ASN: Annual Report to Shareholders

Original announcement by asx on

Company
Anson Resources Limited
Ticker
ASN
Exchange
ASX
Region
Unavailable
Primary commodity
Lithium
Secondary commodities
Uranium, Vanadium, Bromine, Zinc, Lead, Silver
Document categories
Resource update, Capital raise, Agreement transaction
Extracted
2026-09-30 08:26:23 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Anson Resources Limited reported substantial progress for FY2026, highlighted by a 650% increase in the Green River Lithium Project's JORC Mineral Resource to 773,000 tonnes LCE, with Indicated resources up 863% to 183,000 tonnes. The company secured a binding agreement with POSCO Holdings to fund and operate a DLE demonstration plant and a definitive offtake agreement with LG Energy Solution for 4,000 tonnes per annum of battery-grade lithium carbonate. Permitting for the Green River project also advanced significantly with the final Small Scale Mining Operation approval received.

Reasoning: Anson Resources Limited reported substantial progress for FY2026, marked by a significant resource upgrade for its flagship Green River Lithium Project, securing key strategic partnerships with POSCO and LG Energy Solution, and advancing permitting. These achievements de-risk the project and position it for future development, despite the company remaining pre-revenue and facing some corporate governance challenges.

Positive factors

  • Significant resource upgrade for Green River Lithium Project (650% increase in LCE)
  • Substantial increase in Indicated resources (863%) for Green River
  • Binding agreement with POSCO Holdings for DLE demonstration plant (funded by POSCO)
  • Definitive offtake agreement with LG Energy Solution for battery-grade lithium carbonate
  • Final Small Scale Mining Operation (SMO) approval received for Green River
  • Positive Scoping Study results for Green River (pre-tax NPV US$1,373 million, IRR 27.5%)
  • Cost discipline and reduction in director and employee expenses
  • Yellow Cat project progress and positive U.S. Government 'Met' assessment

Negative factors

  • Company remains pre-revenue and dependent on capital raises
  • Material uncertainty regarding going concern, despite mitigation plans
  • Dilution from equity raises during the year
  • Paradox and Western Australian projects deferred to focus on Green River
  • Two consecutive 'strikes' on remuneration report at AGMs
  • All-executive board with no independent non-executive directors

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 21

Classification and evidence

Category Upgradepositive

Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.

Why it applies: The Green River Mineral Resource was upgraded by 650% to 773,000 tonnes LCE, with Indicated Resource increasing by 863% to 183,000 tonnes.

Evidence · text

“Mineral Resource upgraded 650% to 773,000 tonnes LCE, Indicated +863% to 183,000 t (ASX 13 May 2026).”

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: The Green River JORC Mineral Resource grew more than sixfold, with a 650% upgrade to 773,000 tonnes LCE.

Evidence · text

“Your Company’s JORC Mineral Resource grew more than sixfold, an engineering study put hard numbers on the economics, and POSCO Holdings committed”

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: The Green River JORC Mineral Resource was upgraded by 650% to 773,000 tonnes LCE, indicating a significant increase in contained lithium carbonate equivalent.

Evidence · text

“Mineral Resource upgraded 650% to 773,000 t LCE, Indicated +863% to 183,000 t (ASX 13 May 2026).”

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: The average lithium grade for the Green River project increased from 93.5 mg/L to 127.8 mg/L.

Evidence · text

“reflects higher confidence in stratigraphic thickness and lithium concentration (average grade increased from 93.5 mg/L to 127.8 mg/L)”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The Green River Mineral Resource estimate is based on information compiled by independent consulting geologist D. Roy Eccles (P. Geol., P. Geo.).

Evidence · text

“The information in this report that relates to Mineral Resource estimates is based on information compiled by independent consulting geologist D. Roy Eccles (P. Geol., P. Geo.).”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Green River Mineral Resource is reported in accordance with the JORC Code (2012).

Evidence · text

“Mineral Resources are reported in accordance with the JORC Code (2012).”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The Green River Mineral Resource was upgraded by 650% to 773,000 tonnes LCE.

Evidence · text

“Mineral Resource upgraded 650% to 773,000 t LCE, Indicated +863% to 183,000 t (ASX 13 May 2026).”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The Paradox Mineral Resource estimate has been prepared by Mr Richard Maddocks, a Fellow of the Australasian Institute of Mining and Metallurgy.

