# AbraSilver's Definitive Feasibility Study Positions Diablillos Among the Premier Undeveloped Silver-Gold Projects Globally with CAD$4.2B After-Tax NPV5% &amp; 42% IRR

Canonical Atlas analysis: https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038

Original source: https://money.tmx.com/en/quote/ABRA/news/5716627007352047/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier

Publisher: tmx

Original announcement: 2026-06-22T21:15:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: Unknown date

Atlas analysis updated: Unknown date

- Company: AbraSilver Resource Corp.

- Ticker: ABRA

- Exchange: TSX

- Region: Argentina

- Primary commodity: Silver

- Secondary commodities: Gold

- Document categories: Resource update, Production

- Extracted: 2026-08-20 21:40:38 UTC

Narrative sentiment: 0.90 · Bullish

## Minestarters Atlas summary

AbraSilver's Definitive Feasibility Study for the Diablillos silver-gold project reveals robust economics, including a CAD$4.2 billion after-tax NPV5% and a 41.9% IRR at base-case metal prices. The study outlines a 25-year mine life with average annual production of 10.3 Moz silver equivalent, supported by increased Proven and Probable Mineral Reserves of 77.9 Mt. Initial capital expenditures are estimated at $721.5 million, with low All-in Sustaining Cash Costs of $20/oz AgEq over the life of mine.

Reasoning: The Definitive Feasibility Study for the Diablillos project demonstrates robust economics with a high after-tax NPV of CAD$4.2 billion and an IRR of 41.9%, coupled with low operating costs and a significant increase in Proven and Probable Mineral Reserves, positioning it as a premier undeveloped silver-gold project.

- Positive factor: High NPV

- Positive factor: High IRR

- Positive factor: Low AISC

- Positive factor: Increased Proven and Probable Reserves

- Positive factor: Long LOM

- Positive factor: Strong production profile

- Positive factor: QP/CP Signed

- Positive factor: NI 43-101 Compliant

- Positive factor: Category Upgrade

- Positive factor: Tonnage Growth

- Positive factor: Contained Metal Growth

- Positive factor: Cut-off Disclosed

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 43

## Classification and evidence

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: The document is a Definitive Feasibility Study \(DFS\) for the Diablillos project.

Evidence · text

> AbraSilver's Definitive Feasibility Study Positions Diablillos Among the Premier Undeveloped Silver-Gold Projects Globally with CAD$4.2B After-Tax NPV5% &amp; 42% IRR

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: The Mineral Reserves Estimate is signed off by Mr. Miguel Fuentealba, P. Eng., and other Qualified Persons are listed.

Evidence · text

> The Qualified Person for the Mineral Reserves Estimate is Mr. Miguel Fuentealba, P. Eng.

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: The Technical Report will be completed in accordance with National Instrument 43-101.

Evidence · text

> The Technical Report will be completed in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects \("NI 43-101"\)

**Proven Reserve**

Polarity: positive

Definition: Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The document reports Proven Mineral Reserves in Table 6.

Evidence · table

> Proven

Context: Mineral Reserve \(all domains\)

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The document reports Probable Mineral Reserves in Table 6.

Evidence · table

> Probable

Context: Mineral Reserve \(all domains\)

**Contained Metal Growth**

Polarity: positive

Definition: True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: The DFS highlights 'Increased Proven and Probable Mineral Reserves' containing 183 Moz Ag and 1.8 Moz Au \(366 Moz AgEq\).

Evidence · text

> Increased Proven and Probable Mineral Reserves of 77.9 Mt grading 146 g/t Ag Eq, containing 183 Moz Ag and 1.8 Moz Au \(366 Moz AgEq\)

**Tonnage Growth**

Polarity: positive

Definition: Significant tonnage increase \(≥15%\) vs prior estimate with grade maintained or improved.

Why it applies: The DFS highlights 'Increased Proven and Probable Mineral Reserves of 77.9 Mt'.

