Banyan Gold Files Technical Report for AurMac Project, Yukon, Canada

Original announcement by orestocks on

Company
Banyan Gold Corp.
Ticker
BYN
Exchange
TSXV
Region
Yukon, Canada
Primary commodity
Gold
Secondary commodities
Silver
Document categories
Resource update
Extracted
2026-10-01 02:32:54 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Banyan Gold has filed a Technical Report supporting an updated Mineral Resource Estimate for the AurMac Project in Yukon. The updated MRE includes an Indicated resource of 3.64 million oz of gold and an Inferred resource of 4.98 million oz of gold.

Reasoning: The updated MRE provides a substantial gold resource across two deposits, with a high-confidence Indicated component for the Airstrip and Powerline deposits.

Positive factors

  • Significant gold resource scale
  • High M&I percentage for the combined project
  • NI 43-101 compliant technical report filed

Negative factors

  • Large Inferred component (approx 60% of total metal)

Facts used in scoring: 6

Classification and evidence

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: The Technical Report was prepared in accordance with NI 43-101 standards.

Evidence · text

“in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ( "CIM" ) Definition Standard incorporated by the reference in National Instrument 43-101”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: A significant portion of the resource is classified as Inferred.

Evidence · text

“an Inferred Mineral Resource of 4.98 M oz of Au”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Qualified Persons are named and have reviewed/approved the disclosure.

Evidence · text

“Duncan Mackay, M.Sc., P.Geo., is a " Qualified Person" as defined under National Instrument 43-101”

Extracted facts

Stored fact records: 6. Some facts used in scoring do not have a stored record.

Resource Estimates (6)

indicatedAurMac · goldTonnes: 37700000Grade: 0.69Grade Unit: g/tContained Metal: 0.84Contained Unit: m ozView all details
Link to this fact

Identity

Project
AurMac
Commodity
gold
Region
canada_yt
Reported Region
Yukon, Canada
Ticker
BYN

Resource scope

Estimate type
resource
Effective date
2026-05-15T00:00:00.000Z
Reporting standards
ni_43_101
Resource group id
resource:e4e4567733d25a90b1e8
Deposit or zone
Airstrip
Mining method
open_pit
Ownership percent
100 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
37700000
Grade
0.69
Grade Unit
g/t
Contained Metal
0.84
Contained Unit
m oz
Cutoff Grade
0.3
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-05-15

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-27T00:00:00.000Z

Reasoning: Standard indicated resource for the Airstrip deposit.

Positive factors

  • Indicated category provides high geological confidence

Evidence · table

“0.69”

Context: 37.7

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedAurMac · goldTonnes: 129500000Grade: 0.67Grade Unit: g/tContained Metal: 2.799Contained Unit: m ozView all details
Link to this fact

Identity

Project
AurMac
Commodity
gold
Region
canada_yt
Reported Region
Yukon, Canada
Ticker
BYN

Resource scope

Estimate type
resource
Effective date
2026-05-15T00:00:00.000Z
Reporting standards
ni_43_101
Resource group id
resource:21bf4a7123fda03689f9
Deposit or zone
Powerline
Mining method
open_pit
Ownership percent
100 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
129500000
Grade
0.67
Grade Unit
g/t
Contained Metal
2.799
Contained Unit
m oz
Cutoff Grade
0.3
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-05-15

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-27T00:00:00.000Z

Reasoning: Strong indicated resource component for the Powerline deposit.

Positive factors

  • Significant tonnage and contained gold

Evidence · table

“0.67”

Context: 129.5

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

indicatedAurMac · goldTonnes: 167300000Grade: 0.68Grade Unit: g/tContained Metal: 3.639Contained Unit: m ozView all details
Link to this fact

Identity

Project
AurMac
Commodity
gold
Region
canada_yt
Reported Region
Yukon, Canada
Ticker
BYN

Resource scope

Estimate type
resource
Effective date
2026-05-15T00:00:00.000Z
Reporting standards
ni_43_101
Resource group id
resource:49deee11e8b50eea25c6
Deposit or zone
Combined
Mining method
open_pit
Ownership percent
100 %
Resource basis
gross

Resource Data

Category
indicated
Tonnes
167300000
Grade
0.68
Grade Unit
g/t
Contained Metal
3.639
Contained Unit
m oz
Cutoff Grade
0.3
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-05-15

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-27T00:00:00.000Z

Reasoning: Combined indicated resource for the project.

Positive factors

  • Large scale indicated resource

Evidence · table

“0.68”

Context: 167.3

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredAurMac · goldTonnes: 15100000Grade: 0.84Grade Unit: g/tContained Metal: 0.405Contained Unit: m ozView all details
Link to this fact

Identity

Project
AurMac
Commodity
gold
Region
canada_yt
Reported Region
Yukon, Canada
Ticker
BYN

Resource scope

Estimate type
resource
Effective date
2026-05-15T00:00:00.000Z
Reporting standards
ni_43_101
Resource group id
resource:c1034b97315588fb36df
Deposit or zone
Airstrip
Mining method
open_pit
Ownership percent
100 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
15100000
Grade
0.84
Grade Unit
g/t
Contained Metal
0.405
Contained Unit
m oz
Cutoff Grade
0.3
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-05-15

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-27T00:00:00.000Z

Reasoning: Inferred resource for Airstrip.

Positive factors

  • Higher grade than indicated component

Negative factors

  • Inferred category implies lower geological confidence

Evidence · table

“0.84”

Context: 15.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredAurMac · goldTonnes: 252100000Grade: 0.57Grade Unit: g/tContained Metal: 4.58Contained Unit: m ozView all details
Link to this fact

Identity

Project
AurMac
Commodity
gold
Region
canada_yt
Reported Region
Yukon, Canada
Ticker
BYN

Resource scope

Estimate type
resource
Effective date
2026-05-15T00:00:00.000Z
Reporting standards
ni_43_101
Resource group id
resource:51412b947798b9c76b1b
Deposit or zone
Powerline
Mining method
open_pit
Ownership percent
100 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
252100000
Grade
0.57
Grade Unit
g/t
Contained Metal
4.58
Contained Unit
m oz
Cutoff Grade
0.3
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-05-15

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-27T00:00:00.000Z

Reasoning: Inferred resource for Powerline.

Positive factors

  • Large tonnage contribution

Negative factors

  • Inferred category implies lower geological confidence

Evidence · table

“0.57”

Context: 252.1

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

inferredAurMac · goldTonnes: 267200000Grade: 0.58Grade Unit: g/tContained Metal: 4.985Contained Unit: m ozView all details
Link to this fact

Identity

Project
AurMac
Commodity
gold
Region
canada_yt
Reported Region
Yukon, Canada
Ticker
BYN

Resource scope

Estimate type
resource
Effective date
2026-05-15T00:00:00.000Z
Reporting standards
ni_43_101
Resource group id
resource:0b02bdd6d3f50a165686
Deposit or zone
Combined
Mining method
open_pit
Ownership percent
100 %
Resource basis
gross

Resource Data

Category
inferred
Tonnes
267200000
Grade
0.58
Grade Unit
g/t
Contained Metal
4.985
Contained Unit
m oz
Cutoff Grade
0.3
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-05-15

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-27T00:00:00.000Z

Reasoning: Combined inferred resource for the project.

Positive factors

  • Large total inferred resource

Negative factors

  • High proportion of inferred material

Evidence · table

“0.58”

Context: 267.2

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.