BHP: Quarterly Activities Report

Original announcement by asx on

Company
BHP Group Limited
Ticker
BHP
Exchange
ASX
Region
South Australia
Primary commodity
Copper
Secondary commodities
Uranium, Gold, Silver, Iron ore, Steelmaking coal, Energy coal, Potash, Lead, Zinc, Molybdenum
Document categories
Resource update, Production, Other
Extracted
2026-10-19 22:19:01 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

BHP reported its Q1 FY27 operational review, highlighting a significant increase in the Olympic Dam mineral resource base with the first-time reporting of an underground block cave resource. This new resource adds 10,730 Mt at 0.59% Cu, 0.19 kg/t U3O8, 0.21 g/t Au, and 1 g/t Ag, bringing the total contained metal to 88.1 Mt Cu, 2.8 Mt U3O8, 103 Moz Au, and 498 Moz Ag. The company also provided production figures for copper, iron ore, and coal, noting a decrease in copper production due to planned grade declines and operational disruptions, while bulk commodities delivered a strong start to the year.

Reasoning: The report presents a significant resource update for Olympic Dam, which is a major positive for long-term growth. However, this is balanced by a decrease in copper production and tragic safety incidents. Strong performance in bulk commodities and progress on other growth projects contribute to an overall positive outlook despite challenges.

Positive factors

  • Significant increase in Olympic Dam's mineral resource base with the first-time reporting of a block cave resource, adding substantial tonnes and contained metal.
  • Strong operational performance in bulk commodities (WAIO, BMA, NSW Energy Coal) with several Q1 records achieved.
  • Progress on key growth projects like Jansen Potash (87% complete for Stage 1) and Escondida New Concentrator funding approval.
  • High commodity prices, particularly copper, provided a tailwind for earnings.

Negative factors

  • Two fatalities reported at Escondida and Peak Downs, highlighting safety concerns.
  • Copper production decreased due to planned grade declines, scheduled maintenance, severe weather, and operational disruptions.
  • Global market volatility, geopolitical tensions, trade uncertainty, and elevated energy/freight costs continue to create industry headwinds.

Facts used in scoring: 36

Extracted facts

Stored fact records: 36. Some facts used in scoring do not have a stored record.

Resource Estimates (36)

measuredOlympic Dam · copperTonnes: 4000000000Grade: 0.61Grade Unit: %View all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
copper
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:9942471ef7428a610e45
Deposit or zone
UG Sulphide (Block Cave)
Mining method
underground
Material type
sulphide

Resource Data

Category
measured
Tonnes
4000000000
Grade
0.61
Grade Unit
%
Cutoff Grade
0.35
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: First-time reporting of a large Measured resource for the block cave mining method at Olympic Dam, providing high confidence for future studies.

Positive factors

  • Maiden resource for block cave mining method, adding significant Measured tonnes.
  • High confidence category (Measured) for a substantial portion of the new resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Evidence · table

“0.61”

Context: 4,000

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: The resource is classified as Measured, indicating the highest confidence category.

Evidence · table

“Measured Resources”

Context: 4,000

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

measuredOlympic Dam · uraniumTonnes: 4000000000Grade: 0.19Grade Unit: kg/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
uranium
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:9942471ef7428a610e45
Deposit or zone
UG Sulphide (Block Cave)
Mining method
underground
Material type
sulphide

Resource Data

Category
measured
Tonnes
4000000000
Grade
0.19
Grade Unit
kg/t
Cutoff Grade
0.35
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: First-time reporting of a large Measured resource for uranium within the block cave mining method at Olympic Dam.

Positive factors

  • Maiden resource for block cave mining method, adding significant Measured tonnes of uranium.
  • High confidence category (Measured) for a substantial portion of the new resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Evidence · table

“0.19”

Context: 4,000

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: The resource is classified as Measured, indicating the highest confidence category.

Evidence · table

“Measured Resources”

Context: 4,000

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

measuredOlympic Dam · goldTonnes: 4000000000Grade: 0.21Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
gold
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:9942471ef7428a610e45
Deposit or zone
UG Sulphide (Block Cave)
Mining method
underground
Material type
sulphide

Resource Data

Category
measured
Tonnes
4000000000
Grade
0.21
Grade Unit
g/t
Cutoff Grade
0.35
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: First-time reporting of a large Measured resource for gold within the block cave mining method at Olympic Dam.

