CHN: Annual Report to Shareholders
Original announcement by asx on
- Company
- Chalice Mining Limited
- Ticker
- CHN
- Exchange
- ASX
- Region
- Western Australia
- Primary commodity
- Palladium
- Secondary commodities
- Platinum, Gold, Nickel, Copper, Cobalt, Rare earth elements, Silver
- Document categories
- Resource update, Permitting, Drill results
- Extracted
- 2026-09-29 14:25:10 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Chalice Mining Limited's Annual Report for 2026 details robust Pre-Feasibility Study results for its Gonneville PGM-Nickel-Copper-Cobalt Project, confirming strong economics and a maiden Ore Reserve. The company is progressing towards a Final Investment Decision in H1 CY28, with significant advancements in regulatory approvals and the Feasibility Study. Additionally, new high-grade rare earth element rock chip samples were reported from the Deep Blue target within the Northam Project.
Reasoning: The annual report highlights strong Pre-Feasibility Study results for the Gonneville PGM-Nickel-Copper-Cobalt Project, including a maiden Ore Reserve and significant progress towards a Final Investment Decision. New exploration results at the Deep Blue target also show high-grade rare earth elements.
Positive factors
- PFS confirms robust economics with A$1.4bn NPV8% and 23% IRR (pre-tax)
- Maiden Ore Reserve of 260Mt defined for Gonneville Project
- Gonneville projected to be the lowest cost PGM mine in the western world
- Significant progress on regulatory approvals and Feasibility Study
- New high-grade rare earth element rock chip samples at Deep Blue target
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 76
Classification and evidence
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: The document provides an updated Mineral Resource Estimate for the Gonneville Project.
Evidence · text
“Mineral Resources and Ore Reserves”
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: The Gonneville Mineral Resource Estimate includes a Measured category for various commodities.
Evidence · table
“MEASURED”
Context: 2.9
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: The Gonneville Mineral Resource Estimate includes an Indicated category for various commodities.
Evidence · table
“INDICATED”
Context: 400
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The Gonneville Mineral Resource Estimate includes an Inferred category for various commodities.
Evidence · table
“INFERRED”
Context: 250
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The document reports a maiden Ore Reserve for Gonneville, including a Proved category.
Evidence · table
“PROVED”
Context: 2.5
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The document reports a maiden Ore Reserve for Gonneville, including a Probable category.
Evidence · table
“PROBABLE”
Context: 260
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: Both the Mineral Resource and Ore Reserve Estimates are reported in accordance with the JORC Code (2012).
Evidence · text
“The Resource underpinning the production targets in the Study has been prepared by a Competent Person and reported in accordance with the requirements of the JORC Code (2012).”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Competent Persons Mike Millad, Mike Job, and Dan Donald are named and have signed off on the estimates.
Evidence · text
“The information in this Annual Report that relates to Mineral Resources in relation to the Gonneville PGM-Ni-Cu-Co Project is based on and fairly represents information and supporting documentation compiled by Mike Millad and Mike Job.”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: The cut-off grades for the Mineral Resource Estimate are clearly stated.
Evidence · text
“Resources reported above a pit constrained cut-off of A$25/t NSR and underground MSO cut-off of A$110/t NSR”
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: Rock chip samples at Deep Blue show highly anomalous TREO grades up to 19.26%.
Evidence · table
“19.26”
Context: CFR501
Extracted facts
Stored fact records: 76. Some facts used in scoring do not have a stored record.
Drill Results (18)
Fact 1Northam · rare earth elementsGrade: 19.26Grade Unit: %View all detailsHide details
Identity
- Project
- Northam
- Commodity
- rare earth elements
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 19.26
- Grade Unit
- %
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: High-grade TREO rock chip sample from a newly defined target.
Positive factors
- High TREO grade
- New target definition
Evidence · table
“19.26”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 2Northam · lanthanumGrade: 4.52Grade Unit: %View all detailsHide details
Identity
- Project
- Northam
- Commodity
- lanthanum
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 4.52
- Grade Unit
- %
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: High-grade lanthanum rock chip sample from a newly defined target.
Positive factors
- High grade
- New target definition
Evidence · table
“4.52”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 3Northam · ceriumGrade: 8.56Grade Unit: %View all detailsHide details
Identity
- Project
- Northam
- Commodity
- cerium
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 8.56
- Grade Unit
- %
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: High-grade cerium rock chip sample from a newly defined target.
Positive factors
- High grade
- New target definition
Evidence · table
“8.56”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 4Northam · praseodymiumGrade: 10000Grade Unit: ppmView all detailsHide details
Identity
- Project
- Northam
- Commodity
- praseodymium
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 10000
- Grade Unit
- ppm
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: High-grade praseodymium rock chip sample from a newly defined target.
Positive factors
- High grade
- New target definition
Evidence · table
“10,000”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 5Northam · neodymiumGrade: 35500Grade Unit: ppmView all detailsHide details
Identity
- Project
- Northam
- Commodity
- neodymium
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 35500
- Grade Unit
- ppm
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: High-grade neodymium rock chip sample from a newly defined target.