Evidence · text

“The information contained in this report relating to Exploration Results and Mineral Resource Estimates has been prepared by Mr Richard Maddocks, MSc in Mineral Economics, BSc in Geology and Grad Dip in Applied Finance. Mr Maddocks is a Fellow of the Australasian Institute of Mining and Metallurgy (111714) with over 30 years of experience.”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Paradox Mineral Resource is reported in accordance with the JORC Code (2012).

Evidence · text

“Mineral Resources are reported in accordance with the JORC Code (2012).”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The Paradox Mineral Resources are unchanged from the prior year, indicating a routine restatement.

Evidence · text

“The Mineral Resources are unchanged from the prior year.”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The Surprise Mineral Resource estimate is based on information compiled by Grant Louw of Auralia Mining Consulting.

Evidence · text

“The information in this report that relates to in-situ Mineral Resources is based on information compiled by Grant Louw of Auralia Mining Consulting.”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Surprise Mineral Resource is a JORC 2012 compliant estimate.

Evidence · text

“Surprise Deposit maiden Inferred Mineral Resource, JORC 2012”

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The Surprise Deposit is described as a 'maiden Inferred Mineral Resource'.

Evidence · text

“Surprise Deposit maiden Inferred Mineral Resource, JORC 2012”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The Mary Springs Mineral Resources information has been compiled and assessed by Mr Bill Oliver, a consultant to Anson Resources Limited.

Evidence · text

“The information in this report that relates to the Mary Springs Mineral Resources complies with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) and has been compiled and assessed by Mr Bill Oliver, a consultant to Anson Resources Limited and Auralia Mining Consulting Pty Ltd.”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Mary Springs Mineral Resource complies with the 2012 Edition of the JORC Code.

Evidence · text

“The information in this report that relates to the Mary Springs Mineral Resources complies with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code)”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The Mary Springs Mineral Resource was announced to the ASX on 13 October 2017 and is unchanged from the prior year.

Evidence · text

“The Mary Springs Mineral Resource was announced to the ASX on 13 October 2017. The Company confirms that it is not aware of any new information or data that materially affects the information included in that announcement and that all material assumptions and technical parameters underpinning the estimate continue to apply and have not materially changed.”

Historical Estimate Onlynegative

Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.

Why it applies: The Yellow Cat estimate is explicitly stated as a 'historical estimate' and 'not reported in accordance with the JORC Code (2012 Edition) and is not a Mineral Resource'.

Evidence · text

“A historical estimate of 56,850 tons at 2,400 ppm U₃O₈ and 1.47% V₂O₅ exists for the Yellow Cat area (ASX 4 February 2026). ... The historical estimate is not reported in accordance with the JORC Code (2012 Edition) and is not a Mineral Resource.”

No QP/CP Disclosurenegative

No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: The document states that 'A Competent Person has not done sufficient work to classify the historical estimate as a Mineral Resource in accordance with the JORC Code'.

Evidence · text

“A Competent Person has not done sufficient work to classify the historical estimate as a Mineral Resource in accordance with the JORC Code, and it is uncertain that following further evaluation or exploration work the historical estimate will be able to be reported as a Mineral Resource.”

Stale Data Re-releasenegative · Story-specific tag

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The Yellow Cat historical estimate is based on drilling carried out between 1951 and 1954, making the data very old despite a recent re-release.

Evidence · text

“It was interpreted from six phases of drilling carried out by the U.S. Bureau of Mines in conjunction with the U.S. Geological Survey between 8 October 1951 and 23 November 1954”

Extracted facts

Stored fact records: 21. Some facts used in scoring do not have a stored record.

Resource Estimates (21)

indicatedGreen River Lithium Project · lithiumGrade: 127.8Grade Unit: mg/LContained Metal: 183000Contained Unit: t lceView all details
Link to this fact

Identity

Project
Green River Lithium Project
Commodity
lithium
Region
usa_ut
Reported Region
Utah, USA
Ticker
ASN

Resource scope

Estimate type
resource
Effective date
2026-05-13T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
D. Roy Eccles
Resource group id
resource:25ca742553d79528da8d

Resource Data

Category
indicated
Grade
127.8
Grade Unit
mg/L
Contained Metal
183000
Contained Unit
t lce
Cutoff Grade
50
Cutoff Unit
mg/L Li

Prior Estimate

Resource Date
2026-05-13
Prior Contained Metal
19000

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The indicated resource for lithium at Green River shows a substantial increase in contained LCE and a strong grade, indicating significant project de-risking and growth in confidence.

