AKM: Ovoot Coal Reserve Update Additional JORC Disclosure

Original announcement by asx on

Company
Aspire Mining Limited
Ticker
AKM
Exchange
ASX
Region
Mongolia
Primary commodity
Coal
Secondary commodities
None reported
Document categories
Resource update, Other
Extracted
2026-10-07 00:10:42 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Aspire Mining Limited has reconfirmed its Coal Reserve estimate for the Ovoot Coking Coal Project in Mongolia, reporting a Total Coal Reserve of 130.1 million tonnes and a Marketable Coal Reserve of 97.9 million tonnes, effective 31 March 2026. An updated economic evaluation, incorporating a revised development strategy and lower initial capital expenditure, indicates a post-tax NPV10 of US$1.48 billion and a post-tax real IRR of 60%. The update also details a financing strategy assuming US$126.0 million in Mongolian OTC bond issues and US$42.0 million in deferred payments for infrastructure.

Reasoning: The document reconfirms existing coal reserves and updates the project's economic evaluation based on a revised development and financing strategy. While the NPV decreased, the project still shows robust economics with a high IRR and reduced initial capital expenditure, which is a positive for project advancement. The reserve quantities themselves are unchanged, limiting geological novelty.

Positive factors

  • Reconfirmation of substantial coal reserves
  • Strong post-tax IRR of 60%
  • Lower initial CAPEX due to revised development strategy
  • JORC compliant and QP signed

Negative factors

  • NPV decreased compared to previous estimate
  • Reserve quantities are unchanged, indicating no geological growth
  • 12% of production target underpinned by Inferred Resources

Facts used in scoring: 18

Classification and evidence

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The updated Coal Reserve estimate is reported in accordance with the JORC Code (2012).

Evidence · text

“updated Coal Reserve estimate reported in accordance with the JORC Code (2012)”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The Coal Reserve estimation was carried out and reported by Mr Buyan-Ulzii Narankhuu, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy.

Evidence · text

“information in this announcement that relates to Coal Reserves is based on information compiled by Mr Buyan-Ulzii Narankhuu, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy (Member № 327826).”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document provides an updated Coal Reserve estimate for the Ovoot Coking Coal Project.

Evidence · text

“Ovoot Coal Reserve Update Supports Strong Project Economics”

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: The Coal Reserve estimate is supported by work at least equivalent to Pre-Feasibility Study level.

Evidence · text

“The Coal Reserve remains supported by work at least equivalent to Pre-Feasibility Study level.”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: Approximately 12% of the total ROM coal scheduled to be mined is from areas classified as Inferred Coal Resource and is not included within the Coal Reserve.

Evidence · text

“12% is from areas classified as Inferred Coal Resource and is not included within the Coal Reserve.”

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: The updated post-tax NPV10 of US$1.48 billion is lower than the previous estimate of US$1.58 billion.

Evidence · table

“US$1.48 billion”

Context: US$1.58 billion

Extracted facts

Stored fact records: 18. Some facts used in scoring do not have a stored record.

Resource Estimates (18)

provenOvoot Coking Coal Project · coalTonnes: 76800000View all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Commodity
coal
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Estimate type
reserve
Effective date
2026-03-31T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Buyan-Ulzii Narankhuu
Resource group id
resource:484bbf2b7d281791b495
Mining method
combined

Resource Data

Category
proven
Tonnes
76800000
Cutoff Grade
0.3
Cutoff Unit
m

Prior Estimate

Resource Date
2026-03-31
Prior Tonnes
76800000

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The Proved Coal Reserve of 76.8 Mt is a substantial quantity in a high-confidence category, reconfirming the project's foundation, though it shows no growth from the prior estimate.

Positive factors

  • Large tonnage in high-confidence category
  • Reconfirmed from previous estimate

Negative factors

  • No increase in tonnage from previous estimate

Evidence · table

“76.8”

Context: 75.0

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableOvoot Coking Coal Project · coalTonnes: 53300000View all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Commodity
coal
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Estimate type
reserve
Effective date
2026-03-31T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Buyan-Ulzii Narankhuu
Resource group id
resource:bdbbe6bbe8dbbdadc1d5
Mining method
combined

Resource Data

Category
probable
Tonnes
53300000
Cutoff Grade
0.3
Cutoff Unit
m

Prior Estimate

Resource Date
2026-03-31
Prior Tonnes
53300000

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The Probable Coal Reserve of 53.3 Mt is a significant quantity, reconfirming the project's scale, though it shows no growth from the prior estimate.

Positive factors

  • Significant tonnage in Probable category
  • Reconfirmed from previous estimate

Negative factors

  • No increase in tonnage from previous estimate

Evidence · table

“53.3”

Context: 52.0

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

provenOvoot Coking Coal Project · coalTonnes: 60000000View all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Commodity
coal
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Estimate type
reserve
Effective date
2026-03-31T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Buyan-Ulzii Narankhuu
Resource group id
resource:0497953eb0d837a345ac
Mining method
combined

Resource Data

Category
proven
Tonnes
60000000
Cutoff Grade
0.3
Cutoff Unit
m

Prior Estimate

Resource Date
2026-03-31
Prior Tonnes
60000000

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The Marketable Proved Coal Reserve of 60.0 Mt is a substantial quantity, reconfirming the project's foundation, though it shows no growth from the prior estimate.