Positive factors

  • Maiden resource for block cave mining method, adding significant Measured tonnes of gold.
  • High confidence category (Measured) for a substantial portion of the new resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Evidence · table

“0.21”

Context: 4,000

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: The resource is classified as Measured, indicating the highest confidence category.

Evidence · table

“Measured Resources”

Context: 4,000

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

measuredOlympic Dam · silverTonnes: 4000000000Grade: 1Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
silver
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:9942471ef7428a610e45
Deposit or zone
UG Sulphide (Block Cave)
Mining method
underground
Material type
sulphide

Resource Data

Category
measured
Tonnes
4000000000
Grade
1
Grade Unit
g/t
Cutoff Grade
0.35
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: First-time reporting of a large Measured resource for silver within the block cave mining method at Olympic Dam.

Positive factors

  • Maiden resource for block cave mining method, adding significant Measured tonnes of silver.
  • High confidence category (Measured) for a substantial portion of the new resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Evidence · table

“1”

Context: 4,000

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: The resource is classified as Measured, indicating the highest confidence category.

Evidence · table

“Measured Resources”

Context: 4,000

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedOlympic Dam · copperTonnes: 4130000000Grade: 0.57Grade Unit: %View all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
copper
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:aa91e3bb0a574f38e6e1
Deposit or zone
UG Sulphide (Block Cave)
Mining method
underground
Material type
sulphide

Resource Data

Category
indicated
Tonnes
4130000000
Grade
0.57
Grade Unit
%
Cutoff Grade
0.35
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: First-time reporting of a large Indicated resource for the block cave mining method at Olympic Dam.

Positive factors

  • Maiden resource for block cave mining method, adding significant Indicated tonnes.
  • High confidence category (Indicated) for a substantial portion of the new resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Evidence · table

“0.57”

Context: 4,130

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating reasonable geological confidence.

Evidence · table

“Indicated Resources”

Context: 4,130

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedOlympic Dam · uraniumTonnes: 4130000000Grade: 0.18Grade Unit: kg/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
uranium
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:aa91e3bb0a574f38e6e1
Deposit or zone
UG Sulphide (Block Cave)
Mining method
underground
Material type
sulphide

Resource Data

Category
indicated
Tonnes
4130000000
Grade
0.18
Grade Unit
kg/t
Cutoff Grade
0.35
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: First-time reporting of a large Indicated resource for uranium within the block cave mining method at Olympic Dam.

Positive factors

  • Maiden resource for block cave mining method, adding significant Indicated tonnes of uranium.
  • High confidence category (Indicated) for a substantial portion of the new resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Evidence · table

“0.18”

Context: 4,130

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating reasonable geological confidence.

Evidence · table

“Indicated Resources”

Context: 4,130

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedOlympic Dam · goldTonnes: 4130000000Grade: 0.21Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
gold
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:aa91e3bb0a574f38e6e1
Deposit or zone
UG Sulphide (Block Cave)
Mining method
underground
Material type
sulphide

Resource Data

Category
indicated
Tonnes
4130000000
Grade
0.21
Grade Unit
g/t
Cutoff Grade
0.35
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: First-time reporting of a large Indicated resource for gold within the block cave mining method at Olympic Dam.

Positive factors

  • Maiden resource for block cave mining method, adding significant Indicated tonnes of gold.
  • High confidence category (Indicated) for a substantial portion of the new resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Evidence · table

“0.21”

Context: 4,130

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating reasonable geological confidence.

Evidence · table

“Indicated Resources”

Context: 4,130

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedOlympic Dam · silverTonnes: 4130000000Grade: 1Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
silver
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:aa91e3bb0a574f38e6e1
Deposit or zone
UG Sulphide (Block Cave)
Mining method
underground
Material type
sulphide

Resource Data

Category
indicated
Tonnes
4130000000
Grade
1
Grade Unit
g/t
Cutoff Grade
0.35
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: First-time reporting of a large Indicated resource for silver within the block cave mining method at Olympic Dam.

Positive factors

  • Maiden resource for block cave mining method, adding significant Indicated tonnes of silver.
  • High confidence category (Indicated) for a substantial portion of the new resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Evidence · table

“1”

Context: 4,130

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating reasonable geological confidence.