Positive factors

  • Significant increase in contained LCE (863%) compared to prior estimate
  • Grade of 127.8 mg/L Li is strong for a brine resource
  • JORC compliant estimate with QP sign-off

Evidence · table

“183,000”

Context: Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 183000 against 19000 previously

inferredGreen River Lithium Project · lithiumGrade: 127.8Grade Unit: mg/LContained Metal: 590000Contained Unit: t lceView all details
Link to this fact

Identity

Project
Green River Lithium Project
Commodity
lithium
Region
usa_ut
Reported Region
Utah, USA
Ticker
ASN

Resource scope

Estimate type
resource
Effective date
2026-05-13T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
D. Roy Eccles
Resource group id
resource:60be68e4f9292be67411

Resource Data

Category
inferred
Grade
127.8
Grade Unit
mg/L
Contained Metal
590000
Contained Unit
t lce
Cutoff Grade
50
Cutoff Unit
mg/L Li

Prior Estimate

Resource Date
2026-05-13
Prior Contained Metal
84000

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The inferred resource for lithium at Green River shows a substantial increase in contained LCE and a strong grade, contributing significantly to the overall resource growth, though it remains in the inferred category.

Positive factors

  • Significant increase in contained LCE (602%) compared to prior estimate
  • Grade of 127.8 mg/L Li is strong for a brine resource
  • JORC compliant estimate with QP sign-off

Negative factors

  • Inferred category has lower geological confidence

Evidence · table

“590,000”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 590000 against 84000 previously

indicatedParadox Lithium · lithiumTonnes: 562000000Grade: 123Grade Unit: ppmContained Metal: 367000Contained Unit: t lceView all details
Link to this fact

Identity

Project
Paradox Lithium
Commodity
lithium
Region
usa_ut
Reported Region
Utah, USA
Ticker
ASN

Resource scope

Estimate type
resource
Effective date
2023-10-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Maddocks
Resource group id
resource:98fae735b827d4e8b7e3

Resource Data

Category
indicated
Tonnes
562000000
Grade
123
Grade Unit
ppm
Contained Metal
367000
Contained Unit
t lce

Prior Estimate

Resource Date
2023-10-16

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The indicated resource for lithium at Paradox is a substantial, JORC compliant estimate, but it is a restatement of prior data with no new developments in the current reporting period.

Positive factors

  • Indicated category provides reasonable geological confidence
  • JORC compliant estimate with QP sign-off

Negative factors

  • Estimate is unchanged from prior year, indicating no new progress
  • Lower grade compared to Green River project

Evidence · table

“123”

Context: 562

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.0 years before this release

indicatedParadox Lithium Project · bromineTonnes: 562000000Grade: 3398Grade Unit: ppmContained Metal: 1910000Contained Unit: t br₂View all details
Link to this fact

Identity

Project
Paradox Lithium Project
Commodity
bromine
Region
usa_ut
Reported Region
Utah, USA
Ticker
ASN

Resource scope

Estimate type
resource
Effective date
2023-10-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Maddocks
Resource group id
resource:a90303182dee4cf9c4e2

Resource Data

Category
indicated
Tonnes
562000000
Grade
3398
Grade Unit
ppm
Contained Metal
1910000
Contained Unit
t br₂

Prior Estimate

Resource Date
2023-10-16

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The indicated resource for bromine at Paradox is a substantial, JORC compliant estimate, but it is a restatement of prior data with no new developments in the current reporting period.

Positive factors

  • Indicated category provides reasonable geological confidence
  • JORC compliant estimate with QP sign-off
  • Significant contained bromine as a potential byproduct

Negative factors

  • Estimate is unchanged from prior year, indicating no new progress

Evidence · table

“3,398”

Context: Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.0 years before this release

inferredParadox Lithium · lithiumTonnes: 1954000000Grade: 109Grade Unit: ppmContained Metal: 1138000Contained Unit: t lceView all details
Link to this fact

Identity

Project
Paradox Lithium
Commodity
lithium
Region
usa_ut
Reported Region
Utah, USA
Ticker
ASN

Resource scope

Estimate type
resource
Effective date
2023-10-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Maddocks
Resource group id
resource:4cd52023506bf1b46d07

Resource Data

Category
inferred
Tonnes
1954000000
Grade
109
Grade Unit
ppm
Contained Metal
1138000
Contained Unit
t lce

Prior Estimate

Resource Date
2023-10-16

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The inferred resource for lithium at Paradox is a large, JORC compliant estimate, but it is a restatement of prior data with no new developments in the current reporting period and remains in the inferred category.

