ACS: Amended Announcement

Original announcement by asx on

Company
Accent Resources NL
Ticker
ACS
Exchange
ASX
Region
Western Australia
Primary commodity
Iron ore
Secondary commodities
None reported
Document categories
Metallurgy
Extracted
2026-10-14 10:11:25 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Accent Resources NL re-released metallurgical testwork results for its Magnetite Range Project, confirming the technical viability of a dry processing flowsheet. Preliminary bench-scale tests achieved high-grade magnetite concentrates (up to 68.0% Fe) with strong magnetic iron recoveries (up to 98.2%). An additional wet cleaning stage further upgraded concentrates to over 70% Fe, providing technical support for a water-efficient processing route in the ongoing Pre-Feasibility Study.

Reasoning: This amended announcement re-releases previously reported preliminary bench-scale metallurgical testwork results for the Magnetite Range Project. The dry magnetic separation achieved high magnetic iron recoveries (up to 98.2%) and high-grade concentrates (up to 68.0% Fe), supporting a water-efficient processing option for the PFS. Wet magnetic cleaning further upgraded concentrates to over 70% Fe, but also showed the presence of deleterious elements. The results are positive for project viability but are not new information.

Positive factors

  • High Recovery
  • QP/CP Signed
  • JORC Compliant

Negative factors

  • Bench Scale Only
  • Stale Data Re-release
  • Deleterious Elements Present

Facts used in scoring: 8

Classification and evidence

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: Magnetic iron recovery for three high-grade samples ranged from 97.0% to 98.2%, exceeding the exceptional threshold for iron ore.

Evidence · text

“Overall magnetic iron recovery for the four tests reached 98.21%.”

Bench Scale Onlynegative

Only preliminary bench tests completed — no locked-cycle or pilot work.

Why it applies: The testwork is described as preliminary bench scale outcomes, indicating early-stage testing.

Evidence · text

“These results are preliminary bench scale outcomes and are not a final process design or production forecast.”

QP/CP Signedpositive · Story-specific tag

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The metallurgical information is compiled by Mr Aaron Debono, a Competent Person and Fellow of the Australasian Institute of Mining and Metallurgy.

Evidence · text

“The information in this report that relates to Metallurgy is based on, and fairly reflects, information compiled by Mr Aaron Debono, a Competent Person, who is a full-time employee of NeoMet Engineering Pty Ltd and a Fellow of the Australasian Institute of Mining and Metallurgy.”

JORC Compliantpositive · Story-specific tag

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The metallurgical information is reported in accordance with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC).

Evidence · text

“Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.”

Deleterious Elements Presentnegative · Story-specific tag

Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.

Why it applies: Wet magnetic separation concentrate results include levels of SiO₂, Al₂O₃, S, and P, which can be deleterious elements in iron ore concentrates.

Evidence · table

“SiO₂%”

Context: J-UBIF-01

Stale Data Re-releasenegative · Story-specific tag

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: This announcement is an amendment to a prior release dated 30 September 2026, re-releasing the same metallurgical results with additional context rather than new testwork.

Evidence · text

“Accent Resources NL (ASX: ACS) (Accent or the Company) provides this amended announcement to its release dated 30 September 2026, titled “Testwork Confirms Technical Viability of Dry Processing Flowsheet”.”

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: the document describes a flotation route ("concentrate")

Multi-Domain Testedpositive

Variability across ore domains (oxide, transition, fresh) has been addressed.

Why it applies: 4 distinct composites were tested

Extracted facts

Stored fact records: 8. Some facts used in scoring do not have a stored record.

Metallurgical Results (8)

dual drum dry magnetic separationMagnetite Range Project · iron_oreRecovery: 97 %Head Grade: 34.74Head Grade Unit: % FeHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Magnetite Range Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
ACS

Test Work

Program Status
preliminary
Test Type
dual drum dry magnetic separation
Processing Route
dual drum dry magnetic separation
Sample
J-UBIF-01
Grind P80
75 µm

Recovery

Recovery
97 %
Recovery Basis
actual_test
Head Grade
34.74
Head Grade Unit
% Fe
Conc. Grade
67.1
Conc. Grade Unit
% Fe
Mass Pull
44.1 %

Lab

Laboratory
LONGI Magnet Co., Ltd.
Consultant
NeoMet Engineering Pty Ltd

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-09-30T00:00:00.000Z

Dates

Event date
2026-10-14T00:00:00.000Z

Reasoning: High magnetic iron recovery of 97.0% and high concentrate grade of 67.1% Fe from preliminary bench-scale dry magnetic separation testwork, though these results were previously released.

