# Aztec Drilling Expands Oxide Gold-Silver Zone at Tombstone Project, Arizona; intersecting 0.62 gpt Au and 24.8 gpt Ag over 107.9m in Westside Area and 0.48 gpt Au and 12.6 gpt Ag over 112.5m at Contention Area

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43

Original source: https://money.tmx.com/en/quote/AZT/news/8355134282144014/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter

Publisher: tmx

Original announcement: 2026-04-15T11:00:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: Unknown date

Atlas analysis updated: Unknown date

- Company: Aztec Minerals Corp.

- Ticker: AZT

- Exchange: TSX

- Region: Arizona

- Primary commodity: Gold

- Secondary commodities: Silver

- Document categories: Drill results

- Extracted: 2026-08-24 06:13:01 UTC

Narrative sentiment: 0.70 · Bullish

## Minestarters Atlas summary

Aztec Minerals announced drill results from 14 RC holes at its Tombstone Project in Arizona, expanding the oxide gold-silver zones in the Westside and Contention areas. Notable intercepts include 107.9m at 0.62 g/t Au and 24.8 g/t Ag in the Westside Area, and 112.5m at 0.48 g/t Au and 12.6 g/t Ag in the Contention Area. The company highlights the potential for significant growth of near-surface, bulk tonnage, heap leachable mineralization through successful step-out drilling.

Reasoning: The drill program successfully expanded the oxide gold-silver zones at the Tombstone Project with several wide, continuous intercepts, particularly in the Westside and Contention areas. While some individual grades are below historical averages, the significant widths and step-out nature of the drilling indicate strong potential for bulk tonnage, heap leachable resources, supported by robust QA/QC.

- Positive factor: Wide, continuous intercepts expanding known mineralization

- Positive factor: Step-out drilling successfully extends oxide gold-silver zones

- Positive factor: Potential for significant growth of near-surface, bulk tonnage, heap leachable mineralization

- Positive factor: QA/QC procedures and QP sign-off disclosed

- Negative factor: All reported intersection lengths are apparent widths, not true widths

- Negative factor: Some individual gold and silver grades are below the project's historical average

Facts used in scoring: 86

## Classification and evidence

**Step-Out Extension**

Polarity: positive

Definition: Mineralization extended beyond the previously known limit.

Why it applies: The document explicitly states 'Step-Out Drilling Continues to Expand the Contention and Westside zones' and 'expand the Contention Main target area to the west and depth'.

Evidence · text

> Step-Out Drilling Continues to Expand the Contention and Westside zones of Oxide Au/Ag Mineralization

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: The release mentions that samples are analyzed by Bureau Veritas, a third-party lab, and that the company uses a standard QAQC program including certified blanks, standards, and duplicates, with review by a Qualified Person.

Evidence · text

> The samples are analyzed by Bureau Veritas for gold with a 30-gram sample size using the method FA430 followed by MA300. Bureau Veritas is independent of the Company and of the Qualified Person. Over limits, when present, are analyzed by MA370 or FA530. The company uses quality assurance-quality control as a standard part of its sampling-assaying-assessments in conjunction with its exploration sampling programs. Samples and their collection are controlled by an industry standard conforming QAQC program including all drill holes containing certified blanks, standards, and duplicates. The samples are being regularly shipped to and received by the Bureau Veritas Minerals laboratory in Hermosillo, Mexico for geochemical analysis. The QAQC for the drilling programs has been evaluated and found to have good results. The scientific and technical information contained in this news release has been reviewed and approved by Allen David Heyl, B.Sc., CPG - AIPG No.11277, VP Exploration of Aztec, a Qualified Person under NI43-101.

**Apparent Width Only**

Polarity: negative

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: The document explicitly states that 'All reported intersection lengths are apparent widths of mineralization, not true widths'.

Evidence · text

> All reported intersection lengths are apparent widths of mineralization, not true widths, which can range at the property from 30% to 100% of apparent widths.

## Extracted facts

Stored fact records: 86. Some facts used in scoring do not have a stored record.

## Drill Results (86)

### TR26-01

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-0)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-01
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.038
- Grade Unit: g/t
- Intercept: 22.8 m
- From: 51.7 m
- To: 74.5 m
- Hole Depth: 117.4 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-01:51.7-74.5
- Mining Method: open\_pit

#### Location

- Easting: 588429
- Northing: 3508259
- Azimuth: 40 °
- Dip: 70 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.038 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, and the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.038

Context: 22.8

### TR26-01

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-1)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-01
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 11.76
- Grade Unit: g/t
- Intercept: 22.8 m
- From: 51.7 m
- To: 74.5 m
- Hole Depth: 117.4 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-01:51.7-74.5
- Mining Method: open\_pit

#### Location

- Easting: 588429
- Northing: 3508259
- Azimuth: 40 °
- Dip: 70 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 11.76 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, and the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 11.76

Context: 22.8

### TR26-01

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-2)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-01
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.039
- Grade Unit: g/t
- Intercept: 24.3 m
- From: 86.6 m
- To: 110.9 m
- Hole Depth: 117.4 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-01:86.6-110.9
- Mining Method: open\_pit

#### Location

- Easting: 588429
- Northing: 3508259
- Azimuth: 40 °
- Dip: 70 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.039 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, and the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.039