Positive factors

  • JORC compliant estimate with QP sign-off
  • Large contained lithium resource

Negative factors

  • Estimate is unchanged from prior year, indicating no new progress
  • Inferred category has lower geological confidence
  • Lower grade compared to Green River project

Evidence · table

“109”

Context: 1,954

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.0 years before this release

inferredParadox Lithium Project · bromineTonnes: 1954000000Grade: 2915Grade Unit: ppmContained Metal: 5699000Contained Unit: t br₂View all details
Link to this fact

Identity

Project
Paradox Lithium Project
Commodity
bromine
Region
usa_ut
Reported Region
Utah, USA
Ticker
ASN

Resource scope

Estimate type
resource
Effective date
2023-10-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Maddocks
Resource group id
resource:9f90a5034d3f07884d8b

Resource Data

Category
inferred
Tonnes
1954000000
Grade
2915
Grade Unit
ppm
Contained Metal
5699000
Contained Unit
t br₂

Prior Estimate

Resource Date
2023-10-16

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The inferred resource for bromine at Paradox is a large, JORC compliant estimate, but it is a restatement of prior data with no new developments in the current reporting period and remains in the inferred category.

Positive factors

  • JORC compliant estimate with QP sign-off
  • Large contained bromine resource as a potential byproduct

Negative factors

  • Estimate is unchanged from prior year, indicating no new progress
  • Inferred category has lower geological confidence

Evidence · table

“2,915”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.0 years before this release

inferredParadox Lithium Project · lithiumTonnes: 2516000000Grade: 112Grade Unit: ppmContained Metal: 1504000Contained Unit: t lceView all details
Link to this fact

Identity

Project
Paradox Lithium Project
Commodity
lithium
Region
usa_ut
Reported Region
Utah, USA
Ticker
ASN

Resource scope

Estimate type
resource
Effective date
2023-10-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Maddocks
Resource group id
resource:6c626dcc32be501cdded

Resource Data

Category
inferred
Tonnes
2516000000
Grade
112
Grade Unit
ppm
Contained Metal
1504000
Contained Unit
t lce

Prior Estimate

Resource Date
2023-10-16

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The total resource for lithium at Paradox is a large, JORC compliant estimate, but it is a restatement of prior data with no new developments in the current reporting period and is largely in the inferred category.

Positive factors

  • JORC compliant estimate with QP sign-off
  • Large total contained lithium resource

Negative factors

  • Estimate is unchanged from prior year, indicating no new progress
  • Total resource is predominantly inferred, indicating lower confidence
  • Lower grade compared to Green River project

Evidence · table

“112”

Context: Resource

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.0 years before this release

inferredParadox Lithium Project · bromineTonnes: 2516000000Grade: 3023Grade Unit: ppmContained Metal: 7609000Contained Unit: t br₂View all details
Link to this fact

Identity

Project
Paradox Lithium Project
Commodity
bromine
Region
usa_ut
Reported Region
Utah, USA
Ticker
ASN

Resource scope

Estimate type
resource
Effective date
2023-10-16T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Richard Maddocks
Resource group id
resource:6c626dcc32be501cdded

Resource Data

Category
inferred
Tonnes
2516000000
Grade
3023
Grade Unit
ppm
Contained Metal
7609000
Contained Unit
t br₂

Prior Estimate

Resource Date
2023-10-16

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The total resource for bromine at Paradox is a large, JORC compliant estimate, but it is a restatement of prior data with no new developments in the current reporting period and is largely in the inferred category.

Positive factors

  • JORC compliant estimate with QP sign-off
  • Large total contained bromine resource as a potential byproduct

Negative factors

  • Estimate is unchanged from prior year, indicating no new progress
  • Total resource is predominantly inferred, indicating lower confidence

Evidence · table

“3,023”

Context: Resource

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.0 years before this release

inferredSurprise Project · leadTonnes: 103000Grade: 2.7Grade Unit: %Contained Metal: 2781Contained Unit: tView all details
Link to this fact

Identity

Project
Surprise Project
Commodity
lead
Region
mid-west, wa
Reported Region
Mid-West, WA
Ticker
ASN

Resource scope

Estimate type
resource
Effective date
2024-10-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Grant Louw
Resource group id
resource:6e53485a3d174a5bc372

Resource Data

Category
inferred
Tonnes
103000
Grade
2.7
Grade Unit
%
Contained Metal
2781
Contained Unit
t
Cutoff Grade
1
Cutoff Unit
% Pb

Prior Estimate

Resource Date
2024-10-01

Lab

Laboratory
Nagrom

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The inferred resource for lead at Surprise is a JORC compliant estimate, but it is a restatement of prior data with no new developments in the current reporting period and is relatively small.