Positive factors
- High grade
- New target definition
Evidence · table
“35,500”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 6Northam · samariumGrade: 6000Grade Unit: ppmView all detailsHide details
Identity
- Project
- Northam
- Commodity
- samarium
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 6000
- Grade Unit
- ppm
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: High-grade samarium rock chip sample from a newly defined target.
Positive factors
- High grade
- New target definition
Evidence · table
“6,000”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 7Northam · europiumGrade: 1400Grade Unit: ppmView all detailsHide details
Identity
- Project
- Northam
- Commodity
- europium
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 1400
- Grade Unit
- ppm
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: High-grade europium rock chip sample from a newly defined target.
Positive factors
- High grade
- New target definition
Evidence · table
“1,400”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 8Northam · gadoliniumGrade: 2900Grade Unit: ppmView all detailsHide details
Identity
- Project
- Northam
- Commodity
- gadolinium
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 2900
- Grade Unit
- ppm
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: High-grade gadolinium rock chip sample from a newly defined target.
Positive factors
- High grade
- New target definition
Evidence · table
“2,900”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 9Northam · terbiumGrade: 300Grade Unit: ppmView all detailsHide details
Identity
- Project
- Northam
- Commodity
- terbium
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 300
- Grade Unit
- ppm
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: High-grade terbium rock chip sample from a newly defined target.
Positive factors
- High grade
- New target definition
Evidence · table
“300”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 10Northam · dysprosiumGrade: 1000Grade Unit: ppmView all detailsHide details
Identity
- Project
- Northam
- Commodity
- dysprosium
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 1000
- Grade Unit
- ppm
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: High-grade dysprosium rock chip sample from a newly defined target.
Positive factors
- High grade
- New target definition
Evidence · table
“1,000”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 11Northam · holmiumGrade: 400Grade Unit: ppmView all detailsHide details
Identity
- Project
- Northam
- Commodity
- holmium
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 400
- Grade Unit
- ppm
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: High-grade holmium rock chip sample from a newly defined target.
Positive factors
- High grade
- New target definition
Evidence · table
“400”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 12Northam · ytterbiumGrade: 300Grade Unit: ppmView all detailsHide details
Identity
- Project
- Northam
- Commodity
- ytterbium
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 300
- Grade Unit
- ppm
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: High-grade ytterbium rock chip sample from a newly defined target.
Positive factors
- High grade
- New target definition
Evidence · table
“300”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 13Northam · yttriumGrade: 3800Grade Unit: ppmView all detailsHide details
Identity
- Project
- Northam
- Commodity
- yttrium
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 3800
- Grade Unit
- ppm
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: High-grade yttrium rock chip sample from a newly defined target.
Positive factors
- High grade
- New target definition
Evidence · table
“3,800”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 14Northam · copperGrade: 377Grade Unit: ppmView all detailsHide details
Identity
- Project
- Northam
- Commodity
- copper
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 377
- Grade Unit
- ppm
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Copper rock chip sample from a newly defined target.
Positive factors
- New target definition
Evidence · table
“377”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 15Northam · goldGrade: 0.13Grade Unit: g/tView all detailsHide details
Identity
- Project
- Northam
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 0.13
- Grade Unit
- g/t
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Gold rock chip sample from a newly defined target.
Positive factors
- New target definition
Evidence · table
“0.130”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 16Northam · silverGrade: 0.3Grade Unit: g/tView all detailsHide details
Identity
- Project
- Northam
- Commodity
- silver
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 0.3
- Grade Unit
- g/t
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Silver rock chip sample from a newly defined target.
Positive factors
- New target definition
Evidence · table
“0.3”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 17Northam · erbiumGrade: 100Grade Unit: ppmView all detailsHide details
Identity
- Project
- Northam
- Commodity
- erbium
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 100
- Grade Unit
- ppm
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: High-grade erbium rock chip sample from a newly defined target.
Positive factors
- High grade
- New target definition
Evidence · table
“100”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 18Northam · thuliumGrade: 100Grade Unit: ppmView all detailsHide details
Identity
- Project
- Northam
- Commodity
- thulium
- Region
- australia_wa
- Reported Region
- australia_wa
- Ticker
- CHN
Geometry
- Grade
- 100
- Grade Unit
- ppm
Classification
- Sample Type
- surface
Location
- Location
- Deep Blue Target
- Loc. Confidence
- medium
- Loc. Source
- document
QA/QC
- QA/QC Methods
- standards
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: High-grade thulium rock chip sample from a newly defined target.
Positive factors
- High grade
- New target definition
Evidence · table
“100”
Context: CFR501
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Resource Estimates (58)
indicatedGonneville · palladiumTonnes: 7000000Grade: 0.43Grade Unit: mozContained Metal: 0.43Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- palladium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:48b46a997c21a5b58888
- Deposit or zone
- Oxide – in-pit
Resource Data
- Category
- indicated
- Tonnes
- 7000000
- Grade
- 0.43
- Grade Unit
- moz
- Contained Metal
- 0.43
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Indicated resource for palladium in oxide material at a good grade.