Context: 24.3

### TR26-01

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-3)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-01
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 13.37
- Grade Unit: g/t
- Intercept: 24.3 m
- From: 86.6 m
- To: 110.9 m
- Hole Depth: 117.4 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-01:86.6-110.9
- Mining Method: open\_pit

#### Location

- Easting: 588429
- Northing: 3508259
- Azimuth: 40 °
- Dip: 70 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 13.37 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, and the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 13.37

Context: 24.3

### TR26-02

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-4)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-02
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.136
- Grade Unit: g/t
- Intercept: 19.8 m
- From: 0 m
- To: 19.8 m
- Hole Depth: 231.7 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-02:0.0-19.8
- Mining Method: open\_pit

#### Location

- Easting: 588463
- Northing: 3507996
- Azimuth: 10 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.136 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.136

Context: 19.8

### TR26-02

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-5)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-02
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 12.62
- Grade Unit: g/t
- Intercept: 19.8 m
- From: 0 m
- To: 19.8 m
- Hole Depth: 231.7 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-02:0.0-19.8
- Mining Method: open\_pit

#### Location

- Easting: 588463
- Northing: 3507996
- Azimuth: 10 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 12.62 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 12.62

Context: 19.8

### TR26-02

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-6)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-02
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.088
- Grade Unit: g/t
- Intercept: 6.1 m
- From: 54.7 m
- To: 60.8 m
- Hole Depth: 231.7 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-02:54.7-60.8
- Mining Method: open\_pit

#### Location

- Easting: 588463
- Northing: 3507996
- Azimuth: 10 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.088 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.088

Context: 6.1

### TR26-02

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-7)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-02
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 13.67
- Grade Unit: g/t
- Intercept: 6.1 m
- From: 54.7 m
- To: 60.8 m
- Hole Depth: 231.7 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-02:54.7-60.8
- Mining Method: open\_pit

#### Location

- Easting: 588463
- Northing: 3507996
- Azimuth: 10 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 13.67 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 13.67

Context: 6.1

### TR26-02

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-8)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-02
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.094
- Grade Unit: g/t
- Intercept: 9.1 m
- From: 91.2 m
- To: 100.3 m
- Hole Depth: 231.7 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-02:91.2-100.3
- Mining Method: open\_pit

#### Location

- Easting: 588463
- Northing: 3507996
- Azimuth: 10 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.094 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.094

Context: 9.1

### TR26-02

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-9)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-02
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 5.65
- Grade Unit: g/t
- Intercept: 9.1 m
- From: 91.2 m
- To: 100.3 m
- Hole Depth: 231.7 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-02:91.2-100.3
- Mining Method: open\_pit

#### Location

- Easting: 588463
- Northing: 3507996
- Azimuth: 10 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 5.65 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 5.65

Context: 9.1

### TR26-02

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-10)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-02
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.076
- Grade Unit: g/t
- Intercept: 16.7 m
- From: 130.7 m
- To: 147.4 m
- Hole Depth: 231.7 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-02:130.7-147.4
- Mining Method: open\_pit

#### Location

- Easting: 588463
- Northing: 3507996
- Azimuth: 10 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.076 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.076

Context: 16.7

### TR26-02

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-11)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-02
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 2.76
- Grade Unit: g/t
- Intercept: 16.7 m
- From: 130.7 m
- To: 147.4 m
- Hole Depth: 231.7 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-02:130.7-147.4
- Mining Method: open\_pit

#### Location

- Easting: 588463
- Northing: 3507996
- Azimuth: 10 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 2.76 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 2.76

Context: 16.7

### TR26-03

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-12)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-03
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.069
- Grade Unit: g/t
- Intercept: 13.7 m
- From: 147.4 m
- To: 161.1 m
- Hole Depth: 274.4 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-03:147.4-161.1
- Mining Method: open\_pit

#### Location

- Easting: 588670
- Northing: 3508001
- Azimuth: 105 °
- Dip: 80 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.069 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.069

Context: 13.7

### TR26-03

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-13)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-03
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 3.73
- Grade Unit: g/t
- Intercept: 13.7 m
- From: 147.4 m
- To: 161.1 m
- Hole Depth: 274.4 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-03:147.4-161.1
- Mining Method: open\_pit

#### Location

- Easting: 588670
- Northing: 3508001
- Azimuth: 105 °
- Dip: 80 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 3.73 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 3.73

Context: 13.7

### TR26-03

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-14)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-03
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.103
- Grade Unit: g/t
- Intercept: 10.6 m
- From: 167.2 m
- To: 177.8 m
- Hole Depth: 274.4 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-03:167.2-177.8
- Mining Method: open\_pit

#### Location

- Easting: 588670
- Northing: 3508001
- Azimuth: 105 °
- Dip: 80 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.103 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.103

Context: 10.6

### TR26-03

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-15)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-03
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 7.21
- Grade Unit: g/t
- Intercept: 10.6 m
- From: 167.2 m
- To: 177.8 m
- Hole Depth: 274.4 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-03:167.2-177.8
- Mining Method: open\_pit

#### Location

- Easting: 588670
- Northing: 3508001
- Azimuth: 105 °
- Dip: 80 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 7.21 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 7.21