Evidence · text

> Increased Proven and Probable Mineral Reserves of 77.9 Mt

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The Mineral Reserve estimate was based on an equivalent cut-off grade of approximately 38 g/t AgEq.

Evidence · text

> The NVB method matches an equivalent cut-off grade of approximately 38 g/t AgEq.

**Resource Update**

Polarity: neutral

Definition: Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The DFS includes an updated Mineral Reserve estimate.

Evidence · text

> The DFS mine plan is based on an updated Mineral Reserve estimate

## Extracted facts

Stored fact records: 43. Some facts used in scoring do not have a stored record.

## Resource Estimates (43)

### proven

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-0)

Diablillos · silver

#### Identity

- Project: Diablillos
- Commodity: silver
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Category: proven
- Tonnes: 36547000
- Grade: 104
- Grade Unit: g/t
- Contained Metal: 122452000
- Contained Unit: oz
- Cutoff Grade: 38

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The Proven Mineral Reserve for silver represents a high-confidence estimate with substantial contained metal, contributing significantly to the project's overall value.

- Positive factor: High confidence category

- Positive factor: Significant contained metal

Evidence · table

> 104

Context: 36,547

### proven

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-1)

Diablillos · gold

#### Identity

- Project: Diablillos
- Commodity: gold
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Category: proven
- Tonnes: 36547000
- Grade: 0.71
- Grade Unit: g/t
- Contained Metal: 840000
- Contained Unit: oz
- Cutoff Grade: 38

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The Proven Mineral Reserve for gold provides a high-confidence estimate of contained gold, adding to the project's economic robustness.

- Positive factor: High confidence category

- Positive factor: Significant contained metal

Evidence · table

> 0.71

Context: 36,547

### proven

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-2)

Diablillos · silver

#### Identity

- Project: Diablillos
- Commodity: silver
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Category: proven
- Tonnes: 36547000
- Grade: 178
- Grade Unit: g/t
- Contained Metal: 209536000
- Contained Unit: oz
- Cutoff Grade: 38

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The Proven Mineral Reserve for silver equivalent provides a comprehensive high-confidence estimate of total contained metal, with disclosed assumptions for the equivalent calculation.

- Positive factor: High confidence category

- Positive factor: Significant contained metal

- Positive factor: Metal equivalent disclosed

Evidence · table

> 178

Context: 36,547

### probable

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-3)

Diablillos · silver

#### Identity

- Project: Diablillos
- Commodity: silver
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Category: probable
- Tonnes: 41364000
- Grade: 46
- Grade Unit: g/t
- Contained Metal: 61085000
- Contained Unit: oz
- Cutoff Grade: 38

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The Probable Mineral Reserve for silver adds substantial contained metal to the project, contributing to its overall scale.

- Positive factor: Good confidence category

- Positive factor: Significant contained metal

Evidence · table

> 46

Context: 41,364

### probable

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-4)

Diablillos · gold

#### Identity

- Project: Diablillos
- Commodity: gold
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Category: probable
- Tonnes: 41364000
- Grade: 0.7
- Grade Unit: g/t
- Contained Metal: 925000
- Contained Unit: oz
- Cutoff Grade: 38

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The Probable Mineral Reserve for gold provides a good confidence estimate of contained gold, enhancing the project's economic profile.

- Positive factor: Good confidence category

- Positive factor: Significant contained metal

Evidence · table

> 0.70

Context: 41,364

### probable

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-5)

Diablillos · silver

#### Identity

- Project: Diablillos
- Commodity: silver
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Category: probable
- Tonnes: 41364000
- Grade: 118
- Grade Unit: g/t
- Contained Metal: 156327000
- Contained Unit: oz
- Cutoff Grade: 38

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The Probable Mineral Reserve for silver equivalent provides a comprehensive good-confidence estimate of total contained metal, with disclosed assumptions for the equivalent calculation.