Evidence · table

“Indicated Resources”

Context: 4,130

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredOlympic Dam · copperTonnes: 2600000000Grade: 0.6Grade Unit: %View all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
copper
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:bfd06258cddc38c4978b
Deposit or zone
UG Sulphide (Block Cave)
Mining method
underground
Material type
sulphide

Resource Data

Category
inferred
Tonnes
2600000000
Grade
0.6
Grade Unit
%
Cutoff Grade
0.35
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: First-time reporting of a large Inferred resource for the block cave mining method at Olympic Dam, providing early-stage potential.

Positive factors

  • Maiden resource for block cave mining method, adding significant Inferred tonnes.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Inferred category indicates lower geological confidence and cannot support economic studies alone.

Evidence · table

“0.60”

Context: 2,600

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative category with limited drilling.

Evidence · table

“Inferred Resources”

Context: 2,600

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredOlympic Dam · uraniumTonnes: 2600000000Grade: 0.19Grade Unit: kg/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
uranium
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:bfd06258cddc38c4978b
Deposit or zone
UG Sulphide (Block Cave)
Mining method
underground
Material type
sulphide

Resource Data

Category
inferred
Tonnes
2600000000
Grade
0.19
Grade Unit
kg/t
Cutoff Grade
0.35
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: First-time reporting of a large Inferred resource for uranium within the block cave mining method at Olympic Dam.

Positive factors

  • Maiden resource for block cave mining method, adding significant Inferred tonnes of uranium.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Inferred category indicates lower geological confidence and cannot support economic studies alone.

Evidence · table

“0.19”

Context: 2,600

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative category with limited drilling.

Evidence · table

“Inferred Resources”

Context: 2,600

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredOlympic Dam · goldTonnes: 2600000000Grade: 0.23Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
gold
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:bfd06258cddc38c4978b
Deposit or zone
UG Sulphide (Block Cave)
Mining method
underground
Material type
sulphide

Resource Data

Category
inferred
Tonnes
2600000000
Grade
0.23
Grade Unit
g/t
Cutoff Grade
0.35
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: First-time reporting of a large Inferred resource for gold within the block cave mining method at Olympic Dam.

Positive factors

  • Maiden resource for block cave mining method, adding significant Inferred tonnes of gold.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Inferred category indicates lower geological confidence and cannot support economic studies alone.

Evidence · table

“0.23”

Context: 2,600

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative category with limited drilling.

Evidence · table

“Inferred Resources”

Context: 2,600

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredOlympic Dam · silverTonnes: 2600000000Grade: 1Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
silver
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:bfd06258cddc38c4978b
Deposit or zone
UG Sulphide (Block Cave)
Mining method
underground
Material type
sulphide

Resource Data

Category
inferred
Tonnes
2600000000
Grade
1
Grade Unit
g/t
Cutoff Grade
0.35
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: First-time reporting of a large Inferred resource for silver within the block cave mining method at Olympic Dam.

Positive factors

  • Maiden resource for block cave mining method, adding significant Inferred tonnes of silver.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Inferred category indicates lower geological confidence and cannot support economic studies alone.

Evidence · table

“1”

Context: 2,600

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative category with limited drilling.

Evidence · table

“Inferred Resources”

Context: 2,600

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

measuredOlympic Dam · copperTonnes: 840000000Grade: 1.59Grade Unit: %View all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
copper
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:97fd45f04482b34b1259
Deposit or zone
UG Sulphide (SLOS)
Mining method
underground
Material type
sulphide

Resource Data

Category
measured
Tonnes
840000000
Grade
1.59
Grade Unit
%
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Measured resource for SLOS mining method at Olympic Dam, maintaining high confidence.

Positive factors

  • High confidence category (Measured) for a significant resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Resource is unchanged from prior reporting, indicating low novelty.

Evidence · table

“1.59”

Context: 840

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: The resource is classified as Measured, indicating the highest confidence category.

Evidence · table

“Measured Resources”

Context: 840

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

measuredOlympic Dam · uraniumTonnes: 840000000Grade: 0.47Grade Unit: kg/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
uranium
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:97fd45f04482b34b1259
Deposit or zone
UG Sulphide (SLOS)
Mining method
underground
Material type
sulphide

Resource Data

Category
measured
Tonnes
840000000
Grade
0.47
Grade Unit
kg/t
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Measured resource for uranium within the SLOS mining method at Olympic Dam.