Context: 10.6

### TR26-03

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-16)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-03
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.149
- Grade Unit: g/t
- Intercept: 12.2 m
- From: 193 m
- To: 205.2 m
- Hole Depth: 274.4 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-03:193.0-205.2
- Mining Method: open\_pit

#### Location

- Easting: 588670
- Northing: 3508001
- Azimuth: 105 °
- Dip: 80 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.149 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.149

Context: 12.2

### TR26-03

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-17)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-03
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 8.7
- Grade Unit: g/t
- Intercept: 12.2 m
- From: 193 m
- To: 205.2 m
- Hole Depth: 274.4 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-03:193.0-205.2
- Mining Method: open\_pit

#### Location

- Easting: 588670
- Northing: 3508001
- Azimuth: 105 °
- Dip: 80 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 8.7 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 8.7

Context: 12.2

### TR26-04

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-18)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-04
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.057
- Grade Unit: g/t
- Intercept: 10.6 m
- From: 53.2 m
- To: 63.8 m
- Hole Depth: 207.3 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-04:53.2-63.8
- Mining Method: open\_pit

#### Location

- Easting: 588712
- Northing: 3508065
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.057 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.057

Context: 10.6

### TR26-04

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-19)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-04
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 8.17
- Grade Unit: g/t
- Intercept: 10.6 m
- From: 53.2 m
- To: 63.8 m
- Hole Depth: 207.3 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-04:53.2-63.8
- Mining Method: open\_pit

#### Location

- Easting: 588712
- Northing: 3508065
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 8.17 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 8.17

Context: 10.6

### TR26-04

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-20)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-04
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.04
- Grade Unit: g/t
- Intercept: 13.7 m
- From: 147.4 m
- To: 161.1 m
- Hole Depth: 207.3 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-04:147.4-161.1
- Mining Method: open\_pit

#### Location

- Easting: 588712
- Northing: 3508065
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.04 g/t is at the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.040

Context: 13.7

### TR26-04

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-21)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-04
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 4.16
- Grade Unit: g/t
- Intercept: 13.7 m
- From: 147.4 m
- To: 161.1 m
- Hole Depth: 207.3 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-04:147.4-161.1
- Mining Method: open\_pit

#### Location

- Easting: 588712
- Northing: 3508065
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 4.16 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 4.16

Context: 13.7

### TR26-04

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-22)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-04
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.22
- Grade Unit: g/t
- Intercept: 19.8 m
- From: 168.7 m
- To: 188.5 m
- Hole Depth: 207.3 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-04:168.7-188.5
- Mining Method: open\_pit

#### Location

- Easting: 588712
- Northing: 3508065
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.22 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.220

Context: 19.8

### TR26-04

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-23)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-04
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 13.75
- Grade Unit: g/t
- Intercept: 19.8 m
- From: 168.7 m
- To: 188.5 m
- Hole Depth: 207.3 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-04:168.7-188.5
- Mining Method: open\_pit

#### Location

- Easting: 588712
- Northing: 3508065
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 13.75 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 13.75

Context: 19.8

### TR26-05

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-24)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-05
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.223
- Grade Unit: g/t
- Intercept: 19.8 m
- From: 16.7 m
- To: 36.5 m
- Hole Depth: 256.1 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-05:16.7-36.5
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507804
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.223 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.223

Context: 19.8

### TR26-05

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-25)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-05
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 8.78
- Grade Unit: g/t
- Intercept: 19.8 m
- From: 16.7 m
- To: 36.5 m
- Hole Depth: 256.1 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-05:16.7-36.5
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507804
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 8.78 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 8.78

Context: 19.8

### TR26-05

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-26)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-05
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.117
- Grade Unit: g/t
- Intercept: 12.2 m
- From: 60.8 m
- To: 73 m
- Hole Depth: 256.1 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-05:60.8-73.0
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507804
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.117 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.117

Context: 12.2

### TR26-05

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-27)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-05
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 3.85
- Grade Unit: g/t
- Intercept: 12.2 m
- From: 60.8 m
- To: 73 m
- Hole Depth: 256.1 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-05:60.8-73.0
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507804
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 3.85 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 3.85

Context: 12.2

### TR26-05

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-28)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-05
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.112
- Grade Unit: g/t
- Intercept: 50.2 m
- From: 80.6 m
- To: 130.7 m
- Hole Depth: 256.1 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-05:80.6-130.7
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507804
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.112 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. However, the intercept width is continuous, contributing to bulk tonnage potential in a step-out hole.

- Positive factor: Continuous Intercept

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.112

Context: 50.2

### TR26-05

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-29)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-05
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 4.9
- Grade Unit: g/t
- Intercept: 50.2 m
- From: 80.6 m
- To: 130.7 m
- Hole Depth: 256.1 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-05:80.6-130.7
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507804
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 4.9 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. However, the intercept width is continuous, contributing to bulk tonnage potential in a step-out hole.