Positive factors
- Indicated category provides good confidence
- High palladium grade for oxide material
Evidence · table
“0.43”
Context: 7.0
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
indicatedGonneville · goldTonnes: 7000000Grade: 0.01Grade Unit: mozContained Metal: 0.01Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:48b46a997c21a5b58888
- Deposit or zone
- Oxide – in-pit
Resource Data
- Category
- indicated
- Tonnes
- 7000000
- Grade
- 0.01
- Grade Unit
- moz
- Contained Metal
- 0.01
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Indicated resource for gold in oxide material, though at a low grade.
Positive factors
- Indicated category provides good confidence
Evidence · table
“0.01”
Context: 7.0
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · palladiumTonnes: 6100000Grade: 0.11Grade Unit: mozContained Metal: 0.11Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- palladium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:4eb17a06f4b754540207
- Deposit or zone
- Oxide – in-pit
Resource Data
- Category
- inferred
- Tonnes
- 6100000
- Grade
- 0.11
- Grade Unit
- moz
- Contained Metal
- 0.11
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Inferred resource for palladium in oxide material.
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.11”
Context: 6.1
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · goldTonnes: 6100000Grade: 0.01Grade Unit: mozContained Metal: 0.01Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:4eb17a06f4b754540207
- Deposit or zone
- Oxide – in-pit
Resource Data
- Category
- inferred
- Tonnes
- 6100000
- Grade
- 0.01
- Grade Unit
- moz
- Contained Metal
- 0.01
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Inferred resource for gold in oxide material at a very low grade.
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.01”
Context: 6.1
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
measuredGonneville · palladiumTonnes: 400000Grade: 0.01Grade Unit: mozContained Metal: 0.01Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- palladium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:41d8a218c4267ac0b9e0
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- measured
- Tonnes
- 400000
- Grade
- 0.01
- Grade Unit
- moz
- Contained Metal
- 0.01
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Measured resource for palladium in transitional sulphide material.
Positive factors
- Measured category provides high geological confidence
Evidence · table
“0.01”
Context: 0.4
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
measuredGonneville · platinumTonnes: 400000Grade: 0Grade Unit: mozContained Metal: 0Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- platinum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:41d8a218c4267ac0b9e0
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- measured
- Tonnes
- 400000
- Grade
- 0
- Grade Unit
- moz
- Contained Metal
- 0
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Measured resource for platinum in transitional sulphide material.
Positive factors
- Measured category provides high geological confidence
Evidence · table
“0.00”
Context: 0.4
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
measuredGonneville · goldTonnes: 400000Grade: 0Grade Unit: mozContained Metal: 0Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:41d8a218c4267ac0b9e0
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- measured
- Tonnes
- 400000
- Grade
- 0
- Grade Unit
- moz
- Contained Metal
- 0
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Measured resource for gold in transitional sulphide material.
Positive factors
- Measured category provides high geological confidence
Evidence · table
“0.00”
Context: 0.4
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
measuredGonneville · nickelTonnes: 400000Grade: 0.19Grade Unit: %Contained Metal: 0.67Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- nickel
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:41d8a218c4267ac0b9e0
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- measured
- Tonnes
- 400000
- Grade
- 0.19
- Grade Unit
- %
- Contained Metal
- 0.67
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Measured resource for nickel in transitional sulphide material.
Positive factors
- Measured category provides high geological confidence
Evidence · table
“0.19”
Context: 0.4
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
measuredGonneville · copperTonnes: 400000Grade: 0.16Grade Unit: %Contained Metal: 0.56Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- copper
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:41d8a218c4267ac0b9e0
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- measured
- Tonnes
- 400000
- Grade
- 0.16
- Grade Unit
- %
- Contained Metal
- 0.56
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Measured resource for copper in transitional sulphide material.
Positive factors
- Measured category provides high geological confidence
Evidence · table
“0.160”
Context: 0.4
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
measuredGonneville · cobaltTonnes: 400000Grade: 0.02Grade Unit: %Contained Metal: 0.07Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- cobalt
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:41d8a218c4267ac0b9e0
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- measured
- Tonnes
- 400000
- Grade
- 0.02
- Grade Unit
- %
- Contained Metal
- 0.07
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Measured resource for cobalt in transitional sulphide material.
Positive factors
- Measured category provides high geological confidence
Evidence · table
“0.020”
Context: 0.4
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
indicatedGonneville · palladiumTonnes: 14000000Grade: 0.3Grade Unit: mozContained Metal: 0.3Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- palladium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:fa9c6abc4007d273e728
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- indicated
- Tonnes
- 14000000
- Grade
- 0.3
- Grade Unit
- moz
- Contained Metal
- 0.3
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Indicated resource for palladium in transitional sulphide material.