Positive factors

  • High confidence category (Measured) for a significant resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Resource is unchanged from prior reporting, indicating low novelty.

Evidence · table

“0.47”

Context: 840

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: The resource is classified as Measured, indicating the highest confidence category.

Evidence · table

“Measured Resources”

Context: 840

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

measuredOlympic Dam · goldTonnes: 840000000Grade: 0.62Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
gold
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:97fd45f04482b34b1259
Deposit or zone
UG Sulphide (SLOS)
Mining method
underground
Material type
sulphide

Resource Data

Category
measured
Tonnes
840000000
Grade
0.62
Grade Unit
g/t
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Measured resource for gold within the SLOS mining method at Olympic Dam.

Positive factors

  • High confidence category (Measured) for a significant resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Resource is unchanged from prior reporting, indicating low novelty.

Evidence · table

“0.62”

Context: 840

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: The resource is classified as Measured, indicating the highest confidence category.

Evidence · table

“Measured Resources”

Context: 840

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

measuredOlympic Dam · silverTonnes: 840000000Grade: 3Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
silver
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:97fd45f04482b34b1259
Deposit or zone
UG Sulphide (SLOS)
Mining method
underground
Material type
sulphide

Resource Data

Category
measured
Tonnes
840000000
Grade
3
Grade Unit
g/t
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Measured resource for silver within the SLOS mining method at Olympic Dam.

Positive factors

  • High confidence category (Measured) for a significant resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Resource is unchanged from prior reporting, indicating low novelty.

Evidence · table

“3”

Context: 840

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: The resource is classified as Measured, indicating the highest confidence category.

Evidence · table

“Measured Resources”

Context: 840

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedOlympic Dam · copperTonnes: 540000000Grade: 1.56Grade Unit: %View all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
copper
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:d3d771a764b257053b73
Deposit or zone
UG Sulphide (SLOS)
Mining method
underground
Material type
sulphide

Resource Data

Category
indicated
Tonnes
540000000
Grade
1.56
Grade Unit
%
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Indicated resource for SLOS mining method at Olympic Dam, maintaining high confidence.

Positive factors

  • High confidence category (Indicated) for a significant resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Resource is unchanged from prior reporting, indicating low novelty.

Evidence · table

“1.56”

Context: 540

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating reasonable geological confidence.

Evidence · table

“Indicated Resources”

Context: 540

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedOlympic Dam · uraniumTonnes: 540000000Grade: 0.45Grade Unit: kg/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
uranium
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:d3d771a764b257053b73
Deposit or zone
UG Sulphide (SLOS)
Mining method
underground
Material type
sulphide

Resource Data

Category
indicated
Tonnes
540000000
Grade
0.45
Grade Unit
kg/t
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Indicated resource for uranium within the SLOS mining method at Olympic Dam.

Positive factors

  • High confidence category (Indicated) for a significant resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Resource is unchanged from prior reporting, indicating low novelty.

Evidence · table

“0.45”

Context: 540

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating reasonable geological confidence.

Evidence · table

“Indicated Resources”

Context: 540

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedOlympic Dam · goldTonnes: 540000000Grade: 0.57Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
gold
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:d3d771a764b257053b73
Deposit or zone
UG Sulphide (SLOS)
Mining method
underground
Material type
sulphide

Resource Data

Category
indicated
Tonnes
540000000
Grade
0.57
Grade Unit
g/t
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Indicated resource for gold within the SLOS mining method at Olympic Dam.

Positive factors

  • High confidence category (Indicated) for a significant resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Resource is unchanged from prior reporting, indicating low novelty.

Evidence · table

“0.57”

Context: 540

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating reasonable geological confidence.

Evidence · table

“Indicated Resources”

Context: 540

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedOlympic Dam · silverTonnes: 540000000Grade: 3Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
silver
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:d3d771a764b257053b73
Deposit or zone
UG Sulphide (SLOS)
Mining method
underground
Material type
sulphide

Resource Data

Category
indicated
Tonnes
540000000
Grade
3
Grade Unit
g/t
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Indicated resource for silver within the SLOS mining method at Olympic Dam.