- Positive factor: Continuous Intercept

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 4.90

Context: 50.2

### TR26-05

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-30)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-05
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.117
- Grade Unit: g/t
- Intercept: 21.3 m
- From: 136.8 m
- To: 158.1 m
- Hole Depth: 256.1 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-05:136.8-158.1
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507804
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.117 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Strong Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.117

Context: 21.3

### TR26-05

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-31)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-05
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 11.44
- Grade Unit: g/t
- Intercept: 21.3 m
- From: 136.8 m
- To: 158.1 m
- Hole Depth: 256.1 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-05:136.8-158.1
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507804
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 11.44 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Strong Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 11.44

Context: 21.3

### TR26-05

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-32)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-05
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.086
- Grade Unit: g/t
- Intercept: 9.1 m
- From: 165.7 m
- To: 174.8 m
- Hole Depth: 256.1 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-05:165.7-174.8
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507804
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.086 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.086

Context: 9.1

### TR26-05

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-33)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-05
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 4.65
- Grade Unit: g/t
- Intercept: 9.1 m
- From: 165.7 m
- To: 174.8 m
- Hole Depth: 256.1 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-05:165.7-174.8
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507804
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 4.65 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 4.65

Context: 9.1

### TR26-05

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-34)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-05
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.119
- Grade Unit: g/t
- Intercept: 35 m
- From: 182.4 m
- To: 217.4 m
- Hole Depth: 256.1 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-05:182.4-217.4
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507804
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.119 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. However, the intercept width is strong, contributing to bulk tonnage potential in a step-out hole.

- Positive factor: Strong Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.119

Context: 35.0

### TR26-05

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-35)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-05
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 5.95
- Grade Unit: g/t
- Intercept: 35 m
- From: 182.4 m
- To: 217.4 m
- Hole Depth: 256.1 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-05:182.4-217.4
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507804
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 5.95 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. However, the intercept width is strong, contributing to bulk tonnage potential in a step-out hole.

- Positive factor: Strong Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 5.95

Context: 35.0

### TR26-05

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-36)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-05
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.091
- Grade Unit: g/t
- Intercept: 24.3 m
- From: 231 m
- To: 255.3 m
- Hole Depth: 256.1 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-05:231.0-255.3
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507804
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.091 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Strong Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.091

Context: 24.3

### TR26-05

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-37)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-05
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 3.6
- Grade Unit: g/t
- Intercept: 24.3 m
- From: 231 m
- To: 255.3 m
- Hole Depth: 256.1 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-05:231.0-255.3
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507804
- Azimuth: 105 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 3.6 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Strong Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 3.6

Context: 24.3

### TR26-06

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-38)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-06
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.124
- Grade Unit: g/t
- Intercept: 15.2 m
- From: 31.9 m
- To: 47.1 m
- Hole Depth: 262.2 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-06:31.9-47.1
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507751
- Azimuth: 105 °
- Dip: 65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.124 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.124

Context: 15.2

### TR26-06

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-39)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-06
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 4.06
- Grade Unit: g/t
- Intercept: 15.2 m
- From: 31.9 m
- To: 47.1 m
- Hole Depth: 262.2 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-06:31.9-47.1
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507751
- Azimuth: 105 °
- Dip: 65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 4.06 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 4.06

Context: 15.2

### TR26-06

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-40)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-06
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.223
- Grade Unit: g/t
- Intercept: 7.6 m
- From: 62.3 m
- To: 69.9 m
- Hole Depth: 262.2 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-06:62.3-69.9
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507751
- Azimuth: 105 °
- Dip: 65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.223 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.223

Context: 7.6

### TR26-06

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-41)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-06
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 11.66
- Grade Unit: g/t
- Intercept: 7.6 m
- From: 62.3 m
- To: 69.9 m
- Hole Depth: 262.2 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-06:62.3-69.9
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507751
- Azimuth: 105 °
- Dip: 65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 11.66 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 11.66

Context: 7.6

### TR26-06

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-42)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-06
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.159
- Grade Unit: g/t
- Intercept: 31.9 m
- From: 88.2 m
- To: 120.1 m
- Hole Depth: 262.2 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-06:88.2-120.1
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507751
- Azimuth: 105 °
- Dip: 65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.159 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. However, the intercept width is strong, contributing to bulk tonnage potential in a step-out hole.

- Positive factor: Strong Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.159

Context: 31.9

### TR26-06

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-43)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-06
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 3.86
- Grade Unit: g/t
- Intercept: 31.9 m
- From: 88.2 m
- To: 120.1 m
- Hole Depth: 262.2 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-06:88.2-120.1
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507751
- Azimuth: 105 °
- Dip: 65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 3.86 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. However, the intercept width is strong, contributing to bulk tonnage potential in a step-out hole.

- Positive factor: Strong Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 3.86

Context: 31.9

### TR26-06

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-44)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-06
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.057
- Grade Unit: g/t
- Intercept: 27.4 m
- From: 130.7 m
- To: 158.1 m
- Hole Depth: 262.2 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-06:130.7-158.1
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507751
- Azimuth: 105 °
- Dip: 65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.057 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Strong Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.057

Context: 27.4

### TR26-06

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-45)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-06
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 29.22
- Grade Unit: g/t
- Intercept: 27.4 m
- From: 130.7 m
- To: 158.1 m
- Hole Depth: 262.2 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-06:130.7-158.1
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507751
- Azimuth: 105 °
- Dip: 65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 29.22 g/t is just below the weak threshold \(30 g/t\) and significantly below the project average. However, the intercept width is strong, contributing to bulk tonnage potential in a step-out hole.