Positive factors
- Indicated category provides good confidence
Evidence · table
“0.30”
Context: 14
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
indicatedGonneville · platinumTonnes: 14000000Grade: 0.07Grade Unit: mozContained Metal: 0.07Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- platinum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:fa9c6abc4007d273e728
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- indicated
- Tonnes
- 14000000
- Grade
- 0.07
- Grade Unit
- moz
- Contained Metal
- 0.07
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Indicated resource for platinum in transitional sulphide material.
Positive factors
- Indicated category provides good confidence
Evidence · table
“0.07”
Context: 14
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
indicatedGonneville · goldTonnes: 14000000Grade: 0.01Grade Unit: mozContained Metal: 0.01Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:fa9c6abc4007d273e728
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- indicated
- Tonnes
- 14000000
- Grade
- 0.01
- Grade Unit
- moz
- Contained Metal
- 0.01
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Indicated resource for gold in transitional sulphide material.
Positive factors
- Indicated category provides good confidence
Evidence · table
“0.01”
Context: 14
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
indicatedGonneville · nickelTonnes: 14000000Grade: 0.16Grade Unit: %Contained Metal: 22Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- nickel
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:fa9c6abc4007d273e728
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- indicated
- Tonnes
- 14000000
- Grade
- 0.16
- Grade Unit
- %
- Contained Metal
- 22
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Indicated resource for nickel in transitional sulphide material.
Positive factors
- Indicated category provides good confidence
Evidence · table
“0.16”
Context: 14
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
indicatedGonneville · copperTonnes: 14000000Grade: 0.103Grade Unit: %Contained Metal: 14Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- copper
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:fa9c6abc4007d273e728
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- indicated
- Tonnes
- 14000000
- Grade
- 0.103
- Grade Unit
- %
- Contained Metal
- 14
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Indicated resource for copper in transitional sulphide material.
Positive factors
- Indicated category provides good confidence
Evidence · table
“0.103”
Context: 14
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
indicatedGonneville · cobaltTonnes: 14000000Grade: 0.02Grade Unit: %Contained Metal: 2.7Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- cobalt
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:fa9c6abc4007d273e728
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- indicated
- Tonnes
- 14000000
- Grade
- 0.02
- Grade Unit
- %
- Contained Metal
- 2.7
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Indicated resource for cobalt in transitional sulphide material.
Positive factors
- Indicated category provides good confidence
Evidence · table
“0.020”
Context: 14
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · palladiumTonnes: 100000Grade: 0Grade Unit: mozContained Metal: 0Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- palladium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:69301860d1339a5347e6
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- inferred
- Tonnes
- 100000
- Grade
- 0
- Grade Unit
- moz
- Contained Metal
- 0
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Inferred resource for palladium in transitional sulphide material.
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.00”
Context: 0.1
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · platinumTonnes: 100000Grade: 0Grade Unit: mozContained Metal: 0Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- platinum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:69301860d1339a5347e6
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- inferred
- Tonnes
- 100000
- Grade
- 0
- Grade Unit
- moz
- Contained Metal
- 0
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Inferred resource for platinum in transitional sulphide material.
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.00”
Context: 0.1
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · goldTonnes: 100000Grade: 0Grade Unit: mozContained Metal: 0Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:69301860d1339a5347e6
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- inferred
- Tonnes
- 100000
- Grade
- 0
- Grade Unit
- moz
- Contained Metal
- 0
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Inferred resource for gold in transitional sulphide material.
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.00”
Context: 0.1
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · nickelTonnes: 100000Grade: 0.13Grade Unit: %Contained Metal: 0.19Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- nickel
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:69301860d1339a5347e6
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- inferred
- Tonnes
- 100000
- Grade
- 0.13
- Grade Unit
- %
- Contained Metal
- 0.19
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Inferred resource for nickel in transitional sulphide material.
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.13”
Context: 0.1
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · copperTonnes: 100000Grade: 0.101Grade Unit: %Contained Metal: 0.15Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- copper
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:69301860d1339a5347e6
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- inferred
- Tonnes
- 100000
- Grade
- 0.101
- Grade Unit
- %
- Contained Metal
- 0.15
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Inferred resource for copper in transitional sulphide material.
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.101”
Context: 0.1
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · cobaltTonnes: 100000Grade: 0.014Grade Unit: %Contained Metal: 0.02Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- cobalt
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:69301860d1339a5347e6
- Deposit or zone
- Sulphide (Transitional) – in-pit
Resource Data
- Category
- inferred
- Tonnes
- 100000
- Grade
- 0.014
- Grade Unit
- %
- Contained Metal
- 0.02
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Inferred resource for cobalt in transitional sulphide material.
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.014”
Context: 0.1
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
measuredGonneville · palladiumTonnes: 2500000Grade: 0.08Grade Unit: mozContained Metal: 0.08Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- palladium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:bcce8bb2cdbe5b6e438c
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- measured
- Tonnes
- 2500000
- Grade
- 0.08
- Grade Unit
- moz
- Contained Metal
- 0.08
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Measured resource for palladium in fresh sulphide material.