Positive factors

  • Large marketable tonnage in high-confidence category
  • Reconfirmed from previous estimate

Negative factors

  • No increase in tonnage from previous estimate

Evidence · table

“60.0”

Context: 75.0

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableOvoot Coking Coal Project · coalTonnes: 37900000Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Commodity
coal
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Estimate type
reserve
Effective date
2026-03-31T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Buyan-Ulzii Narankhuu
Resource group id
resource:f2a62fc30776b1761b44
Mining method
combined

Resource Data

Category
probable
Tonnes
37900000
Cutoff Grade
0.3
Cutoff Unit
m

Prior Estimate

Resource Date
2026-03-31
Prior Tonnes
37900000

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The Marketable Probable Coal Reserve of 37.9 Mt is a significant quantity, reconfirming the project's scale, though it shows no growth from the prior estimate.

Positive factors

  • Significant marketable tonnage in Probable category
  • Reconfirmed from previous estimate

Negative factors

  • No increase in tonnage from previous estimate

Evidence · table

“37.9”

Context: 52.0

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredOvoot Coking Coal Project · coalTonnes: 99500000Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Commodity
coal
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Estimate type
resource
Effective date
2024-10-31T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Buyan-Ulzii Narankhuu
Resource group id
resource:b1dd0caf9b0cd5e4f070

Resource Data

Category
measured
Tonnes
99500000
Cutoff Grade
0.3
Cutoff Unit
m

Prior Estimate

Resource Date
2024-10-31

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-11-22T00:00:00.000Z

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The Measured Coal Resource of 99.5 Mt is a substantial quantity, but this is a re-statement of a prior estimate and not new information.

Positive factors

  • Large tonnage in high-confidence category

Negative factors

  • This is a re-statement of a prior resource estimate, not new information

Evidence · text

“99.5 Mt Measured”

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedOvoot Coking Coal Project · coalTonnes: 100900000Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Commodity
coal
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Estimate type
resource
Effective date
2024-10-31T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Buyan-Ulzii Narankhuu
Resource group id
resource:efb4487c24d0842f0265

Resource Data

Category
indicated
Tonnes
100900000
Cutoff Grade
0.3
Cutoff Unit
m

Prior Estimate

Resource Date
2024-10-31

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-11-22T00:00:00.000Z

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The Indicated Coal Resource of 100.9 Mt is a substantial quantity, but this is a re-statement of a prior estimate and not new information.

Positive factors

  • Large tonnage in Indicated category

Negative factors

  • This is a re-statement of a prior resource estimate, not new information

Evidence · text

“100.9 Mt Indicated”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredOvoot Coking Coal Project · coalTonnes: 19000000Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Commodity
coal
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Estimate type
resource
Effective date
2024-10-31T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Buyan-Ulzii Narankhuu
Resource group id
resource:f0d4b02fe5f8cfc23917

Resource Data

Category
inferred
Tonnes
19000000
Cutoff Grade
0.3
Cutoff Unit
m

Prior Estimate

Resource Date
2024-10-31

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-11-22T00:00:00.000Z

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The Inferred Coal Resource of 19.0 Mt is a re-statement of a prior estimate and represents a lower confidence category.

Negative factors

  • This is a re-statement of a prior resource estimate, not new information
  • Inferred category has low geological confidence

Evidence · text

“19.0 Mt Inferred”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 8Ovoot Coking Coal Project · coalTonnes: 219400000Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Commodity
coal
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Estimate type
resource
Effective date
2024-10-31T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Buyan-Ulzii Narankhuu
Resource group id
resource:c187abf2e98d2094ce76

Resource Data

Tonnes
219400000
Cutoff Grade
0.3
Cutoff Unit
m

Prior Estimate

Resource Date
2024-10-31

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-11-22T00:00:00.000Z

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The Total Coal Resource of 219.4 Mt is a very large quantity, but this is a re-statement of a prior estimate and not new information.

Positive factors

  • Very large total resource tonnage

Negative factors

  • This is a re-statement of a prior resource estimate, not new information

Evidence · text

“Total Coal Resource of 219.4 Mt”

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 9Ovoot Coking Coal ProjectGrade: 1.48Grade Unit: billion USDView all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Effective date
2024-11-13T00:00:00.000Z
Resource group id
resource:368c5066dea25ebf709a
Mining method
combined

Resource Data

Grade
1.48
Grade Unit
billion USD

Prior Estimate

Prior Grade
1.58

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The post-tax NPV10 of US$1.48 billion is a significant valuation, but it represents a decrease from the previous estimate, indicating a slight negative change in project value.