- Positive factor: Strong Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 29.22

Context: 27.4

### TR26-06

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-46)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-06
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.104
- Grade Unit: g/t
- Intercept: 59.3 m
- From: 202.2 m
- To: 261.5 m
- Hole Depth: 262.2 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-06:202.2-261.5
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507751
- Azimuth: 105 °
- Dip: 65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.104 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. However, the intercept width is continuous, contributing to bulk tonnage potential in a step-out hole.

- Positive factor: Continuous Intercept

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.104

Context: 59.3

### TR26-06

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-47)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-06
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 4.96
- Grade Unit: g/t
- Intercept: 59.3 m
- From: 202.2 m
- To: 261.5 m
- Hole Depth: 262.2 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-06:202.2-261.5
- Mining Method: open\_pit

#### Location

- Easting: 588625
- Northing: 3507751
- Azimuth: 105 °
- Dip: 65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 4.96 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. However, the intercept width is continuous, contributing to bulk tonnage potential in a step-out hole.

- Positive factor: Continuous Intercept

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 4.96

Context: 59.3

### TR26-07

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-48)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-07
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.479
- Grade Unit: g/t
- Intercept: 111.5 m
- From: 50.2 m
- To: 162.6 m
- Hole Depth: 239.3 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-07:50.2-162.6
- Mining Method: open\_pit

#### Location

- Easting: 588792
- Northing: 3507896
- Azimuth: 100 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.479 g/t is above the weak threshold for open pit gold \(0.4 g/t\) and represents a significant width of continuous mineralization \(111.5m\), contributing to bulk tonnage potential. The GT value is strong \(53.4 g/t\*m\). While below the project average grade, the width and step-out nature are positive.

- Positive factor: Continuous Intercept

- Positive factor: Step-Out Extension

- Positive factor: Gold Grade above weak threshold

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Gold Grade below project average

Evidence · table

> 0.479

Context: 111.5

### TR26-07

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-49)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-07
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 12.64
- Grade Unit: g/t
- Intercept: 111.5 m
- From: 50.2 m
- To: 162.6 m
- Hole Depth: 239.3 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-07:50.2-162.6
- Mining Method: open\_pit

#### Location

- Easting: 588792
- Northing: 3507896
- Azimuth: 100 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 12.64 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. However, the intercept width is continuous \(111.5m\), and the GT value is moderate-strong \(1411 g/t\*m\), contributing to bulk tonnage potential. The step-out nature adds novelty.

- Positive factor: Continuous Intercept

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 12.64

Context: 111.5

### TR26-07

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-50)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-07
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.127
- Grade Unit: g/t
- Intercept: 12.2 m
- From: 173.2 m
- To: 185.4 m
- Hole Depth: 239.3 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-07:173.2-185.4
- Mining Method: open\_pit

#### Location

- Easting: 588792
- Northing: 3507896
- Azimuth: 100 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.127 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.127

Context: 12.2

### TR26-07

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-51)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-07
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 8.11
- Grade Unit: g/t
- Intercept: 12.2 m
- From: 173.2 m
- To: 185.4 m
- Hole Depth: 239.3 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-07:173.2-185.4
- Mining Method: open\_pit

#### Location

- Easting: 588792
- Northing: 3507896
- Azimuth: 100 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 8.11 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 8.11

Context: 12.2

### TR26-07

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-52)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-07
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.049
- Grade Unit: g/t
- Intercept: 16.7 m
- From: 221.9 m
- To: 238.6 m
- Hole Depth: 239.3 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-07:221.9-238.6
- Mining Method: open\_pit

#### Location

- Easting: 588792
- Northing: 3507896
- Azimuth: 100 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.049 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.049

Context: 16.7

### TR26-07

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-53)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-07
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 7.49
- Grade Unit: g/t
- Intercept: 16.7 m
- From: 221.9 m
- To: 238.6 m
- Hole Depth: 239.3 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-07:221.9-238.6
- Mining Method: open\_pit

#### Location

- Easting: 588792
- Northing: 3507896
- Azimuth: 100 °
- Dip: 60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 7.49 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is strong, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 7.49

Context: 16.7

### TR26-08

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-54)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-08
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.576
- Grade Unit: g/t
- Intercept: 7.6 m
- From: 121.6 m
- To: 129.2 m
- Hole Depth: 175.3 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-08:121.6-129.2
- Mining Method: open\_pit

#### Location

- Easting: 588445
- Northing: 3508184
- Azimuth: 18 °
- Dip: 65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.576 g/t is above the weak threshold for open pit gold \(0.4 g/t\) and represents a moderate width \(7.6m\). The GT value is moderate \(4.38 g/t\*m\). While below the project average grade, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Gold Grade above weak threshold

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Gold Grade below project average

Evidence · table

> 0.576

Context: 7.6

### TR26-08

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-55)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-08
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 8.4
- Grade Unit: g/t
- Intercept: 7.6 m
- From: 121.6 m
- To: 129.2 m
- Hole Depth: 175.3 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-08:121.6-129.2
- Mining Method: open\_pit

#### Location

- Easting: 588445
- Northing: 3508184
- Azimuth: 18 °
- Dip: 65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 8.4 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 8.4

Context: 7.6

### TR26-09

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-56)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-09
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.069
- Grade Unit: g/t
- Intercept: 10.6 m
- From: 35 m
- To: 45.6 m
- Hole Depth: 219.5 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-09:35.0-45.6
- Mining Method: open\_pit