Positive factors
- Measured category provides high geological confidence
Evidence · table
“0.08”
Context: 2.5
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
measuredGonneville · platinumTonnes: 2500000Grade: 0.02Grade Unit: mozContained Metal: 0.02Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- platinum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:bcce8bb2cdbe5b6e438c
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- measured
- Tonnes
- 2500000
- Grade
- 0.02
- Grade Unit
- moz
- Contained Metal
- 0.02
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Measured resource for platinum in fresh sulphide material.
Positive factors
- Measured category provides high geological confidence
Evidence · table
“0.02”
Context: 2.5
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
measuredGonneville · goldTonnes: 2500000Grade: 0Grade Unit: mozContained Metal: 0Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:bcce8bb2cdbe5b6e438c
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- measured
- Tonnes
- 2500000
- Grade
- 0
- Grade Unit
- moz
- Contained Metal
- 0
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Measured resource for gold in fresh sulphide material.
Positive factors
- Measured category provides high geological confidence
Evidence · table
“0.00”
Context: 2.5
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
measuredGonneville · nickelTonnes: 2500000Grade: 0.21Grade Unit: %Contained Metal: 5.4Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- nickel
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:bcce8bb2cdbe5b6e438c
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- measured
- Tonnes
- 2500000
- Grade
- 0.21
- Grade Unit
- %
- Contained Metal
- 5.4
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Measured resource for nickel in fresh sulphide material.
Positive factors
- Measured category provides high geological confidence
Evidence · table
“0.21”
Context: 2.5
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
measuredGonneville · copperTonnes: 2500000Grade: 0.168Grade Unit: %Contained Metal: 4.3Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- copper
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:bcce8bb2cdbe5b6e438c
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- measured
- Tonnes
- 2500000
- Grade
- 0.168
- Grade Unit
- %
- Contained Metal
- 4.3
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Measured resource for copper in fresh sulphide material.
Positive factors
- Measured category provides high geological confidence
Evidence · table
“0.168”
Context: 2.5
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
measuredGonneville · cobaltTonnes: 2500000Grade: 0.018Grade Unit: %Contained Metal: 0.45Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- cobalt
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:bcce8bb2cdbe5b6e438c
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- measured
- Tonnes
- 2500000
- Grade
- 0.018
- Grade Unit
- %
- Contained Metal
- 0.45
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Measured resource for cobalt in fresh sulphide material.
Positive factors
- Measured category provides high geological confidence
Evidence · table
“0.018”
Context: 2.5
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
indicatedGonneville · palladiumTonnes: 380000000Grade: 7.4Grade Unit: mozContained Metal: 7.4Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- palladium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:34fd2164af7cc03655f9
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- indicated
- Tonnes
- 380000000
- Grade
- 7.4
- Grade Unit
- moz
- Contained Metal
- 7.4
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Large indicated resource for palladium in fresh sulphide material.
Positive factors
- Indicated category provides good confidence
- Large tonnage
Evidence · table
“7.4”
Context: 380
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
indicatedGonneville · platinumTonnes: 380000000Grade: 1.7Grade Unit: mozContained Metal: 1.7Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- platinum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:34fd2164af7cc03655f9
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- indicated
- Tonnes
- 380000000
- Grade
- 1.7
- Grade Unit
- moz
- Contained Metal
- 1.7
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Large indicated resource for platinum in fresh sulphide material.
Positive factors
- Indicated category provides good confidence
- Large tonnage
Evidence · table
“1.7”
Context: 380
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
indicatedGonneville · goldTonnes: 380000000Grade: 0.3Grade Unit: mozContained Metal: 0.3Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:34fd2164af7cc03655f9
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- indicated
- Tonnes
- 380000000
- Grade
- 0.3
- Grade Unit
- moz
- Contained Metal
- 0.3
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Large indicated resource for gold in fresh sulphide material.
Positive factors
- Indicated category provides good confidence
- Large tonnage
Evidence · table
“0.30”
Context: 380
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
indicatedGonneville · nickelTonnes: 380000000Grade: 0.15Grade Unit: %Contained Metal: 570Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- nickel
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:34fd2164af7cc03655f9
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- indicated
- Tonnes
- 380000000
- Grade
- 0.15
- Grade Unit
- %
- Contained Metal
- 570
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Large indicated resource for nickel in fresh sulphide material.
Positive factors
- Indicated category provides good confidence
- Large tonnage
Evidence · table
“0.15”
Context: 380
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
indicatedGonneville · copperTonnes: 380000000Grade: 0.088Grade Unit: %Contained Metal: 340Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- copper
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:34fd2164af7cc03655f9
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- indicated
- Tonnes
- 380000000
- Grade
- 0.088
- Grade Unit
- %
- Contained Metal
- 340
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Large indicated resource for copper in fresh sulphide material.