Positive factors

  • High confidence category (Indicated) for a significant resource.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Resource is unchanged from prior reporting, indicating low novelty.

Evidence · table

“3”

Context: 540

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The resource is classified as Indicated, indicating reasonable geological confidence.

Evidence · table

“Indicated Resources”

Context: 540

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredOlympic Dam · copperTonnes: 210000000Grade: 1.44Grade Unit: %View all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
copper
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:82547eecd4630b6a46f5
Deposit or zone
UG Sulphide (SLOS)
Mining method
underground
Material type
sulphide

Resource Data

Category
inferred
Tonnes
210000000
Grade
1.44
Grade Unit
%
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Inferred resource for SLOS mining method at Olympic Dam, providing early-stage potential.

Positive factors

  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Resource is unchanged from prior reporting, indicating low novelty.
  • Inferred category indicates lower geological confidence and cannot support economic studies alone.

Evidence · table

“1.44”

Context: 210

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative category with limited drilling.

Evidence · table

“Inferred Resources”

Context: 210

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredOlympic Dam · uraniumTonnes: 210000000Grade: 0.42Grade Unit: kg/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
uranium
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:82547eecd4630b6a46f5
Deposit or zone
UG Sulphide (SLOS)
Mining method
underground
Material type
sulphide

Resource Data

Category
inferred
Tonnes
210000000
Grade
0.42
Grade Unit
kg/t
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Inferred resource for uranium within the SLOS mining method at Olympic Dam.

Positive factors

  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Resource is unchanged from prior reporting, indicating low novelty.
  • Inferred category indicates lower geological confidence and cannot support economic studies alone.

Evidence · table

“0.42”

Context: 210

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative category with limited drilling.

Evidence · table

“Inferred Resources”

Context: 210

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredOlympic Dam · goldTonnes: 210000000Grade: 0.63Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
gold
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:82547eecd4630b6a46f5
Deposit or zone
UG Sulphide (SLOS)
Mining method
underground
Material type
sulphide

Resource Data

Category
inferred
Tonnes
210000000
Grade
0.63
Grade Unit
g/t
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Inferred resource for gold within the SLOS mining method at Olympic Dam.

Positive factors

  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Resource is unchanged from prior reporting, indicating low novelty.
  • Inferred category indicates lower geological confidence and cannot support economic studies alone.

Evidence · table

“0.63”

Context: 210

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative category with limited drilling.

Evidence · table

“Inferred Resources”

Context: 210

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredOlympic Dam · silverTonnes: 210000000Grade: 3Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
silver
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
MP O’Hare
Resource group id
resource:82547eecd4630b6a46f5
Deposit or zone
UG Sulphide (SLOS)
Mining method
underground
Material type
sulphide

Resource Data

Category
inferred
Tonnes
210000000
Grade
3
Grade Unit
g/t
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-09-01

Metal Equivalent

Assumptions Disclosed
Yes

Lab

Laboratory
Intertek Group plc, Adelaide

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Inferred resource for silver within the SLOS mining method at Olympic Dam.

Positive factors

  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Resource is unchanged from prior reporting, indicating low novelty.
  • Inferred category indicates lower geological confidence and cannot support economic studies alone.

Evidence · table

“3”

Context: 210

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource is classified as Inferred, indicating a speculative category with limited drilling.

Evidence · table

“Inferred Resources”

Context: 210

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

provenOlympic Dam · copperTonnes: 355000000Grade: 1.89Grade Unit: %View all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
copper
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Naveen S Kinthada
Resource group id
resource:73861c849000a164f0cf
Deposit or zone
UG Sulphide
Mining method
underground
Material type
sulphide

Resource Data

Category
proven
Tonnes
355000000
Grade
1.89
Grade Unit
%
Cutoff Grade
1
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-06-30

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Proven reserve for UG Sulphide at Olympic Dam, maintaining high confidence.

Positive factors

  • High confidence category (Proven) for a significant reserve.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Reserve is unchanged from prior reporting, indicating low novelty.