#### Location

- Easting: 588487
- Northing: 3508275
- Azimuth: 114 °
- Dip: -65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.069 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.069

Context: 10.6

### TR26-09

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-57)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-09
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 9.06
- Grade Unit: g/t
- Intercept: 10.6 m
- From: 35 m
- To: 45.6 m
- Hole Depth: 219.5 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-09:35.0-45.6
- Mining Method: open\_pit

#### Location

- Easting: 588487
- Northing: 3508275
- Azimuth: 114 °
- Dip: -65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 9.06 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 9.06

Context: 10.6

### TR26-09

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-58)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-09
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.181
- Grade Unit: g/t
- Intercept: 6.1 m
- From: 53.2 m
- To: 59.3 m
- Hole Depth: 219.5 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-09:53.2-59.3
- Mining Method: open\_pit

#### Location

- Easting: 588487
- Northing: 3508275
- Azimuth: 114 °
- Dip: -65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.181 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.181

Context: 6.1

### TR26-09

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-59)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-09
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 13.1
- Grade Unit: g/t
- Intercept: 6.1 m
- From: 53.2 m
- To: 59.3 m
- Hole Depth: 219.5 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-09:53.2-59.3
- Mining Method: open\_pit

#### Location

- Easting: 588487
- Northing: 3508275
- Azimuth: 114 °
- Dip: -65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 13.1 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 13.1

Context: 6.1

### TR26-09

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-60)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-09
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.041
- Grade Unit: g/t
- Intercept: 6.1 m
- From: 158.1 m
- To: 164.1 m
- Hole Depth: 219.5 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-09:158.1-164.1
- Mining Method: open\_pit

#### Location

- Easting: 588487
- Northing: 3508275
- Azimuth: 114 °
- Dip: -65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.041 g/t is at the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.041

Context: 6.1

### TR26-09

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-61)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-09
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 7.37
- Grade Unit: g/t
- Intercept: 6.1 m
- From: 158.1 m
- To: 164.1 m
- Hole Depth: 219.5 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-09:158.1-164.1
- Mining Method: open\_pit

#### Location

- Easting: 588487
- Northing: 3508275
- Azimuth: 114 °
- Dip: -65 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 7.37 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 7.37

Context: 6.1

### TR26-10

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-62)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-10
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.162
- Grade Unit: g/t
- Intercept: 6.1 m
- From: 112.5 m
- To: 118.6 m
- Hole Depth: 274.4 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-10:112.5-118.6
- Mining Method: open\_pit

#### Location

- Easting: 588271
- Northing: 3507282
- Azimuth: 105 °
- Dip: -80 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.162 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.162

Context: 6.1

### TR26-10

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-63)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-10
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 9.15
- Grade Unit: g/t
- Intercept: 6.1 m
- From: 112.5 m
- To: 118.6 m
- Hole Depth: 274.4 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-10:112.5-118.6
- Mining Method: open\_pit

#### Location

- Easting: 588271
- Northing: 3507282
- Azimuth: 105 °
- Dip: -80 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 9.15 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 9.15

Context: 6.1

### TR26-11

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-64)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-11
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.173
- Grade Unit: g/t
- Intercept: 100.3 m
- From: 100.3 m
- To: 200.6 m
- Hole Depth: 250 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-11:100.3-200.6
- Mining Method: open\_pit

#### Location

- Easting: 588653
- Northing: 3507717
- Azimuth: 109 °
- Dip: -60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.173 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. However, the intercept width is continuous \(100.3m\), contributing to bulk tonnage potential in a step-out hole. The GT value is moderate \(17.35 g/t\*m\).

- Positive factor: Continuous Intercept

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.173

Context: 100.3

### TR26-11

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-65)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-11
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 11.46
- Grade Unit: g/t
- Intercept: 100.3 m
- From: 100.3 m
- To: 200.6 m
- Hole Depth: 250 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-11:100.3-200.6
- Mining Method: open\_pit

#### Location

- Easting: 588653
- Northing: 3507717
- Azimuth: 109 °
- Dip: -60 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 11.46 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. However, the intercept width is continuous \(100.3m\), and the GT value is moderate \(1150 g/t\*m\), contributing to bulk tonnage potential in a step-out hole.

- Positive factor: Continuous Intercept

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 11.46

Context: 100.3

### TR26-12

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-66)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-12
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.172
- Grade Unit: g/t
- Intercept: 48.6 m
- From: 100.3 m
- To: 149 m
- Hole Depth: 237.8 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-12:100.3-149.0
- Mining Method: open\_pit

#### Location

- Easting: 588699
- Northing: 3507669
- Azimuth: 125 °
- Dip: -70 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.172 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. However, the intercept width is strong, contributing to bulk tonnage potential in a step-out hole. The GT value is moderate \(8.36 g/t\*m\).

- Positive factor: Strong Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.172

Context: 48.6

### TR26-12

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-67)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-12
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 18.04
- Grade Unit: g/t
- Intercept: 48.6 m
- From: 100.3 m
- To: 149 m
- Hole Depth: 237.8 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-12:100.3-149.0
- Mining Method: open\_pit

#### Location

- Easting: 588699
- Northing: 3507669
- Azimuth: 125 °
- Dip: -70 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 18.04 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. However, the intercept width is strong, and the GT value is moderate \(876 g/t\*m\), contributing to bulk tonnage potential in a step-out hole.

