Assays Confirm IOCG Style Mineralisation at Peake Project
Original announcement by miningjournal on
- Company
- Altitude Minerals
- Ticker
- ATT
- Exchange
- Unavailable
- Region
- Unavailable
- Primary commodity
- Copper
- Secondary commodities
- Gold
- Document categories
- Drill results
- Extracted
- 2026-11-06 09:02:45 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Altitude Minerals has reported assay results from the Peake Project confirming IOCG-style mineralisation. The results include copper grades up to 0.45% and gold grades up to 5.35 g/t.
Reasoning: The announcement reports high-grade gold and copper intercepts consistent with IOCG style, but lacks the specific interval and hole data required for high-confidence technical validation.
Positive factors
- IOCG style mineralisation confirmed
- Gold grades up to 5.35 g/t
Negative factors
- No specific hole IDs or widths provided in the text
- Copper grades are relatively low for IOCG (0.45%)
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 2
Classification and evidence
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: The document does not mention any QA/QC protocols, labs, or sign-offs.
Evidence · text
“Assays Confirm IOCG Style Mineralisation at Peake Project”
Apparent Width Onlynegative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Why it applies: The document reports grades but fails to provide any intercept widths or drill orientations.
Evidence · text
“Multiple narrow intervals of IOCG elements intersected”
Extracted facts
Stored fact records: 2. Some facts used in scoring do not have a stored record.
Drill Results (2)
Fact 1Peake Project · copperGrade: 0.45Grade Unit: %View all detailsHide details
Identity
- Project
- Peake Project
- Commodity
- copper
- Ticker
- ATT
Geometry
- Grade
- 0.45
- Grade Unit
- %
Review
- Needs Review
- No
- Interp. Status
- low_confidence
- Historical
- No
Dates
- Event date
- 2023-07-24T00:00:00.000Z
Reasoning: Copper grade of 0.45% is reported as part of IOCG mineralisation but is relatively low.
Negative factors
- Low grade for IOCG style
Evidence · text
“copper up to 0.45%”
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut Off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Fact 2Peake Project · goldGrade: 5.35Grade Unit: g/tView all detailsHide details
Identity
- Project
- Peake Project
- Commodity
- gold
- Ticker
- ATT
Geometry
- Grade
- 5.35
- Grade Unit
- g/t
Review
- Needs Review
- No
- Interp. Status
- low_confidence
- Historical
- No
Dates
- Event date
- 2023-07-24T00:00:00.000Z
Reasoning: Gold grade of 5.35 g/t is strong, but the lack of interval width makes it difficult to assess the total metal content.
Positive factors
- High grade gold intercept
Negative factors
- Missing width and hole ID
Evidence · text
“gold up to 5.35 g/t”
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut Off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.