Positive factors
- Indicated category provides good confidence
- Large tonnage
Evidence · table
“0.088”
Context: 380
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
indicatedGonneville · cobaltTonnes: 380000000Grade: 0.015Grade Unit: %Contained Metal: 57Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- cobalt
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:34fd2164af7cc03655f9
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- indicated
- Tonnes
- 380000000
- Grade
- 0.015
- Grade Unit
- %
- Contained Metal
- 57
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Large indicated resource for cobalt in fresh sulphide material.
Positive factors
- Indicated category provides good confidence
- Large tonnage
Evidence · table
“0.015”
Context: 380
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · palladiumTonnes: 240000000Grade: 4.6Grade Unit: mozContained Metal: 4.6Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- palladium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:d584228ecaf962b29955
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- inferred
- Tonnes
- 240000000
- Grade
- 4.6
- Grade Unit
- moz
- Contained Metal
- 4.6
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Large inferred resource for palladium in fresh sulphide material.
Positive factors
- Large tonnage
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“4.6”
Context: 240
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · platinumTonnes: 240000000Grade: 1.1Grade Unit: mozContained Metal: 1.1Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- platinum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:d584228ecaf962b29955
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- inferred
- Tonnes
- 240000000
- Grade
- 1.1
- Grade Unit
- moz
- Contained Metal
- 1.1
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Large inferred resource for platinum in fresh sulphide material.
Positive factors
- Large tonnage
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“1.1”
Context: 240
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · goldTonnes: 240000000Grade: 0.15Grade Unit: mozContained Metal: 0.15Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:d584228ecaf962b29955
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- inferred
- Tonnes
- 240000000
- Grade
- 0.15
- Grade Unit
- moz
- Contained Metal
- 0.15
- Contained Unit
- moz
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Large inferred resource for gold in fresh sulphide material.
Positive factors
- Large tonnage
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.15”
Context: 240
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · nickelTonnes: 240000000Grade: 0.15Grade Unit: %Contained Metal: 350Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- nickel
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:d584228ecaf962b29955
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- inferred
- Tonnes
- 240000000
- Grade
- 0.15
- Grade Unit
- %
- Contained Metal
- 350
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Large inferred resource for nickel in fresh sulphide material.
Positive factors
- Large tonnage
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.15”
Context: 240
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · copperTonnes: 240000000Grade: 0.074Grade Unit: %Contained Metal: 170Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- copper
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:d584228ecaf962b29955
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- inferred
- Tonnes
- 240000000
- Grade
- 0.074
- Grade Unit
- %
- Contained Metal
- 170
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Large inferred resource for copper in fresh sulphide material.
Positive factors
- Large tonnage
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.074”
Context: 240
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · cobaltTonnes: 240000000Grade: 0.015Grade Unit: %Contained Metal: 35Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- cobalt
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:d584228ecaf962b29955
- Deposit or zone
- Sulphide (Fresh) – in-pit
Resource Data
- Category
- inferred
- Tonnes
- 240000000
- Grade
- 0.015
- Grade Unit
- %
- Contained Metal
- 35
- Contained Unit
- kt
- Cutoff Grade
- 25
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Large inferred resource for cobalt in fresh sulphide material.
Positive factors
- Large tonnage
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.015”
Context: 240
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · palladiumTonnes: 7300000Grade: 0.4Grade Unit: mozContained Metal: 0.4Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- palladium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:743c5da16697e51826da
- Deposit or zone
- Sulphide (Fresh) – MSO
Resource Data
- Category
- inferred
- Tonnes
- 7300000
- Grade
- 0.4
- Grade Unit
- moz
- Contained Metal
- 0.4
- Contained Unit
- moz
- Cutoff Grade
- 110
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Inferred resource for palladium in MSO fresh sulphide material at a higher grade.
Positive factors
- Higher grade
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.40”
Context: 7.3
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · platinumTonnes: 7300000Grade: 0.09Grade Unit: mozContained Metal: 0.09Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- platinum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:743c5da16697e51826da
- Deposit or zone
- Sulphide (Fresh) – MSO
Resource Data
- Category
- inferred
- Tonnes
- 7300000
- Grade
- 0.09
- Grade Unit
- moz
- Contained Metal
- 0.09
- Contained Unit
- moz
- Cutoff Grade
- 110
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Inferred resource for platinum in MSO fresh sulphide material at a higher grade.
Positive factors
- Higher grade
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.09”
Context: 7.3
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · goldTonnes: 7300000Grade: 0.02Grade Unit: mozContained Metal: 0.02Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:743c5da16697e51826da
- Deposit or zone
- Sulphide (Fresh) – MSO
Resource Data
- Category
- inferred
- Tonnes
- 7300000
- Grade
- 0.02
- Grade Unit
- moz
- Contained Metal
- 0.02
- Contained Unit
- moz
- Cutoff Grade
- 110
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Inferred resource for gold in MSO fresh sulphide material at a higher grade.