Positive factors

  • High absolute NPV value

Negative factors

  • NPV decreased compared to previous estimate

Evidence · text

“post-tax NPV₁₀ of US$1.48 billion”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Grade Declinenegative

Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: 1.48 against 1.58 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 10Ovoot Coking Coal ProjectGrade: 60Grade Unit: %View all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Effective date
2024-11-13T00:00:00.000Z
Resource group id
resource:368c5066dea25ebf709a
Mining method
combined

Resource Data

Grade
60
Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: A post-tax real IRR of 60% is exceptionally high, indicating very strong project economics and profitability, even with the updated cost model.

Positive factors

  • Extremely high IRR indicates strong project profitability and resilience

Evidence · text

“60% IRR”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 11Ovoot Coking Coal ProjectGrade: 61.2Grade Unit: million USDView all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Effective date
2024-11-13T00:00:00.000Z
Resource group id
resource:368c5066dea25ebf709a
Mining method
combined

Resource Data

Grade
61.2
Grade Unit
million USD

Prior Estimate

Prior Grade
214.8

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The Phase 1 pre-production capital expenditure of US$61.2 million is a substantial reduction from the previous US$214.8 million, which is a strong positive for project financing and de-risking.

Positive factors

  • Significantly reduced initial capital expenditure compared to previous estimate
  • Lower CAPEX improves project funding viability

Evidence · text

“Phase 1 pre-production capital expenditure of approximately US$61.2 million”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Grade Declinenegative

Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: 61.2 against 214.8 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 12Ovoot Coking Coal Project · coalGrade: 230Grade Unit: USD/tView all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Commodity
coal
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Effective date
2024-11-13T00:00:00.000Z
Resource group id
resource:368c5066dea25ebf709a
Mining method
combined

Resource Data

Grade
230
Grade Unit
USD/t

Prior Estimate

Prior Grade
230

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The long-term coking coal price assumption of US$230/t DDP Erlian is unchanged from the previous assessment, providing stability to the economic model.

Evidence · text

“long-term coking coal sales price assumption of US$230/t DDP Erlian, China, unchanged from the previous economic assessment”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 13Ovoot Coking Coal ProjectGrade: 10Grade Unit: %View all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Effective date
2024-11-13T00:00:00.000Z
Resource group id
resource:368c5066dea25ebf709a
Mining method
combined

Resource Data

Grade
10
Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: A 10% real post-tax discount rate is a standard assumption for economic evaluations.

Evidence · text

“a 10% real post-tax discount rate”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 14Ovoot Coking Coal ProjectGrade: 126Grade Unit: million USDView all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Effective date
2024-11-13T00:00:00.000Z
Resource group id
resource:368c5066dea25ebf709a
Mining method
combined

Resource Data

Grade
126
Grade Unit
million USD

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The assumption of progressively raising US$126.0 million through Mongolian OTC bond issues provides a clear financing pathway for the project, though it is an assumption for the economic model.

Positive factors

  • Identified financing strategy supports project development

Negative factors

  • Financing is an assumption and not guaranteed

Evidence · text

“progressively raise approximately US$126.0 million through Mongolian OTC bond issues”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 15Ovoot Coking Coal ProjectGrade: 12Grade Unit: % p.a.View all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Effective date
2024-11-13T00:00:00.000Z
Resource group id
resource:368c5066dea25ebf709a
Mining method
combined

Resource Data

Grade
12
Grade Unit
% p.a.

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: The assumed 12% p.a. coupon payments for the OTC bonds represent a significant cost of capital, which is factored into the economic model.

Negative factors

  • 12% coupon rate is a significant cost of capital

Evidence · text

“12% p.a. coupon payments”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 16Ovoot Coking Coal ProjectGrade: 3Grade Unit: %View all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Effective date
2024-11-13T00:00:00.000Z
Resource group id
resource:368c5066dea25ebf709a
Mining method
combined

Resource Data

Grade
3
Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: Broker success fees of approximately 3% on amounts raised are a standard cost of capital raising, factored into the economic model.

Negative factors

  • Broker success fees add to the cost of financing

Evidence · text

“broker success fees of approximately 3%”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 17Ovoot Coking Coal ProjectGrade: 24Grade Unit: monthsView all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Effective date
2024-11-13T00:00:00.000Z
Resource group id
resource:368c5066dea25ebf709a
Mining method
combined

Resource Data

Grade
24
Grade Unit
months

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: An assumed term of 24 months for each tranche of bonds provides a clear repayment schedule for the financing.

Evidence · text

“assumed term of 24 months for each tranche”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Fact 18Ovoot Coking Coal ProjectGrade: 42Grade Unit: million USDView all details
Link to this fact

Identity

Project
Ovoot Coking Coal Project
Region
mongolia
Reported Region
Mongolia
Ticker
AKM

Resource scope

Effective date
2024-11-13T00:00:00.000Z
Resource group id
resource:368c5066dea25ebf709a
Mining method
combined

Resource Data

Grade
42
Grade Unit
million USD

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-06T00:00:00.000Z

Reasoning: Approximately US$42.0 million of deferred payments to CCTEG-IEC, supported by vendor financing, significantly reduces the immediate capital outlay for the project.

Positive factors

  • Deferred payments reduce upfront capital requirements
  • Vendor financing supported by Sinosure reduces risk

Evidence · text

“approximately US$42.0 million of deferred payments to CCTEG-IEC”

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.