- Positive factor: Strong Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 18.04

Context: 48.6

### TR26-13

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-68)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-13
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.056
- Grade Unit: g/t
- Intercept: 9.1 m
- From: 18.2 m
- To: 27.4 m
- Hole Depth: 219.5 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-13:18.2-27.4
- Mining Method: open\_pit

#### Location

- Easting: 588455
- Northing: 3508123
- Azimuth: 110 °
- Dip: -50 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.056 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.056

Context: 9.1

### TR26-13

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-69)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-13
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 8.27
- Grade Unit: g/t
- Intercept: 9.1 m
- From: 18.2 m
- To: 27.4 m
- Hole Depth: 219.5 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-13:18.2-27.4
- Mining Method: open\_pit

#### Location

- Easting: 588455
- Northing: 3508123
- Azimuth: 110 °
- Dip: -50 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 8.27 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 8.27

Context: 9.1

### TR26-13

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-70)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-13
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.132
- Grade Unit: g/t
- Intercept: 4.6 m
- From: 63.8 m
- To: 68.4 m
- Hole Depth: 219.5 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-13:63.8-68.4
- Mining Method: open\_pit

#### Location

- Easting: 588455
- Northing: 3508123
- Azimuth: 110 °
- Dip: -50 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.132 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.132

Context: 4.6

### TR26-13

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-71)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-13
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 3.33
- Grade Unit: g/t
- Intercept: 4.6 m
- From: 63.8 m
- To: 68.4 m
- Hole Depth: 219.5 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-13:63.8-68.4
- Mining Method: open\_pit

#### Location

- Easting: 588455
- Northing: 3508123
- Azimuth: 110 °
- Dip: -50 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 3.33 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 3.33

Context: 4.6

### TR26-13

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-72)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-13
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.039
- Grade Unit: g/t
- Intercept: 6.1 m
- From: 85.1 m
- To: 91.2 m
- Hole Depth: 219.5 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-13:85.1-91.2
- Mining Method: open\_pit

#### Location

- Easting: 588455
- Northing: 3508123
- Azimuth: 110 °
- Dip: -50 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.039 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.039

Context: 6.1

### TR26-13

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-73)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-13
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 5
- Grade Unit: g/t
- Intercept: 6.1 m
- From: 85.1 m
- To: 91.2 m
- Hole Depth: 219.5 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-13:85.1-91.2
- Mining Method: open\_pit

#### Location

- Easting: 588455
- Northing: 3508123
- Azimuth: 110 °
- Dip: -50 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 5.0 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 5.00

Context: 6.1

### TR26-13

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-74)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-13
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.062
- Grade Unit: g/t
- Intercept: 6.1 m
- From: 194.5 m
- To: 200.6 m
- Hole Depth: 219.5 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-13:194.5-200.6
- Mining Method: open\_pit

#### Location

- Easting: 588455
- Northing: 3508123
- Azimuth: 110 °
- Dip: -50 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.062 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.062

Context: 6.1

### TR26-13

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-75)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-13
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 4.275
- Grade Unit: g/t
- Intercept: 6.1 m
- From: 194.5 m
- To: 200.6 m
- Hole Depth: 219.5 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-13:194.5-200.6
- Mining Method: open\_pit

#### Location

- Easting: 588455
- Northing: 3508123
- Azimuth: 110 °
- Dip: -50 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 4.275 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 4.275

Context: 6.1

### TR26-14

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-76)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-14
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.195
- Grade Unit: g/t
- Intercept: 10.6 m
- From: 0 m
- To: 10.6 m
- Hole Depth: 243.9 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-14:0.0-10.6
- Mining Method: open\_pit

#### Location

- Easting: 588669
- Northing: 3508049
- Azimuth: 230 °
- Dip: -68 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.195 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.195

Context: 10.6

### TR26-14

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-77)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-14
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 13
- Grade Unit: g/t
- Intercept: 10.6 m
- From: 0 m
- To: 10.6 m
- Hole Depth: 243.9 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-14:0.0-10.6
- Mining Method: open\_pit

#### Location

- Easting: 588669
- Northing: 3508049
- Azimuth: 230 °
- Dip: -68 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 13.0 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 13.00

Context: 10.6

### TR26-14

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-78)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-14
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.618
- Grade Unit: g/t
- Intercept: 107.9 m
- From: 39.5 m
- To: 147.4 m
- Hole Depth: 243.9 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-14:39.5-147.4
- Mining Method: open\_pit

#### Location

- Easting: 588669
- Northing: 3508049
- Azimuth: 230 °
- Dip: -68 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.618 g/t is above the weak threshold for open pit gold \(0.4 g/t\) and represents an exceptional width of continuous mineralization \(107.9m\), contributing significantly to bulk tonnage potential. The GT value is strong \(66.68 g/t\*m\). While below the project average grade, the width and step-out nature are highly positive.