Evidence · table

“1.89”

Context: 355

Tags used in scoring

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

provenOlympic Dam · uraniumTonnes: 355000000Grade: 0.59Grade Unit: kg/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
uranium
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Naveen S Kinthada
Resource group id
resource:73861c849000a164f0cf
Deposit or zone
UG Sulphide
Mining method
underground
Material type
sulphide

Resource Data

Category
proven
Tonnes
355000000
Grade
0.59
Grade Unit
kg/t
Cutoff Grade
1
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-06-30

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Proven reserve for uranium within UG Sulphide at Olympic Dam.

Positive factors

  • High confidence category (Proven) for a significant reserve.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Reserve is unchanged from prior reporting, indicating low novelty.

Evidence · table

“0.59”

Context: 355

Tags used in scoring

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

provenOlympic Dam · goldTonnes: 355000000Grade: 0.72Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
gold
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Naveen S Kinthada
Resource group id
resource:73861c849000a164f0cf
Deposit or zone
UG Sulphide
Mining method
underground
Material type
sulphide

Resource Data

Category
proven
Tonnes
355000000
Grade
0.72
Grade Unit
g/t
Cutoff Grade
1
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-06-30

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Proven reserve for gold within UG Sulphide at Olympic Dam.

Positive factors

  • High confidence category (Proven) for a significant reserve.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Reserve is unchanged from prior reporting, indicating low novelty.

Evidence · table

“0.72”

Context: 355

Tags used in scoring

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

provenOlympic Dam · silverTonnes: 355000000Grade: 4Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
silver
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Naveen S Kinthada
Resource group id
resource:73861c849000a164f0cf
Deposit or zone
UG Sulphide
Mining method
underground
Material type
sulphide

Resource Data

Category
proven
Tonnes
355000000
Grade
4
Grade Unit
g/t
Cutoff Grade
1
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-06-30

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Proven reserve for silver within UG Sulphide at Olympic Dam.

Positive factors

  • High confidence category (Proven) for a significant reserve.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Reserve is unchanged from prior reporting, indicating low novelty.

Evidence · table

“4”

Context: 355

Tags used in scoring

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

probableOlympic Dam · copperTonnes: 254000000Grade: 1.68Grade Unit: %View all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
copper
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Naveen S Kinthada
Resource group id
resource:6b40781c38b46dd255b7
Deposit or zone
UG Sulphide
Mining method
underground
Material type
sulphide

Resource Data

Category
probable
Tonnes
254000000
Grade
1.68
Grade Unit
%
Cutoff Grade
1
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-06-30

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Probable reserve for UG Sulphide at Olympic Dam, maintaining high confidence.

Positive factors

  • High confidence category (Probable) for a significant reserve.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Reserve is unchanged from prior reporting, indicating low novelty.

Evidence · table

“1.68”

Context: 254

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The reserve is classified as Probable, indicating reasonable economic viability.

Evidence · table

“Probable Ore Reserve”

Context: 254

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

probableOlympic Dam · uraniumTonnes: 254000000Grade: 0.53Grade Unit: kg/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
uranium
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Naveen S Kinthada
Resource group id
resource:6b40781c38b46dd255b7
Deposit or zone
UG Sulphide
Mining method
underground
Material type
sulphide

Resource Data

Category
probable
Tonnes
254000000
Grade
0.53
Grade Unit
kg/t
Cutoff Grade
1
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-06-30

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Probable reserve for uranium within UG Sulphide at Olympic Dam.

Positive factors

  • High confidence category (Probable) for a significant reserve.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Reserve is unchanged from prior reporting, indicating low novelty.

Evidence · table

“0.53”

Context: 254

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The reserve is classified as Probable, indicating reasonable economic viability.

Evidence · table

“Probable Ore Reserve”

Context: 254

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

probableOlympic Dam · goldTonnes: 254000000Grade: 0.62Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
gold
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Naveen S Kinthada
Resource group id
resource:6b40781c38b46dd255b7
Deposit or zone
UG Sulphide
Mining method
underground
Material type
sulphide

Resource Data

Category
probable
Tonnes
254000000
Grade
0.62
Grade Unit
g/t
Cutoff Grade
1
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-06-30

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Probable reserve for gold within UG Sulphide at Olympic Dam.

Positive factors

  • High confidence category (Probable) for a significant reserve.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Reserve is unchanged from prior reporting, indicating low novelty.

Evidence · table

“0.62”

Context: 254

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The reserve is classified as Probable, indicating reasonable economic viability.