Positive factors

  • JORC compliant estimate with QP sign-off
  • Cut-off grade disclosed

Negative factors

  • Estimate is unchanged from prior year, indicating no new progress
  • Inferred category has lower geological confidence
  • Relatively small tonnage

Evidence · table

“2.7”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredSurprise Project · zincTonnes: 103000Grade: 0.45Grade Unit: %Contained Metal: 464Contained Unit: tView all details
Link to this fact

Identity

Project
Surprise Project
Commodity
zinc
Region
mid-west, wa
Reported Region
Mid-West, WA
Ticker
ASN

Resource scope

Estimate type
resource
Effective date
2024-10-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Grant Louw
Resource group id
resource:6e53485a3d174a5bc372

Resource Data

Category
inferred
Tonnes
103000
Grade
0.45
Grade Unit
%
Contained Metal
464
Contained Unit
t
Cutoff Grade
1
Cutoff Unit
% Pb

Prior Estimate

Resource Date
2024-10-01

Lab

Laboratory
Nagrom

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The inferred resource for zinc at Surprise is a JORC compliant estimate, but it is a restatement of prior data with no new developments in the current reporting period and has a very low grade.

Positive factors

  • JORC compliant estimate with QP sign-off
  • Cut-off grade disclosed

Negative factors

  • Estimate is unchanged from prior year, indicating no new progress
  • Inferred category has lower geological confidence
  • Very low grade for zinc
  • Relatively small tonnage

Evidence · table

“0.45”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredSurprise Project · silverTonnes: 103000Grade: 1.3Grade Unit: g/tContained Metal: 4723Contained Unit: ozView all details
Link to this fact

Identity

Project
Surprise Project
Commodity
silver
Region
mid-west, wa
Reported Region
Mid-West, WA
Ticker
ASN

Resource scope

Estimate type
resource
Effective date
2024-10-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Grant Louw
Resource group id
resource:6e53485a3d174a5bc372

Resource Data

Category
inferred
Tonnes
103000
Grade
1.3
Grade Unit
g/t
Contained Metal
4723
Contained Unit
oz
Cutoff Grade
1
Cutoff Unit
% Pb

Prior Estimate

Resource Date
2024-10-01

Lab

Laboratory
Nagrom

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The inferred resource for silver at Surprise is a JORC compliant estimate, but it is a restatement of prior data with no new developments in the current reporting period and has a very low grade.

Positive factors

  • JORC compliant estimate with QP sign-off
  • Cut-off grade disclosed

Negative factors

  • Estimate is unchanged from prior year, indicating no new progress
  • Inferred category has lower geological confidence
  • Very low grade for silver
  • Relatively small tonnage

Evidence · table

“1.3”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredMary Springs · leadTonnes: 390000Grade: 6.5Grade Unit: %Contained Metal: 25350Contained Unit: tView all details
Link to this fact

Identity

Project
Mary Springs
Commodity
lead
Region
mid-west, wa
Reported Region
Mid-West, WA
Ticker
ASN

Resource scope

Estimate type
resource
Effective date
2017-10-13T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Bill Oliver
Resource group id
resource:55c853f74fbbaf118520

Resource Data

Category
inferred
Tonnes
390000
Grade
6.5
Grade Unit
%
Contained Metal
25350
Contained Unit
t

Prior Estimate

Resource Date
2017-10-13

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The Mary Springs lead resource is a JORC compliant estimate, but it is a stale restatement of prior data with no new developments and a combined category, reducing its current relevance.