- Positive factor: Continuous Intercept

- Positive factor: Step-Out Extension

- Positive factor: Gold Grade above weak threshold

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Gold Grade below project average

Evidence · table

> 0.618

Context: 107.9

### TR26-14

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-79)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-14
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 24.8
- Grade Unit: g/t
- Intercept: 107.9 m
- From: 39.5 m
- To: 147.4 m
- Hole Depth: 243.9 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-14:39.5-147.4
- Mining Method: open\_pit

#### Location

- Easting: 588669
- Northing: 3508049
- Azimuth: 230 °
- Dip: -68 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 24.8 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. However, the intercept width is exceptional \(107.9m\), and the GT value is strong \(2676 g/t\*m\), contributing significantly to bulk tonnage potential. The step-out nature adds high novelty.

- Positive factor: Continuous Intercept

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 24.80

Context: 107.9

### TR26-14

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-80)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-14
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.091
- Grade Unit: g/t
- Intercept: 48.6 m
- From: 176.3 m
- To: 225 m
- Hole Depth: 243.9 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-14:176.3-225.0
- Mining Method: open\_pit

#### Location

- Easting: 588669
- Northing: 3508049
- Azimuth: 230 °
- Dip: -68 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.091 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. However, the intercept width is strong, contributing to bulk tonnage potential in a step-out hole. The GT value is low \(4.42 g/t\*m\).

- Positive factor: Strong Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.091

Context: 48.6

### TR26-14

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-81)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-14
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 8.11
- Grade Unit: g/t
- Intercept: 48.6 m
- From: 176.3 m
- To: 225 m
- Hole Depth: 243.9 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-14:176.3-225.0
- Mining Method: open\_pit

#### Location

- Easting: 588669
- Northing: 3508049
- Azimuth: 230 °
- Dip: -68 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 8.11 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. However, the intercept width is strong, and the GT value is low \(394 g/t\*m\), contributing to bulk tonnage potential in a step-out hole.

- Positive factor: Strong Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 8.11

Context: 48.6

### TR26-14

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-82)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-14
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.121
- Grade Unit: g/t
- Intercept: 9.1 m
- From: 234.1 m
- To: 243.2 m
- Hole Depth: 243.9 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-14:234.1-243.2
- Mining Method: open\_pit

#### Location

- Easting: 588669
- Northing: 3508049
- Azimuth: 230 °
- Dip: -68 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The gold grade of 0.121 g/t is below the weak threshold for open pit gold \(0.4 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it represents an expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Gold Grade

Evidence · table

> 0.121

Context: 9.1

### TR26-14

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-83)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-14
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 10.17
- Grade Unit: g/t
- Intercept: 9.1 m
- From: 234.1 m
- To: 243.2 m
- Hole Depth: 243.9 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: TR26-14:234.1-243.2
- Mining Method: open\_pit

#### Location

- Easting: 588669
- Northing: 3508049
- Azimuth: 230 °
- Dip: -68 °
- Loc. Confidence: high

#### QA/QC

- Laboratory: Bureau Veritas
- QA/QC Disclosed: Yes
- Lab Certified: Yes
- QP Signed: Yes

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: The silver grade of 10.17 g/t is below the weak threshold \(30 g/t\) and significantly below the project average. The intercept width is moderate, but the GT value is low. However, it contributes to the expansion of mineralization in a step-out hole.

- Positive factor: Moderate Continuity

- Positive factor: Step-Out Extension

- Positive factor: QA/QC Disclosed

- Negative factor: Apparent Width Only

- Negative factor: Low Silver Grade

Evidence · table

> 10.17

Context: 9.1

### TR26-10 PC

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-84)

Tombstone Project · gold

#### Identity

- Hole ID: TR26-10 PC
- Project: Tombstone Project
- Commodity: gold
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 0.162
- Grade Unit: g/t
- Intercept: 6.1 m
- From: 112.5 m
- To: 118.6 m

#### Classification

- Sample Type: drill
- Group ID: TR26-10 PC:112.5-118.6
- Mining Method: open\_pit

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: Expanded from assay table. 0.162 g/t gold is below against the open\_pit mining band \[5, 2, 1, 0.3\] g/t. Grade×width 1.0 g/t·m is below.

- Negative factor: 0.162 g/t gold is below the weak threshold \(0.3 g/t\) on the open\_pit mining band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 0.162

Context: TR26-10 PC

### TR26-10 PC

[Link to this fact](https://atlas-staging.minestarters.com/news/aztec-drilling-expands-oxide-gold-silver-zone-at-tombstone-project-arizona-inter--4ced5b16-f782-4fe3-a5eb-3ab28dc2bb43#fact-drill-facts-85)

Tombstone Project · silver

#### Identity

- Hole ID: TR26-10 PC
- Project: Tombstone Project
- Commodity: silver
- Region: usa\_az
- Reported Region: Arizona
- Ticker: AZT

#### Geometry

- Grade: 9.15
- Grade Unit: g/t
- Intercept: 6.1 m
- From: 112.5 m
- To: 118.6 m

#### Classification

- Sample Type: drill
- Group ID: TR26-10 PC:112.5-118.6
- Mining Method: open\_pit

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-04-15T00:00:00.000Z

Reasoning: Expanded from assay table. 9.15 g/t silver is below against the default band \[500, 200, 100, 30\] g/t. Grade×width 55.8 g/t·m is below.

- Negative factor: 9.15 g/t silver is below the weak threshold \(30 g/t\) on the default band.

- Negative factor: Scored from rubric bands during table expansion, not from document context.

Evidence · table

> 9.15

Context: TR26-10 PC

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