- Positive factor: Good confidence category

- Positive factor: Significant contained metal

- Positive factor: Metal equivalent disclosed

Evidence · table

> 118

Context: 41,364

### proven\_probable

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-6)

Diablillos · silver

#### Identity

- Project: Diablillos
- Commodity: silver
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Category: proven\_probable
- Tonnes: 77911000
- Grade: 73
- Grade Unit: g/t
- Contained Metal: 183537000
- Contained Unit: oz
- Cutoff Grade: 38

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The total Proven and Probable Mineral Reserve for silver represents a substantial and increased resource base, underpinning the project's long-term production potential.

- Positive factor: Large total reserve

- Positive factor: Significant contained metal

- Positive factor: Increased reserves

Evidence · table

> 73

Context: 77,911

### proven\_probable

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-7)

Diablillos · gold

#### Identity

- Project: Diablillos
- Commodity: gold
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Category: proven\_probable
- Tonnes: 77911000
- Grade: 0.7
- Grade Unit: g/t
- Contained Metal: 1764000
- Contained Unit: oz
- Cutoff Grade: 38

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The total Proven and Probable Mineral Reserve for gold provides a substantial contained gold estimate, significantly contributing to the project's overall value.

- Positive factor: Large total reserve

- Positive factor: Significant contained metal

- Positive factor: Increased reserves

Evidence · table

> 0.70

Context: 77,911

### proven\_probable

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-8)

Diablillos · silver

#### Identity

- Project: Diablillos
- Commodity: silver
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Category: proven\_probable
- Tonnes: 77911000
- Grade: 146
- Grade Unit: g/t
- Contained Metal: 365863000
- Contained Unit: oz
- Cutoff Grade: 38

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The total Proven and Probable Mineral Reserve for silver equivalent represents a very large and increased resource base, with disclosed assumptions, highlighting the project's significant potential.

- Positive factor: Large total reserve

- Positive factor: Significant contained metal

- Positive factor: Increased reserves

- Positive factor: Metal equivalent disclosed

Evidence · table

> 146

Context: 77,911

### Fact 10

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-9)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: USD

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The after-tax NPV5% of $3.0 billion USD at base case prices indicates very strong project economics from the DFS.

- Positive factor: High NPV

- Positive factor: DFS level study

Evidence · table

> $3,003

Context: $4,204

### Fact 11

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-10)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: CAD

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The after-tax NPV5% of CAD$4.2 billion at base case prices indicates very strong project economics from the DFS.

- Positive factor: High NPV

- Positive factor: DFS level study

Evidence · table

> $4,204

Context: $3,003

### Fact 12

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-11)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The after-tax IRR of 41.9% at base case prices demonstrates excellent project profitability.

- Positive factor: High IRR

- Positive factor: DFS level study

Evidence · table

> 41.9%

Context: After-Tax IRR \(%\)

### Fact 13

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-12)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: years

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: A payback period of 1.7 years indicates quick capital recovery, enhancing project attractiveness.

- Positive factor: Rapid payback

- Positive factor: DFS level study

Evidence · table

> 1.7

Context: Payback \(years\)

### Fact 14

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-13)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: USD

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The after-tax NPV5% of $4.8 billion USD at recent spot prices highlights significant upside potential.

- Positive factor: Exceptional NPV at spot prices

- Positive factor: DFS level study

Evidence · table

> $4,799

Context: $6,719

### Fact 15

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-14)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: CAD

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The after-tax NPV5% of CAD$6.7 billion at recent spot prices highlights significant upside potential.

- Positive factor: Exceptional NPV at spot prices

- Positive factor: DFS level study

Evidence · table

> $6,719

Context: $4,799

### Fact 16

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-15)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The after-tax IRR of 56.5% at recent spot prices indicates outstanding project profitability under current market conditions.

- Positive factor: Exceptional IRR at spot prices

- Positive factor: DFS level study

Evidence · table

> 56.5%

Context: After-Tax IRR \(%\)

### Fact 17

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-16)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: years

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: A payback period of 1.4 years at recent spot prices indicates extremely fast capital recovery.