Evidence · table

“Probable Ore Reserve”

Context: 254

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

probableOlympic Dam · silverTonnes: 254000000Grade: 3Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
silver
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Naveen S Kinthada
Resource group id
resource:6b40781c38b46dd255b7
Deposit or zone
UG Sulphide
Mining method
underground
Material type
sulphide

Resource Data

Category
probable
Tonnes
254000000
Grade
3
Grade Unit
g/t
Cutoff Grade
1
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-06-30

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Probable reserve for silver within UG Sulphide at Olympic Dam.

Positive factors

  • High confidence category (Probable) for a significant reserve.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Reserve is unchanged from prior reporting, indicating low novelty.

Evidence · table

“3”

Context: 254

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The reserve is classified as Probable, indicating reasonable economic viability.

Evidence · table

“Probable Ore Reserve”

Context: 254

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

probableOlympic Dam · copperTonnes: 44000000Grade: 0.83Grade Unit: %View all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
copper
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Naveen S Kinthada
Resource group id
resource:d69d2c7b16c5dfb74a19
Deposit or zone
Low grade
Mining method
underground
Material type
Low grade

Resource Data

Category
probable
Tonnes
44000000
Grade
0.83
Grade Unit
%
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-06-30

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Probable reserve for Low grade material at Olympic Dam, maintaining high confidence.

Positive factors

  • High confidence category (Probable) for a significant reserve.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Reserve is unchanged from prior reporting, indicating low novelty.

Evidence · table

“0.83”

Context: 44

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The reserve is classified as Probable, indicating reasonable economic viability.

Evidence · table

“Probable Ore Reserve”

Context: 44

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

probableOlympic Dam · uraniumTonnes: 44000000Grade: 0.28Grade Unit: kg/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
uranium
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Naveen S Kinthada
Resource group id
resource:d69d2c7b16c5dfb74a19
Deposit or zone
Low grade
Mining method
underground
Material type
Low grade

Resource Data

Category
probable
Tonnes
44000000
Grade
0.28
Grade Unit
kg/t
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-06-30

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Probable reserve for uranium within Low grade material at Olympic Dam.

Positive factors

  • High confidence category (Probable) for a significant reserve.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Reserve is unchanged from prior reporting, indicating low novelty.

Evidence · table

“0.28”

Context: 44

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The reserve is classified as Probable, indicating reasonable economic viability.

Evidence · table

“Probable Ore Reserve”

Context: 44

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

probableOlympic Dam · goldTonnes: 44000000Grade: 0.34Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
gold
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Naveen S Kinthada
Resource group id
resource:d69d2c7b16c5dfb74a19
Deposit or zone
Low grade
Mining method
underground
Material type
Low grade

Resource Data

Category
probable
Tonnes
44000000
Grade
0.34
Grade Unit
g/t
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-06-30

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Probable reserve for gold within Low grade material at Olympic Dam.

Positive factors

  • High confidence category (Probable) for a significant reserve.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Reserve is unchanged from prior reporting, indicating low novelty.

Evidence · table

“0.34”

Context: 44

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The reserve is classified as Probable, indicating reasonable economic viability.

Evidence · table

“Probable Ore Reserve”

Context: 44

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

probableOlympic Dam · silverTonnes: 44000000Grade: 2Grade Unit: g/tView all details
Link to this fact

Identity

Project
Olympic Dam
Commodity
silver
Region
australia_sa
Reported Region
South Australia
Ticker
BHP

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Naveen S Kinthada
Resource group id
resource:d69d2c7b16c5dfb74a19
Deposit or zone
Low grade
Mining method
underground
Material type
Low grade

Resource Data

Category
probable
Tonnes
44000000
Grade
2
Grade Unit
g/t
Cutoff Grade
0.6
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-06-30

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-19T00:00:00.000Z

Reasoning: Restatement of an existing Probable reserve for silver within Low grade material at Olympic Dam.

Positive factors

  • High confidence category (Probable) for a significant reserve.
  • JORC compliant and QP signed, indicating high reporting standards.

Negative factors

  • Reserve is unchanged from prior reporting, indicating low novelty.

Evidence · table

“2”

Context: 44

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The reserve is classified as Probable, indicating reasonable economic viability.

Evidence · table

“Probable Ore Reserve”

Context: 44

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.