Positive factors

  • JORC compliant estimate with QP sign-off

Negative factors

  • Estimate is unchanged from prior year, indicating no new progress
  • Estimate is from 2017, making it stale
  • Combined Indicated and Inferred category reduces confidence

Evidence · table

“6.5”

Context: Indicated and inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 9.0 years before this release

inferredYellow Cat Uranium-Vanadium Project · uraniumTonnes: 56850Grade: 2400Grade Unit: ppm U₃O₈Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Yellow Cat Uranium-Vanadium Project
Commodity
uranium
Region
usa_ut
Reported Region
Utah, USA
Ticker
ASN

Resource scope

Estimate type
resource
Reporting standards
other
QP Signed
Yes
Qualified person names
Peter (Greg) Knox
Resource group id
resource:a3168d55319e6e879fb8

Resource Data

Category
inferred
Tonnes
56850
Grade
2400
Grade Unit
ppm U₃O₈

Prior Estimate

Resource Date
1956

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
1956-01-01T00:00:00.000Z

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The Yellow Cat uranium estimate is historical, not JORC compliant, and based on very old data, making it highly speculative and unreliable for current resource assessment.

Negative factors

  • Historical estimate only, not JORC compliant
  • Uncertainty that further exploration will result in a JORC Mineral Resource
  • Data is very old (1950s) and pre-dates modern QA/QC practices

Evidence · text

“A historical estimate of 56,850 tons at 2,400 ppm U₃O₈ and 1.47% V₂O₅ exists for the Yellow Cat area (ASX 4 February 2026).”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 70.7 years before this release

inferredYellow Cat Uranium-Vanadium Project · vanadiumTonnes: 56850Grade: 1.47Grade Unit: % V₂O₅Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Yellow Cat Uranium-Vanadium Project
Commodity
vanadium
Region
usa_ut
Reported Region
Utah, USA
Ticker
ASN

Resource scope

Estimate type
resource
Reporting standards
other
QP Signed
Yes
Qualified person names
Peter (Greg) Knox
Resource group id
resource:a3168d55319e6e879fb8

Resource Data

Category
inferred
Tonnes
56850
Grade
1.47
Grade Unit
% V₂O₅

Prior Estimate

Resource Date
1956

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
1956-01-01T00:00:00.000Z

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: The Yellow Cat vanadium estimate is historical, not JORC compliant, and based on very old data, making it highly speculative and unreliable for current resource assessment.

Negative factors

  • Historical estimate only, not JORC compliant
  • Uncertainty that further exploration will result in a JORC Mineral Resource
  • Data is very old (1950s) and pre-dates modern QA/QC practices

Evidence · text

“A historical estimate of 56,850 tons at 2,400 ppm U₃O₈ and 1.47% V₂O₅ exists for the Yellow Cat area (ASX 4 February 2026).”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 70.7 years before this release

inferredYellow Cat Uranium-Vanadium Project · uraniumTonnes: 38250Grade: 0.24Grade Unit: % U₃O₈Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Yellow Cat Uranium-Vanadium Project
Commodity
uranium
Region
usa_ut
Reported Region
Utah, USA
Ticker
ASN

Resource scope

Estimate type
resource
Reporting standards
other
QP Signed
Yes
Qualified person names
Peter (Greg) Knox
Resource group id
resource:6ac9a8dd5f264a720121

Resource Data

Category
inferred
Tonnes
38250
Grade
0.24
Grade Unit
% U₃O₈

Prior Estimate

Resource Date
1956

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
1956-01-01T00:00:00.000Z

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: This sub-estimate for uranium at Yellow Cat is historical, not JORC compliant, and based on very old data, making it highly speculative and unreliable for current resource assessment.

Negative factors

  • Historical estimate only, not JORC compliant
  • Uncertainty that further exploration will result in a JORC Mineral Resource
  • Data is very old (1950s) and pre-dates modern QA/QC practices

Evidence · text

“38,250 tons at 0.24% U₃O₈ and 1.50% V₂O₅”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 70.7 years before this release

inferredYellow Cat Uranium-Vanadium Project · vanadiumTonnes: 38250Grade: 1.5Grade Unit: % V₂O₅Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Yellow Cat Uranium-Vanadium Project
Commodity
vanadium
Region
usa_ut
Reported Region
Utah, USA
Ticker
ASN

Resource scope

Estimate type
resource
Reporting standards
other
QP Signed
Yes
Qualified person names
Peter (Greg) Knox
Resource group id
resource:6ac9a8dd5f264a720121

Resource Data

Category
inferred
Tonnes
38250
Grade
1.5
Grade Unit
% V₂O₅

Prior Estimate

Resource Date
1956

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
1956-01-01T00:00:00.000Z

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: This sub-estimate for vanadium at Yellow Cat is historical, not JORC compliant, and based on very old data, making it highly speculative and unreliable for current resource assessment.