- Positive factor: Very rapid payback at spot prices

- Positive factor: DFS level study

Evidence · table

> 1.4

Context: Payback \(years\)

### Fact 18

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-17)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: x

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The after-tax NPV5% to initial capex ratio of 4.2x demonstrates strong value generation potential relative to investment.

- Positive factor: Strong NPV to Capex ratio

- Positive factor: DFS level study

Evidence · table

> 4.2

Context: After-Tax NPV5% to Initial Capex Ratio \(x\)

### Fact 19

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-18)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: years

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: A 25-year mine life indicates a long-term, sustainable operation.

- Positive factor: Long mine life

Evidence · table

> 25

Context: Life of mine \(LOM\)

### Fact 20

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-19)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: tonnes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The total mineralized material mined of 77.9 M tonnes reflects the large scale of the project.

- Positive factor: Significant total material mined

Evidence · table

> 77.9

Context: Total mineralized material mined

### Fact 21

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-20)

Diablillos · silver

#### Identity

- Project: Diablillos
- Commodity: silver
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: M oz

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: Total recovered silver of 147.4 M oz indicates a very large silver production profile over the mine life.

- Positive factor: High total recovered silver

Evidence · table

> 147.4

Context: Total recovered silver

### Fact 22

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-21)

Diablillos · gold

#### Identity

- Project: Diablillos
- Commodity: gold
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: k oz

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: Total recovered gold of 1,539 k oz represents a significant gold byproduct, adding to project value.

- Positive factor: High total recovered gold

Evidence · table

> 1,539

Context: Total recovered gold

### Fact 23

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-22)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: waste:ore

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: A strip ratio of 5.9:1 is within reasonable bounds for an open pit operation.

Evidence · table

> 5.9:1

Context: Strip ratio \(excludes pre-stripping\)

### Fact 24

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-23)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: tpd

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: A throughput of 9,000 tpd indicates a substantial processing capacity for the project.

- Positive factor: High throughput capacity

Evidence · table

> 9,000

Context: Throughput

### Fact 25

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-24)

Diablillos · silver

#### Identity

- Project: Diablillos
- Commodity: silver
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: g/t

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The high silver head grade of 177 g/t in the first 5 years supports strong early cash flow and rapid payback.

- Positive factor: High early head grade

- Positive factor: Maximizes early cash flow

Evidence · table

> 177

Context: Head grade – silver \(first 5 years / LOM\)

### Fact 26

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-25)

Diablillos · silver

#### Identity

- Project: Diablillos
- Commodity: silver
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: g/t

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The life-of-mine silver head grade of 73 g/t provides a solid base for long-term production.

- Positive factor: Solid LOM head grade

Evidence · table

> 73

Context: Head grade – silver \(first 5 years / LOM\)

### Fact 27

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-26)

Diablillos · gold

#### Identity

- Project: Diablillos
- Commodity: gold
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: g/t

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The gold head grade of 1.04 g/t in the first 5 years contributes significantly to early cash flow.

- Positive factor: High early head grade

- Positive factor: Maximizes early cash flow

Evidence · table

> 1.04

Context: Head grade – gold \(first 5 years / LOM\)

### Fact 28

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-27)

Diablillos · gold

#### Identity

- Project: Diablillos
- Commodity: gold
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: g/t

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The life-of-mine gold head grade of 0.70 g/t provides a consistent gold contribution over the project's duration.

- Positive factor: Solid LOM head grade

Evidence · table

> 0.70

Context: Head grade – gold \(first 5 years / LOM\)

### Fact 29

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-28)

Diablillos · silver

#### Identity

- Project: Diablillos
- Commodity: silver
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: Silver recovery of 77.8% in the first 5 years is strong for a tank leach operation, contributing to high early production.

- Positive factor: Strong early recovery

Evidence · table

> 77.8

Context: Recoveries – silver \(first 5 years / LOM\)

### Fact 30

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-29)

Diablillos · silver

#### Identity

- Project: Diablillos
- Commodity: silver
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: Life-of-mine silver recovery of 80.3% is strong for a tank leach operation, maximizing metal extraction.

