the flowsheet

Evidence · text

“The Base Case financial model adopts approximately 58% overall TREO recovery, comprising 69% beneficiation recovery and approximately 84% downstream hydrometallurgical recovery, compared with Sedgman’s approximately 63% overall process design basis.”
Fact 7Jupiter · rare_earthsView all details
Link to this fact

Identity

Project
Jupiter
Commodity
rare_earths
Ticker
CRI

Test Work

Program Status
scoping
Processing Route
Beneficiation + Hydrometallurgical

Recovery

Conc. Grade
58
Conc. Grade Unit
% TREO

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project targets a high-grade Mixed Rare Earth Carbonate (MREC) product with approximately 58% TREO, which is a key output for downstream separation.

Positive factors

  • High-grade MREC product is targeted
  • Magnet rare earth exposure (Nd, Pr, Dy, Tb)

Evidence · text

“MIXED RARE EARTH CARBONATE ~58% TREO Modelled MREC product grade”
Fact 8Jupiter · rare_earthsView all details
Link to this fact

Identity

Project
Jupiter
Commodity
rare_earths
Ticker
CRI

Test Work

Program Status
scoping
Processing Route
Beneficiation + Hydrometallurgical

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: The Jupiter project aims for a substantial LOM average production of approximately 8,300 tpa of contained TREO in MREC, indicating a large-scale operation.

Positive factors

  • Significant LOM average production of contained TREO in MREC

Evidence · text

“LOM AVERAGE PRODUCTION ~8,300 tpa Contained TREO in MREC”
Fact 9Jupiter · rare_earthsView all details
Link to this fact

Identity

Project
Jupiter
Commodity
rare_earths
Ticker
CRI

Test Work

Program Status
optimization
Sample
Latest MREO sample

Recovery

Conc. Grade
98.2
Conc. Grade Unit
% TREO

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: Critica has produced a high-purity Mixed Rare Earth Oxide (MREO) sample grading 98.2% TREO, which is a significant step towards product qualification and off-take agreements.

Positive factors

  • Very high purity rare earth product achieved
  • Sample available for customer evaluation and qualification
  • Includes magnet rare earths (Nd, Pr, Dy, Tb) and Yttrium

Evidence · text

“Latest MREO sample: 98.2% TREO, including 28.4% MagREO/TREO.”
Fact 10Jupiter · iron_oreView all details
Link to this fact

Identity

Project
Jupiter
Commodity
iron_ore
Ticker
CRI

Test Work

Program Status
optimization
Sample
Iron concentrate sample

Recovery

Conc. Grade
64.1
Conc. Grade Unit
% Fe

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-20T00:00:00.000Z

Reasoning: A high-grade magnetite concentrate sample of 64.1% Fe has been produced, indicating potential for an iron by-product, although it is not yet included in the project's base case economics.

Positive factors

  • High-grade magnetite concentrate sample produced
  • Potential future by-product revenue stream

Negative factors

  • No iron revenue included in the Scoping Study Base Case

Evidence · text

“Iron concentrate sample: 64.1% Fe.”

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.