Negative factors

  • Historical estimate only, not JORC compliant
  • Uncertainty that further exploration will result in a JORC Mineral Resource
  • Data is very old (1950s) and pre-dates modern QA/QC practices

Evidence · text

“38,250 tons at 0.24% U₃O₈ and 1.50% V₂O₅”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 70.7 years before this release

inferredYellow Cat Uranium-Vanadium Project · uraniumTonnes: 18600Grade: 0.24Grade Unit: % U₃O₈Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Yellow Cat Uranium-Vanadium Project
Commodity
uranium
Region
usa_ut
Reported Region
Utah, USA
Ticker
ASN

Resource scope

Estimate type
resource
Reporting standards
other
QP Signed
Yes
Qualified person names
Peter (Greg) Knox
Resource group id
resource:3b006b9997ee1bef26c2

Resource Data

Category
inferred
Tonnes
18600
Grade
0.24
Grade Unit
% U₃O₈

Prior Estimate

Resource Date
1956

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
1956-01-01T00:00:00.000Z

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: This sub-estimate for uranium at Yellow Cat is historical, not JORC compliant, and based on very old data, making it highly speculative and unreliable for current resource assessment.

Negative factors

  • Historical estimate only, not JORC compliant
  • Uncertainty that further exploration will result in a JORC Mineral Resource
  • Data is very old (1950s) and pre-dates modern QA/QC practices

Evidence · text

“18,600 tons at 0.24% U₃O₈ and 1.42% V₂O₅”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 70.7 years before this release

inferredYellow Cat Uranium-Vanadium Project · vanadiumTonnes: 18600Grade: 1.42Grade Unit: % V₂O₅Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Yellow Cat Uranium-Vanadium Project
Commodity
vanadium
Region
usa_ut
Reported Region
Utah, USA
Ticker
ASN

Resource scope

Estimate type
resource
Reporting standards
other
QP Signed
Yes
Qualified person names
Peter (Greg) Knox
Resource group id
resource:3b006b9997ee1bef26c2

Resource Data

Category
inferred
Tonnes
18600
Grade
1.42
Grade Unit
% V₂O₅

Prior Estimate

Resource Date
1956

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
1956-01-01T00:00:00.000Z

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: This sub-estimate for vanadium at Yellow Cat is historical, not JORC compliant, and based on very old data, making it highly speculative and unreliable for current resource assessment.

Negative factors

  • Historical estimate only, not JORC compliant
  • Uncertainty that further exploration will result in a JORC Mineral Resource
  • Data is very old (1950s) and pre-dates modern QA/QC practices

Evidence · text

“18,600 tons at 0.24% U₃O₈ and 1.42% V₂O₅”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 70.7 years before this release

inferredThe Surprise · leadTonnes: 103000Grade: 2781Grade Unit: tView all details
Link to this fact

Identity

Project
The Surprise
Commodity
lead
Ticker
ASN

Resource scope

Estimate type
resource
Resource group id
resource:3060c0bac9c52f79722f

Resource Data

Category
inferred
Tonnes
103000
Grade
2781
Grade Unit
t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“2,781”

Context: 103,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredThe Surprise · zincTonnes: 103000Grade: 464Grade Unit: tView all details
Link to this fact

Identity

Project
The Surprise
Commodity
zinc
Ticker
ASN

Resource scope

Estimate type
resource
Resource group id
resource:3060c0bac9c52f79722f

Resource Data

Category
inferred
Tonnes
103000
Grade
464
Grade Unit
t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“464”

Context: 103,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredThe Surprise · silverTonnes: 103000Grade: 1.3Grade Unit: g/tContained Metal: 4723Contained Unit: ozView all details
Link to this fact

Identity

Project
The Surprise
Commodity
silver
Ticker
ASN

Resource scope

Estimate type
resource
Resource group id
resource:3060c0bac9c52f79722f

Resource Data

Category
inferred
Tonnes
103000
Grade
1.3
Grade Unit
g/t
Contained Metal
4723
Contained Unit
oz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-09-30T00:00:00.000Z

Reasoning: Expanded from multi-commodity resource table for completeness.

Negative factors

  • Fact expanded from resource table columns (model omitted this commodity).

Evidence · table

“1.3”

Context: 103,000

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.