CKA: FY2026 Annual Report

Original announcement by asx on

Company
COKAL LIMITED
Ticker
CKA
Exchange
ASX
Region
Central Kalimantan, Indonesia
Primary commodity
Coal
Secondary commodities
None reported
Document categories
Resource update
Extracted
2026-09-30 08:23:29 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Cokal Limited's 2026 Annual Report confirms a stable Mineral Resource of 260.1 Mt and Ore Reserve of 22.98 Mt for its BBM metallurgical coal project, compliant with JORC 2012. The figures show minimal change from the prior year, primarily reflecting mining depletion. However, the report notably omits grade disclosure for these estimates. The company faces significant financial challenges, including net liabilities and a going concern warning, exacerbated by operational delays due to regulatory changes in Indonesia, despite an extended debt maturity.

Reasoning: The annual report confirms a stable JORC-compliant resource and reserve base for the BBM project, with minor depletion from mining. While the resource base is substantial, the critical omission of grade disclosure, combined with the company's net liability position, going concern warning, and ongoing operational delays due to regulatory issues, results in a negative overall outlook.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Substantial Resource Base
  • Debt Maturity Extended

Negative factors

  • No Grade Disclosure
  • Significant Inferred Component
  • Net Liability Position
  • Going Concern Warning
  • Operational Delays

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 5

Classification and evidence

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: The report explicitly states a 'Measured' category for the Mineral Resource, indicating a high level of geological confidence.

Evidence · table

“Measured”

Context: 18.7

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The report explicitly states an 'Indicated' category for the Mineral Resource, indicating a reasonable level of geological confidence.

Evidence · table

“Indicated”

Context: 22.9

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: A significant portion of the Mineral Resource is classified as 'Inferred', which is a speculative category with limited geological confidence.

Evidence · table

“Inferred”

Context: 218.5

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The report explicitly states a 'Proven' category for the Ore Reserve, indicating a high level of economic viability and confidence.

Evidence · table

“13.68”

Context: Proven

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The report explicitly states a 'Probable' category for the Ore Reserve, indicating a reasonable level of economic viability and confidence.

Evidence · table

“9.3”

Context: Probable

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The Mineral Resources and Ore Reserves are signed off by Mr Luki Wilianto and Mr Arie Cahyono, both members of AusIMM and employees of Cokal, qualifying them as Competent Persons under JORC.

Evidence · text

“Mr Arie Cahyono is a Competent Person and a member of the Australasian Institute of Mining and Metallurgy and an employee of the Company. Mr Wilianto, who is a Member of The Australian Institute Mining and Metallurgy (AusIMM) and is a full-time employee of Cokal.”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Mineral Resources and Ore Reserves are reported in accordance with the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' (JORC Code 2012).

Evidence · text

“prepared in accordance with the 2012 Edition of the “Australasian Code for reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC Code 2012)”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document presents an annual update to the company's Mineral Resources and Ore Reserves.

Evidence · text

“Annual Mineral Resources Statement”

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: The Ore Reserves show a minor annual decline of 0.13% and Mineral Resources show a decline of 0.03 Mt, indicating depletion from mining.

Evidence · table

“(0.03) (0.13)”

Context: Annual change

No Grade Disclosurenegative · Story-specific tag

No canonical definition is currently available.

Why it applies: The tables for both Ore Reserves and Mineral Resources report tonnage by category but do not provide corresponding grade values, which is a critical omission for assessing the quality of the resource.

Evidence · table

“Ore Reserves as at 30 June 2026”

Context: 2026 Reserves (in-situ) - Mt

Extracted facts

Stored fact records: 5. Some facts used in scoring do not have a stored record.

Resource Estimates (5)

provenBBM · coalTonnes: 13680000View all details
Link to this fact

Identity

Project
BBM
Commodity
coal
Region
indonesia
Reported Region
Central Kalimantan, Indonesia
Ticker
CKA

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Arie Cahyono
Resource group id
resource:dfb4bafca5463f3e8adb
Mining method
combined
Ownership percent
60 %
Resource basis
gross

Resource Data

Category
proven
Tonnes
13680000

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
13710000

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The Proven Reserve for BBM shows a minor tonnage decline due to mining depletion, with no grade information provided. It is JORC compliant and signed by a Competent Person.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • No Grade Disclosure
  • Minor Tonnage Decline

Evidence · table

“13.68”

Context: Proven

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 13680000 against 13710000 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableBBM · coalTonnes: 9300000View all details
Link to this fact

Identity

Project
BBM
Commodity
coal
Region
indonesia
Reported Region
Central Kalimantan, Indonesia
Ticker
CKA

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Arie Cahyono
Resource group id
resource:b5aaac47d3d507277391
Mining method
combined
Ownership percent
60 %
Resource basis
gross

Resource Data

Category
probable
Tonnes
9300000

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
9300000

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The Probable Reserve for BBM remains stable with no tonnage growth and no grade information provided. It is JORC compliant and signed by a Competent Person.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • No Grade Disclosure
  • No Tonnage Growth

Evidence · table

“9.3”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredBBM · coalTonnes: 18700000View all details
Link to this fact

Identity

Project
BBM
Commodity
coal
Region
indonesia
Reported Region
Central Kalimantan, Indonesia
Ticker
CKA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Luki Wilianto
Resource group id
resource:8f4fd1b3ec0829b5eedf
Mining method
combined
Ownership percent
60 %
Resource basis
gross

Resource Data

Category
measured
Tonnes
18700000

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
18700000

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The Measured Resource for BBM remains stable with no tonnage growth and no grade information provided. It is JORC compliant and signed by a Competent Person.

Positive factors

  • QP/CP Signed
  • JORC Compliant
  • High Confidence Category

Negative factors

  • No Grade Disclosure
  • No Tonnage Growth

Evidence · table

“18.7”

Context: Measured

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedBBM · coalTonnes: 22900000View all details
Link to this fact

Identity

Project
BBM
Commodity
coal
Region
indonesia
Reported Region
Central Kalimantan, Indonesia
Ticker
CKA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Luki Wilianto
Resource group id
resource:1bc3d6cde786fc087f40
Mining method
combined
Ownership percent
60 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
22900000

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
22900000

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The Indicated Resource for BBM remains stable with no tonnage growth and no grade information provided. It is JORC compliant and signed by a Competent Person.

Positive factors

  • QP/CP Signed
  • JORC Compliant
  • Moderate Confidence Category

Negative factors

  • No Grade Disclosure
  • No Tonnage Growth

Evidence · table

“22.9”

Context: Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredBBM · coalTonnes: 218500000View all details
Link to this fact

Identity

Project
BBM
Commodity
coal
Region
indonesia
Reported Region
Central Kalimantan, Indonesia
Ticker
CKA

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Luki Wilianto
Resource group id
resource:b41c1ec8421e42e3f0ca
Mining method
combined
Ownership percent
60 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
218500000

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
218500000

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The Inferred Resource for BBM remains stable with no tonnage growth and no grade information provided. While JORC compliant and signed by a Competent Person, the Inferred category represents lower geological confidence.

Positive factors

  • QP/CP Signed
  • JORC Compliant
  • Large Tonnage

Negative factors

  • No Grade Disclosure
  • No Tonnage Growth
  • Low Confidence Category

Evidence · table

“218.5”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.