AWJ: Union Jack Project Settlement & Completion

Original announcement by asx on

Company
Auric Mining Limited
Ticker
AWJ
Exchange
ASX
Region
Western Australia
Primary commodity
Gold
Secondary commodities
None reported
Document categories
Agreement transaction, Resource update, Capital raise
Extracted
2026-10-06 22:12:54 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Auric Mining Limited has completed the acquisition of the Union Jack Project for A$6.5 million cash and A$3.0 million in shares. This strategic move adds an Inferred Mineral Resource of 3.12 million tonnes at 1.02 g/t gold for 102,000 ounces, increasing the company's total gold resource by 51% to 301,000 ounces. The project, located near the Burbanks processing facility, offers near-term open pit gold mining potential, with a major drill program planned for November 2026 to expand resources.

Reasoning: Auric Mining has successfully completed a strategic acquisition of the Union Jack Project, which significantly boosts its gold resource inventory and provides a near-term production opportunity. While the Union Jack resource is currently entirely Inferred, the acquisition aligns with the company's growth strategy and includes plans for further drilling to upgrade and expand the resource.

Positive factors

  • Strategic acquisition of Union Jack Project completed
  • Significant increase in company's total gold resource inventory by 51%
  • Union Jack Project offers near-term open pit gold mining opportunity
  • Project located within trucking distance of existing processing facility
  • Planned major drill program to expand resources

Negative factors

  • Union Jack resource is entirely Inferred, representing lower confidence
  • Historical drill results mentioned in highlights lack specific hole IDs for verification

Facts used in scoring: 10

Classification and evidence

Strategic Acquisitionpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: The company completed the acquisition of the Union Jack Project, which is described as fitting its strategy of acquiring near-term gold production assets.

Evidence · text

“Settlement completed to purchase Union Jack granted mining lease (M15/120)”

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: The Union Jack acquisition increases Auric’s current Mineral Resource inventory by 51%, to 7.5Mt @ 1.25g/t gold for 301,000 ounces.

Evidence · text

“Union Jack increases Auric’s current Mineral Resource inventory by 51%, to 7.5Mt @ 1.25g/t gold for 301,000 ounces.”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The Union Jack Mineral Resource estimate is entirely classified as Inferred.

Evidence · text

“Union Jack’s Inferred Mineral Resource estimate of 3.12Mt @ 1.02g/t Au for 102,000 ounces”

All Inferrednegative

100% of resource is Inferred category — very early stage, no engineering confidence.

Why it applies: The Union Jack resource is 100% Inferred, as stated in the resource estimate.

Evidence · text

“Union Jack 0.5 g/t Inferred 3,100 1.02 102”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The announcement includes a Competent Person Statement confirming that the information relating to Mineral Resources is extracted from a previous ASX announcement and that the Competent Person’s findings have not been materially modified.

Evidence · text

“Competent Person Statement The information in this announcement that relates to exploration results and Mineral Resources is extracted from the announcement to the ASX entitled Union Jack Project Strategic Acquisition and Resource Upgrade dated 9 September 2026”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document provides an updated combined Mineral Resource Estimate for the company, incorporating the new Union Jack resource.

Evidence · text

“Current Mineral Resource Estimates”

Extracted facts

Stored fact records: 9. Some facts used in scoring do not have a stored record.

Resource Estimates (9)

inferredUnion Jack · goldTonnes: 3100000Grade: 1.02Grade Unit: g/tContained Metal: 102Contained Unit: k oz auView all details
Link to this fact

Identity

Project
Union Jack
Commodity
gold
Ticker
AWJ

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:a5f408f4110a6db9cb21

Resource Data

Category
inferred
Tonnes
3100000
Grade
1.02
Grade Unit
g/t
Contained Metal
102
Contained Unit
k oz au
Cutoff Grade
0.5
Cutoff Unit
g/t Au

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The maiden Inferred Mineral Resource for Union Jack adds substantial gold ounces to the company's portfolio, supporting the acquisition's value, though its Inferred classification indicates early-stage confidence.

Positive factors

  • New resource estimate for the acquired project
  • Adds significant gold ounces to company inventory
  • Open pit potential

Negative factors

  • Resource is entirely Inferred, indicating lower geological confidence

Evidence · text

“Union Jack’s Inferred Mineral Resource estimate of 3.12Mt @ 1.02g/t Au for 102,000 ounces”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredUnion Jack · goldTonnes: 2160000Grade: 1.22Grade Unit: g/tContained Metal: 85Contained Unit: k oz auView all details
Link to this fact

Identity

Project
Union Jack
Commodity
gold
Ticker
AWJ

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:9a566667a18f7c007d41

Resource Data

Category
inferred
Tonnes
2160000
Grade
1.22
Grade Unit
g/t
Contained Metal
85
Contained Unit
k oz au
Cutoff Grade
0.65
Cutoff Unit
g/t Au

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: Reporting a higher-grade subset of the Inferred resource at a higher cut-off demonstrates the potential for selective mining and provides a positive indication for future processing feed, despite the overall Inferred classification.