Positive factors

  • High Recovery
  • QP/CP Signed
  • JORC Compliant

Negative factors

  • Bench Scale Only
  • Stale Data Re-release

Evidence · table

“97.0”

Context: J-UBIF-01

dual drum dry magnetic separationMagnetite Range Project · iron_oreRecovery: 98.2 %Head Grade: 36.03Head Grade Unit: % FeHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Magnetite Range Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
ACS

Test Work

Program Status
preliminary
Test Type
dual drum dry magnetic separation
Processing Route
dual drum dry magnetic separation
Sample
J-LBIF-02
Grind P80
75 µm

Recovery

Recovery
98.2 %
Recovery Basis
actual_test
Head Grade
36.03
Head Grade Unit
% Fe
Conc. Grade
66.7
Conc. Grade Unit
% Fe
Mass Pull
49.3 %

Lab

Laboratory
LONGI Magnet Co., Ltd.
Consultant
NeoMet Engineering Pty Ltd

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-09-30T00:00:00.000Z

Dates

Event date
2026-10-14T00:00:00.000Z

Reasoning: High magnetic iron recovery of 98.2% and high concentrate grade of 66.7% Fe from preliminary bench-scale dry magnetic separation testwork, though these results were previously released.

Positive factors

  • High Recovery
  • QP/CP Signed
  • JORC Compliant

Negative factors

  • Bench Scale Only
  • Stale Data Re-release

Evidence · table

“98.2”

Context: J-LBIF-02

dual drum dry magnetic separationMagnetite Range Project · iron_oreRecovery: 98.2 %Head Grade: 33.3Head Grade Unit: % FeHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Magnetite Range Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
ACS

Test Work

Program Status
preliminary
Test Type
dual drum dry magnetic separation
Processing Route
dual drum dry magnetic separation
Sample
R-LBIF-12
Grind P80
75 µm

Recovery

Recovery
98.2 %
Recovery Basis
actual_test
Head Grade
33.3
Head Grade Unit
% Fe
Conc. Grade
68
Conc. Grade Unit
% Fe
Mass Pull
42.7 %

Lab

Laboratory
LONGI Magnet Co., Ltd.
Consultant
NeoMet Engineering Pty Ltd

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-09-30T00:00:00.000Z

Dates

Event date
2026-10-14T00:00:00.000Z

Reasoning: High magnetic iron recovery of 98.2% and high concentrate grade of 68.0% Fe from preliminary bench-scale dry magnetic separation testwork, though these results were previously released.

Positive factors

  • High Recovery
  • QP/CP Signed
  • JORC Compliant

Negative factors

  • Bench Scale Only
  • Stale Data Re-release

Evidence · table

“98.2”

Context: R-LBIF-12

dual drum dry magnetic separationMagnetite Range Project · iron_oreRecovery: 88.3 %Head Grade: 24.83Head Grade Unit: % FeHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Magnetite Range Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
ACS

Test Work

Program Status
preliminary
Test Type
dual drum dry magnetic separation
Processing Route
dual drum dry magnetic separation
Sample
R-LBIF-14
Grind P80
75 µm

Recovery

Recovery
88.3 %
Recovery Basis
actual_test
Head Grade
24.83
Head Grade Unit
% Fe
Conc. Grade
66.3
Conc. Grade Unit
% Fe
Mass Pull
21.1 %

Lab

Laboratory
LONGI Magnet Co., Ltd.
Consultant
NeoMet Engineering Pty Ltd

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-09-30T00:00:00.000Z

Dates

Event date
2026-10-14T00:00:00.000Z

Reasoning: High concentrate grade of 66.3% Fe but lower magnetic iron recovery of 88.3% from preliminary bench-scale dry magnetic separation testwork on a low-grade sample, though these results were previously released.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • Bench Scale Only
  • Stale Data Re-release
  • Low Recovery

Evidence · table

“88.3”

Context: R-LBIF-14*

wet magnetic separationMagnetite Range Project · iron_oreRecovery: 81.93 %Head Grade: 34.74Head Grade Unit: % FeHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Magnetite Range Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
ACS

Test Work

Program Status
preliminary
Test Type
wet magnetic separation
Processing Route
wet magnetic separation (LJC unit)
Sample
J-UBIF-01
Grind P80
74 µm

