Colibri Intersects 7.5 m of 2.92 g/t Gold and 30 m of 0.73 g/t Gold from Near Surface in Maiden Drill Program at the Plomo Claims, EP Gold Project, Sonora, Mexico
Original announcement by yahoo_press on
- Company
- Colibri Resource Corporation
- Ticker
- CBI
- Exchange
- LSE
- Region
- Sonora, Mexico
- Primary commodity
- Gold
- Secondary commodities
- None reported
- Document categories
- Drill results
- Extracted
- 2026-08-21 01:11:58 UTC
Analysis by Minestarters Atlas
Minestarters Atlas analysis
Summary
Colibri Resource Corporation has reported assay results from its maiden Phase 1 reconnaissance RC drill program at the Plomo claims within the EP Gold Project in Sonora, Mexico. The program intersected gold at near-surface depths.
Reasoning: Maiden reconnaissance RC drilling at a new project (EP Gold Project) reporting gold intercepts from near-surface.
Positive factors
- maiden drill program
- near surface intercepts
Facts used in scoring: 2

Classification and evidence
Step-Out Extensionpositive
Mineralization extended beyond the previously known limit.
Why it applies: Maiden reconnaissance program testing new ground in the Caborca Gold Belt.
Evidence · text
“maiden Phase 1 reconnaissance reverse circulation ("RC") drill program”
Extracted facts
Stored fact records: 2. Some facts used in scoring do not have a stored record.
Drill Results (2)
Fact 1EP Gold Project · goldGrade: 2.92Grade Unit: g/tIntercept: 7.5 mNeeds review: ungroundedView all detailsHide details
Identity
- Project
- EP Gold Project
- Commodity
- gold
- Region
- mexico
- Reported Region
- Sonora, Mexico
- Ticker
- CBI
Geometry
- Grade
- 2.92
- Grade Unit
- g/t
- Intercept
- 7.5 m
Classification
- Program
- exploration
- Sample Type
- drill
Review
- Needs Review
- Yes
- Review Reason
- ungrounded
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-03-13T00:00:00.000Z
Reasoning: 2.92 g/t gold intercept in a maiden reconnaissance program.
Positive factors
- strong grade for reconnaissance
Evidence · text
“7.5 m of 2.92 g/t Gold”
Fact 2EP Gold Project · goldGrade: 0.73Grade Unit: g/tIntercept: 30 mNeeds review: ungroundedView all detailsHide details
Identity
- Project
- EP Gold Project
- Commodity
- gold
- Region
- mexico
- Reported Region
- Sonora, Mexico
- Ticker
- CBI
Geometry
- Grade
- 0.73
- Grade Unit
- g/t
- Intercept
- 30 m
Classification
- Program
- exploration
- Sample Type
- drill
Review
- Needs Review
- Yes
- Review Reason
- ungrounded
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-03-13T00:00:00.000Z
Reasoning: 30m wide intercept at 0.73 g/t gold demonstrates continuity/scale.
Positive factors
- significant width
Evidence · text
“30 m of 0.73 g/t Gold”
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.