Positive factors

  • Highlights higher-grade inventory potential at a higher cut-off
  • Supports potential for additional feed for processing plant

Negative factors

  • Resource is entirely Inferred

Evidence · text

“Using a 0.65g/t Au cut-off within the same optimised pit shell, the Project contains an Inferred Mineral Resource Estimate of 2.16Mt at 1.22g/t Au for 85,000 ounces of gold.”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedMunda · goldTonnes: 3500000Grade: 1.45Grade Unit: g/tContained Metal: 163Contained Unit: k oz auHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Munda
Commodity
gold
Ticker
AWJ

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:849189fc19dbe74ffa3b
Deposit or zone
in situ

Resource Data

Category
indicated
Tonnes
3500000
Grade
1.45
Grade Unit
g/t
Contained Metal
163
Contained Unit
k oz au
Cutoff Grade
0.5
Cutoff Unit
g/t

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-05-25T00:00:00.000Z

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This is a previously reported Indicated resource for the Munda project, providing a baseline for the company's existing assets, but it is not new information.

Positive factors

  • Indicated resource category provides good confidence

Negative factors

  • Historical data, not new information in this release

Evidence · table

“1.45”

Context: 3,500

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredMunda · goldTonnes: 700000Grade: 1.3Grade Unit: g/tContained Metal: 29Contained Unit: k oz auHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Munda
Commodity
gold
Ticker
AWJ

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:c462510c6b67018d13ad
Deposit or zone
in situ

Resource Data

Category
inferred
Tonnes
700000
Grade
1.3
Grade Unit
g/t
Contained Metal
29
Contained Unit
k oz au
Cutoff Grade
0.5
Cutoff Unit
g/t

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-05-25T00:00:00.000Z

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This is a previously reported Inferred resource for the Munda project, providing context for the company's existing assets, but it is not new information and has lower confidence.

Negative factors

  • Historical data, not new information in this release
  • Inferred resource category indicates lower confidence

Evidence · table

“1.3”

Context: 700

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedMunda Stockpiles · goldTonnes: 76000Grade: 0.81Grade Unit: g/tContained Metal: 2Contained Unit: k oz auHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Munda Stockpiles
Commodity
gold
Ticker
AWJ

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:b517f9e7600f4dfaec30
Material type
stockpile

Resource Data

Category
indicated
Tonnes
76000
Grade
0.81
Grade Unit
g/t
Contained Metal
2
Contained Unit
k oz au

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-05-25T00:00:00.000Z

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This is a previously reported Indicated resource for Munda stockpiles, representing a small but readily available portion of the company's existing assets, but it is not new information.

Positive factors

  • Indicated resource category provides good confidence
  • Stockpile resource represents readily available material

Negative factors

  • Historical data, not new information in this release

Evidence · table

“0.81”

Context: 76

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedJeffreys Find · goldTonnes: 10000Grade: 2.1Grade Unit: g/tContained Metal: 1Contained Unit: k oz auHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Jeffreys Find
Commodity
gold
Ticker
AWJ

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:2a74cdfcb38835f37011

Resource Data

Category
indicated
Tonnes
10000
Grade
2.1
Grade Unit
g/t
Contained Metal
1
Contained Unit
k oz au
Cutoff Grade
0.5
Cutoff Unit
g/t

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-04-30T00:00:00.000Z

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This is a previously reported, very small Indicated resource for Jeffreys Find, providing minimal new information in this release.

Positive factors

  • Indicated resource category provides good confidence

Negative factors

  • Historical data, not new information in this release
  • Very small resource size

Evidence · table

“2.1”

Context: 10

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredJeffreys Find · goldTonnes: 70000Grade: 1.8Grade Unit: g/tContained Metal: 4Contained Unit: k oz auHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Jeffreys Find
Commodity
gold
Ticker
AWJ

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:d5b573dd2a9dc4e5ce39

Resource Data

Category
inferred
Tonnes
70000
Grade
1.8
Grade Unit
g/t
Contained Metal
4
Contained Unit
k oz au
Cutoff Grade
0.5
Cutoff Unit
g/t

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-04-30T00:00:00.000Z

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: This is a previously reported, very small Inferred resource for Jeffreys Find, providing minimal new information and having lower confidence.

Negative factors

  • Historical data, not new information in this release
  • Inferred resource category indicates lower confidence
  • Very small resource size

Evidence · table

“1.8”

Context: 70

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedCombined · goldTonnes: 3586000Grade: 1.44Grade Unit: g/tContained Metal: 166Contained Unit: k oz auView all details
Link to this fact

Identity

Project
Combined
Commodity
gold
Ticker
AWJ

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:7f6c3ae141b6bc940a92

Resource Data

Category
indicated
Tonnes
3586000
Grade
1.44
Grade Unit
g/t
Contained Metal
166
Contained Unit
k oz au
Cutoff Grade
0.5
Cutoff Unit
g/t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The combined Indicated resource reflects a substantial and confident portion of the company's total gold inventory, contributing positively to overall project viability.

Positive factors

  • Indicated resource category provides good confidence
  • Represents a significant portion of the company's total resource

Evidence · table

“1.44”

Context: 3,586

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredCombined · goldTonnes: 3870000Grade: 1.08Grade Unit: g/tContained Metal: 135Contained Unit: k oz auView all details
Link to this fact

Identity

Project
Combined
Commodity
gold
Ticker
AWJ

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:f40d3c531cce4344bc1e

Resource Data

Category
inferred
Tonnes
3870000
Grade
1.08
Grade Unit
g/t
Contained Metal
135
Contained Unit
k oz au
Cutoff Grade
0.5
Cutoff Unit
g/t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The combined Inferred resource significantly increases the company's total gold ounces, but its lower confidence category means further work is required for de-risking.

Positive factors

  • Adds significant gold ounces to company inventory

Negative factors

  • Inferred resource category indicates lower confidence

Evidence · table

“1.08”

Context: 3,870

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.