Positive factors
- Higher grade
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.02”
Context: 7.3
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · nickelTonnes: 7300000Grade: 0.16Grade Unit: %Contained Metal: 12Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- nickel
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:743c5da16697e51826da
- Deposit or zone
- Sulphide (Fresh) – MSO
Resource Data
- Category
- inferred
- Tonnes
- 7300000
- Grade
- 0.16
- Grade Unit
- %
- Contained Metal
- 12
- Contained Unit
- kt
- Cutoff Grade
- 110
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Inferred resource for nickel in MSO fresh sulphide material at a higher grade.
Positive factors
- Higher grade
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.16”
Context: 7.3
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · copperTonnes: 7300000Grade: 0.192Grade Unit: %Contained Metal: 14Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- copper
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:743c5da16697e51826da
- Deposit or zone
- Sulphide (Fresh) – MSO
Resource Data
- Category
- inferred
- Tonnes
- 7300000
- Grade
- 0.192
- Grade Unit
- %
- Contained Metal
- 14
- Contained Unit
- kt
- Cutoff Grade
- 110
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Inferred resource for copper in MSO fresh sulphide material at a higher grade.
Positive factors
- Higher grade
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.192”
Context: 7.3
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
inferredGonneville · cobaltTonnes: 7300000Grade: 0.015Grade Unit: %Contained Metal: 1.1Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- cobalt
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mike Millad, Mike Job
- Resource group id
- resource:743c5da16697e51826da
- Deposit or zone
- Sulphide (Fresh) – MSO
Resource Data
- Category
- inferred
- Tonnes
- 7300000
- Grade
- 0.015
- Grade Unit
- %
- Contained Metal
- 1.1
- Contained Unit
- kt
- Cutoff Grade
- 110
- Cutoff Unit
- A$/t NSR
Prior Estimate
- Resource Date
- 2024-04-23
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Inferred resource for cobalt in MSO fresh sulphide material at a higher grade.
Positive factors
- Higher grade
Negative factors
- Inferred category has lower geological confidence
Evidence · table
“0.015”
Context: 7.3
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 2.4 years before this release
provenGonneville · palladiumTonnes: 2500000Grade: 0.087Grade Unit: mozContained Metal: 0.087Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- palladium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dan Donald
- Resource group id
- resource:13099cbd5ec12c0b8b01
Resource Data
- Category
- proven
- Tonnes
- 2500000
- Grade
- 0.087
- Grade Unit
- moz
- Contained Metal
- 0.087
- Contained Unit
- moz
Prior Estimate
- Resource Date
- 2025-12-08
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Maiden Proved Ore Reserve for palladium at Gonneville.
Positive factors
- Proved Reserve category provides high confidence
- Good palladium grade
Evidence · table
“0.087”
Context: 2.5
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
provenGonneville · platinumTonnes: 2500000Grade: 0.018Grade Unit: mozContained Metal: 0.018Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- platinum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dan Donald
- Resource group id
- resource:13099cbd5ec12c0b8b01
Resource Data
- Category
- proven
- Tonnes
- 2500000
- Grade
- 0.018
- Grade Unit
- moz
- Contained Metal
- 0.018
- Contained Unit
- moz
Prior Estimate
- Resource Date
- 2025-12-08
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Maiden Proved Ore Reserve for platinum at Gonneville.
Positive factors
- Proved Reserve category provides high confidence
Evidence · table
“0.018”
Context: 2.5
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
provenGonneville · goldTonnes: 2500000Grade: 0.0024Grade Unit: mozContained Metal: 0.0024Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dan Donald
- Resource group id
- resource:13099cbd5ec12c0b8b01
Resource Data
- Category
- proven
- Tonnes
- 2500000
- Grade
- 0.0024
- Grade Unit
- moz
- Contained Metal
- 0.0024
- Contained Unit
- moz
Prior Estimate
- Resource Date
- 2025-12-08
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Maiden Proved Ore Reserve for gold at Gonneville.
Positive factors
- Proved Reserve category provides high confidence
Evidence · table
“0.0024”
Context: 2.5
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
provenGonneville · nickelTonnes: 2500000Grade: 0.22Grade Unit: %Contained Metal: 5.4Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- nickel
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dan Donald
- Resource group id
- resource:13099cbd5ec12c0b8b01
Resource Data
- Category
- proven
- Tonnes
- 2500000
- Grade
- 0.22
- Grade Unit
- %
- Contained Metal
- 5.4
- Contained Unit
- kt
Prior Estimate
- Resource Date
- 2025-12-08
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Maiden Proved Ore Reserve for nickel at Gonneville.
Positive factors
- Proved Reserve category provides high confidence
- Good nickel grade
Evidence · table
“0.22”
Context: 2.5
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
provenGonneville · copperTonnes: 2500000Grade: 0.18Grade Unit: %Contained Metal: 4.4Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- copper
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dan Donald
- Resource group id
- resource:13099cbd5ec12c0b8b01
Resource Data
- Category
- proven
- Tonnes
- 2500000
- Grade
- 0.18
- Grade Unit
- %
- Contained Metal
- 4.4
- Contained Unit
- kt
Prior Estimate
- Resource Date
- 2025-12-08
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Maiden Proved Ore Reserve for copper at Gonneville.