Recovery

Recovery
81.93 %
Recovery Basis
actual_test
Head Grade
34.74
Head Grade Unit
% Fe
Conc. Grade
70.08
Conc. Grade Unit
% Fe
Mass Pull
40.52 %

Lab

Laboratory
LONGI Magnet Co., Ltd.
Consultant
NeoMet Engineering Pty Ltd

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-09-30T00:00:00.000Z

Dates

Event date
2026-10-14T00:00:00.000Z

Reasoning: Very high concentrate grade of 70.08% Fe from preliminary bench-scale wet magnetic separation testwork, though these results were previously released. Deleterious elements are present in the concentrate.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • Bench Scale Only
  • Stale Data Re-release
  • Deleterious Elements Present

Evidence · table

“81.93”

Context: J-UBIF-01

wet magnetic separationMagnetite Range Project · iron_oreRecovery: 88.69 %Head Grade: 36.03Head Grade Unit: % FeHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Magnetite Range Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
ACS

Test Work

Program Status
preliminary
Test Type
wet magnetic separation
Processing Route
wet magnetic separation (LJC unit)
Sample
J-LBIF-02
Grind P80
74 µm

Recovery

Recovery
88.69 %
Recovery Basis
actual_test
Head Grade
36.03
Head Grade Unit
% Fe
Conc. Grade
69.67
Conc. Grade Unit
% Fe
Mass Pull
45.88 %

Lab

Laboratory
LONGI Magnet Co., Ltd.
Consultant
NeoMet Engineering Pty Ltd

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-09-30T00:00:00.000Z

Dates

Event date
2026-10-14T00:00:00.000Z

Reasoning: Very high concentrate grade of 69.67% Fe from preliminary bench-scale wet magnetic separation testwork, though these results were previously released. Deleterious elements are present in the concentrate.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • Bench Scale Only
  • Stale Data Re-release
  • Deleterious Elements Present

Evidence · table

“88.69”

Context: J-LBIF-02

wet magnetic separationMagnetite Range Project · iron_oreRecovery: 85.39 %Head Grade: 33.3Head Grade Unit: % FeHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Magnetite Range Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
ACS

Test Work

Program Status
preliminary
Test Type
wet magnetic separation
Processing Route
wet magnetic separation (LJC unit)
Sample
R-LBIF-12
Grind P80
74 µm

Recovery

Recovery
85.39 %
Recovery Basis
actual_test
Head Grade
33.3
Head Grade Unit
% Fe
Conc. Grade
70.3
Conc. Grade Unit
% Fe
Mass Pull
40.27 %

Lab

Laboratory
LONGI Magnet Co., Ltd.
Consultant
NeoMet Engineering Pty Ltd

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-09-30T00:00:00.000Z

Dates

Event date
2026-10-14T00:00:00.000Z

Reasoning: Very high concentrate grade of 70.3% Fe from preliminary bench-scale wet magnetic separation testwork, though these results were previously released. Deleterious elements are present in the concentrate.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • Bench Scale Only
  • Stale Data Re-release
  • Deleterious Elements Present

Evidence · table

“85.39”

Context: R-LBIF-12

wet magnetic separationMagnetite Range Project · iron_oreRecovery: 59.18 %Head Grade: 24.83Head Grade Unit: % FeHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Magnetite Range Project
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
ACS

Test Work

Program Status
preliminary
Test Type
wet magnetic separation
Processing Route
wet magnetic separation (LJC unit)
Sample
R-LBIF-14
Grind P80
74 µm

Recovery

Recovery
59.18 %
Recovery Basis
actual_test
Head Grade
24.83
Head Grade Unit
% Fe
Conc. Grade
69.97
Conc. Grade Unit
% Fe
Mass Pull
21.01 %

Lab

Laboratory
LONGI Magnet Co., Ltd.
Consultant
NeoMet Engineering Pty Ltd

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-09-30T00:00:00.000Z

Dates

Event date
2026-10-14T00:00:00.000Z

Reasoning: Very high concentrate grade of 69.97% Fe but low recovery of 59.18% from preliminary bench-scale wet magnetic separation testwork on a low-grade sample, though these results were previously released. Deleterious elements are present in the concentrate.

Positive factors

  • QP/CP Signed
  • JORC Compliant

Negative factors

  • Bench Scale Only
  • Stale Data Re-release
  • Deleterious Elements Present
  • Low Recovery

Evidence · table

“59.18*”

Context: R-LBIF-14

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.