# Centerra Gold Reports Fourth Quarter and Full Year 2025 Results; Delivered Robust Annual Production and Beat Cost Guidance; 2026 Outlook Remains Strong as Centerra Executes its Self-Funded Growth Strategy

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/centerra-gold-reports-fourth-quarter-and-full-year-2025-results-delivered-robust--fefefabd-1356-4217-b30a-78c7d89b58bf

Original source: https://money.tmx.com/en/quote/CG/news/6091468971796329/centerra-gold-reports-fourth-quarter-and-full-year-2025-results-delivered-robust

Publisher: tmx

Original announcement: 2026-02-19T22:00:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: Unknown date

Atlas analysis updated: Unknown date

- Company: Centerra Gold Inc.

- Ticker: CG

- Exchange: TSX

- Region: Unavailable

- Primary commodity: Gold

- Secondary commodities: Copper, Molybdenum

- Document categories: Production, Resource update, Permitting

- Extracted: 2026-08-21 02:03:27 UTC

Narrative sentiment: 0.80 · Bullish

## Minestarters Atlas summary

Centerra Gold reported strong fourth quarter and full year 2025 results, exceeding gold production guidance and beating cost guidance. The company achieved consolidated gold production of 275,316 ounces and copper production of 50.5 million pounds for the full year 2025. For 2026, Centerra expects consolidated gold production of 250,000 to 280,000 ounces and copper production of 50 to 60 million pounds, with a focus on advancing growth projects like Thompson Creek, Goldfield, and Kemess.

Reasoning: Centerra Gold reported strong 2025 operational and financial results, exceeding gold production and beating cost guidance, while providing robust 2026 guidance. Key growth projects like Mount Milligan, Kemess, and Goldfield show strong economics and progress, including significant reserve increases and permit extensions for Mount Milligan. The temporary suspension of Langeloth is a minor setback, and the Thompson Creek capital increase is manageable within the self-funded growth strategy.

- Positive factor: Strong 2025 production and cost performance, exceeding guidance midpoints and beating cost guidance.

- Positive factor: Robust 2026 production and cost guidance reflecting stable operations and strong cash flow generation.

- Positive factor: Significant increase in Mount Milligan's Proven and Probable gold and copper reserves, extending mine life.

- Positive factor: Positive PEA results for Kemess and Goldfield projects, highlighting strong economics and growth potential.

- Positive factor: Mount Milligan received key permit amendments extending operations through 2035 and allowing throughput expansion.

- Positive factor: Company's self-funded growth strategy and commitment to returning capital to shareholders.

- Negative factor: Temporary suspension of Langeloth Metallurgical Facility operations due to an explosion, with repair costs expected.

- Negative factor: Thompson Creek restart project capital estimate increased due to inflation and additional requirements.

Facts used in scoring: 45

## Classification and evidence

**Production Beat Guidance**

Polarity: positive

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: Full year 2025 consolidated gold production of 275,316 ounces exceeded the midpoint of the guidance range.

Evidence · text

> Full year 2025 consolidated production was 275,316 ounces of gold, exceeding the midpoint of the guidance range

**Cost Beat Guidance**

Polarity: positive

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: Full year 2025 consolidated gold production costs \($1,297/oz\) and AISC \($1,614/oz\) came in below the 2025 cost guidance ranges.

Evidence · text

> Full year 2025 consolidated gold production costs were $1,297 per ounce and AISC on a by-product basis NG were $1,614 per ounce, coming in below the 2025 cost guidance ranges.

**Category Upgrade**

Polarity: positive

Definition: Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.

Why it applies: Mount Milligan's Proven and Probable reserves increased significantly by 56% for gold and 52% for copper.

Evidence · text

> Proven and probable reserves announced in the PFS increased significantly to 4.4 million ounces of gold and 1.7 billion pounds of copper, representing a 56% and 52% increase, respectively, from year-end 2024.

**Tonnage Growth**

Polarity: positive

Definition: Significant tonnage increase \(≥15%\) vs prior estimate with grade maintained or improved.

Why it applies: Mount Milligan's Proven and Probable gold reserves increased by 56% and copper reserves by 52%.

Evidence · text

> Proven and probable reserves announced in the PFS increased significantly to 4.4 million ounces of gold and 1.7 billion pounds of copper, representing a 56% and 52% increase, respectively, from year-end 2024.

**Mine Life Extension**

Polarity: positive

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The Mount Milligan PFS extends the mine life by approximately 10 years to 2045.

Evidence · text

> extends the LOM by approximately 10 years to 2045.

**Permit Received**

Polarity: positive

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: Mount Milligan received amended environmental assessment and permits to continue operations through 2035, including a 10% plant throughput expansion.

Evidence · text

> Centerra received an amended environmental assessment and all related permits to allow for the continuation of Mount Milligan’s operations through 2035. These authorizations include a 10% expansion in plant throughput beginning in 2028

**Operational Disruption**

Polarity: negative

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The Langeloth Metallurgical Facility suspended operations due to an explosion, with repairs expected to cost $5 to $10 million.

Evidence · text

> On January 29, 2026, Centerra suspended operations at its Langeloth Metallurgical Facility \(“Langeloth”\) near Pittsburgh, Pennsylvania following an explosion adjacent to the acid plant. ... Repairs are expected to cost approximately $5 to $10 million.

**Resource Update**

Polarity: neutral

Definition: Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The Kemess PEA outlines a mineral inventory of over 2.3 million ounces of contained gold and 851 million pounds of contained copper.

Evidence · text

> PEA mineral inventory of over 2.3 million ounces of contained gold and 851 million pounds of contained copper

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: The Kemess project published results of a Preliminary Economic Assessment \(PEA\) highlighting its long-term potential.

Evidence · text

> In January 2026, Centerra published an updated mineral resource and the results of a PEA for the Kemess project

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: The Mount Milligan project published Pre-Feasibility Study \(PFS\) results extending its mine life.

Evidence · text

> In September 2025, Centerra published the Pre-Feasibility Study \(“PFS”\) results for Mount Milligan

## Extracted facts

Stored fact records: 0. Some facts used in scoring do not have a stored record.

No stored fact records are available for this extraction.

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.