Positive factors
- Proved Reserve category provides high confidence
- Good copper grade
Evidence · table
“0.18”
Context: 2.5
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
provenGonneville · cobaltTonnes: 2500000Grade: 0.018Grade Unit: %Contained Metal: 0.45Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- cobalt
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dan Donald
- Resource group id
- resource:13099cbd5ec12c0b8b01
Resource Data
- Category
- proven
- Tonnes
- 2500000
- Grade
- 0.018
- Grade Unit
- %
- Contained Metal
- 0.45
- Contained Unit
- kt
Prior Estimate
- Resource Date
- 2025-12-08
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Maiden Proved Ore Reserve for cobalt at Gonneville.
Positive factors
- Proved Reserve category provides high confidence
Evidence · table
“0.018”
Context: 2.5
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
probableGonneville · palladiumTonnes: 260000000Grade: 5.6Grade Unit: mozContained Metal: 5.6Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- palladium
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dan Donald
- Resource group id
- resource:f2cb5bd3c3eb3e43d204
Resource Data
- Category
- probable
- Tonnes
- 260000000
- Grade
- 5.6
- Grade Unit
- moz
- Contained Metal
- 5.6
- Contained Unit
- moz
Prior Estimate
- Resource Date
- 2025-12-08
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Maiden Probable Ore Reserve for palladium at Gonneville.
Positive factors
- Probable Reserve category provides good confidence
- Large tonnage
- Good palladium grade
Evidence · table
“5.6”
Context: 260
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
probableGonneville · platinumTonnes: 260000000Grade: 1.3Grade Unit: mozContained Metal: 1.3Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- platinum
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dan Donald
- Resource group id
- resource:f2cb5bd3c3eb3e43d204
Resource Data
- Category
- probable
- Tonnes
- 260000000
- Grade
- 1.3
- Grade Unit
- moz
- Contained Metal
- 1.3
- Contained Unit
- moz
Prior Estimate
- Resource Date
- 2025-12-08
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Maiden Probable Ore Reserve for platinum at Gonneville.
Positive factors
- Probable Reserve category provides good confidence
- Large tonnage
Evidence · table
“1.3”
Context: 260
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
probableGonneville · goldTonnes: 260000000Grade: 0.22Grade Unit: mozContained Metal: 0.22Contained Unit: mozView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dan Donald
- Resource group id
- resource:f2cb5bd3c3eb3e43d204
Resource Data
- Category
- probable
- Tonnes
- 260000000
- Grade
- 0.22
- Grade Unit
- moz
- Contained Metal
- 0.22
- Contained Unit
- moz
Prior Estimate
- Resource Date
- 2025-12-08
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Maiden Probable Ore Reserve for gold at Gonneville.
Positive factors
- Probable Reserve category provides good confidence
- Large tonnage
Evidence · table
“0.22”
Context: 260
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
probableGonneville · nickelTonnes: 260000000Grade: 0.16Grade Unit: %Contained Metal: 400Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- nickel
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dan Donald
- Resource group id
- resource:f2cb5bd3c3eb3e43d204
Resource Data
- Category
- probable
- Tonnes
- 260000000
- Grade
- 0.16
- Grade Unit
- %
- Contained Metal
- 400
- Contained Unit
- kt
Prior Estimate
- Resource Date
- 2025-12-08
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Maiden Probable Ore Reserve for nickel at Gonneville.
Positive factors
- Probable Reserve category provides good confidence
- Large tonnage
- Good nickel grade
Evidence · table
“0.16”
Context: 260
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
probableGonneville · copperTonnes: 260000000Grade: 0.098Grade Unit: %Contained Metal: 260Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- copper
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dan Donald
- Resource group id
- resource:f2cb5bd3c3eb3e43d204
Resource Data
- Category
- probable
- Tonnes
- 260000000
- Grade
- 0.098
- Grade Unit
- %
- Contained Metal
- 260
- Contained Unit
- kt
Prior Estimate
- Resource Date
- 2025-12-08
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Maiden Probable Ore Reserve for copper at Gonneville.
Positive factors
- Probable Reserve category provides good confidence
- Large tonnage
- Good copper grade
Evidence · table
“0.098”
Context: 260
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
probableGonneville · cobaltTonnes: 260000000Grade: 0.017Grade Unit: %Contained Metal: 43Contained Unit: ktView all detailsHide details
Identity
- Project
- Gonneville
- Commodity
- cobalt
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- CHN
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dan Donald
- Resource group id
- resource:f2cb5bd3c3eb3e43d204
Resource Data
- Category
- probable
- Tonnes
- 260000000
- Grade
- 0.017
- Grade Unit
- %
- Contained Metal
- 43
- Contained Unit
- kt
Prior Estimate
- Resource Date
- 2025-12-08
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-09-29T00:00:00.000Z
Reasoning: Maiden Probable Ore Reserve for cobalt at Gonneville.
Positive factors
- Probable Reserve category provides good confidence
- Large tonnage
Evidence · table
“0.017”
Context: 260
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.