- Positive factor: Strong LOM recovery

Evidence · table

> 80.3

Context: Recoveries – silver \(first 5 years / LOM\)

### Fact 31

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-30)

Diablillos · gold

#### Identity

- Project: Diablillos
- Commodity: gold
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: Gold recovery of 86.1% in the first 5 years is strong for a tank leach operation, contributing to high early production.

- Positive factor: Strong early recovery

Evidence · table

> 86.1

Context: Recoveries – gold \(first 5 years / LOM\)

### Fact 32

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-31)

Diablillos · gold

#### Identity

- Project: Diablillos
- Commodity: gold
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: Life-of-mine gold recovery of 87.3% is strong for a tank leach operation, maximizing metal extraction.

- Positive factor: Strong LOM recovery

Evidence · table

> 87.3

Context: Recoveries – gold \(first 5 years / LOM\)

### Fact 33

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-32)

Diablillos · silver

#### Identity

- Project: Diablillos
- Commodity: silver
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: M oz

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: Average annual silver production of 13.9 M oz in the first 5 years is very high, driving strong early cash flow.

- Positive factor: High early production

- Positive factor: Maximizes early cash flow

Evidence · table

> 13.9

Context: Average Production – silver \(first 5 years / LOM\)

### Fact 34

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-33)

Diablillos · silver

#### Identity

- Project: Diablillos
- Commodity: silver
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: M oz

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: Average annual silver production of 5.9 M oz over the life of mine provides a consistent and significant production profile.

- Positive factor: Solid LOM production

Evidence · table

> 5.9

Context: Average Production – silver \(first 5 years / LOM\)

### Fact 35

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-34)

Diablillos · gold

#### Identity

- Project: Diablillos
- Commodity: gold
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: k oz

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: Average annual gold production of 89 k oz in the first 5 years significantly contributes to early cash flow.

- Positive factor: High early production

- Positive factor: Maximizes early cash flow

Evidence · table

> 89

Context: Average Production – gold \(first 5 years / LOM\)

### Fact 36

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-35)

Diablillos · gold

#### Identity

- Project: Diablillos
- Commodity: gold
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: k oz

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: Average annual gold production of 64 k oz over the life of mine provides a consistent gold contribution.

- Positive factor: Solid LOM production

Evidence · table

> 64

Context: Average Production – gold \(first 5 years / LOM\)

### Fact 37

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-36)

Diablillos · silver

#### Identity

- Project: Diablillos
- Commodity: silver
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: $/oz AgEq

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The very low All-in Sustaining Cash Costs of $19.69/oz AgEq in the first 5 years position Diablillos as a highly competitive, low-cost producer.

- Positive factor: Very low AISC

- Positive factor: Positions project as low-cost producer

Evidence · table

> 19.69

Context: AISC \(LOM\) – silver equivalent \(first 5 years / LOM\)

### Fact 38

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-37)

Diablillos · silver

#### Identity

- Project: Diablillos
- Commodity: silver
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: $/oz AgEq

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The very low All-in Sustaining Cash Costs of $19.98/oz AgEq over the life of mine position Diablillos as a highly competitive, low-cost producer.

- Positive factor: Very low AISC

- Positive factor: Positions project as low-cost producer

Evidence · table

> 19.98

Context: AISC \(LOM\) – silver equivalent \(first 5 years / LOM\)

### Fact 39

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-38)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: USD

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: Initial capital costs of $721.5 million are a key input for project financing and reflect a DFS-level estimate.

- Positive factor: DFS level estimate

Evidence · table

> 721.5

Context: Initial Capital Costs \(from FID to Initial Production\)

### Fact 40

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-39)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: USD

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: Life-of-mine sustaining capital costs of $519.8 million are a significant component of the project's overall financial profile.

- Positive factor: DFS level estimate

Evidence · table

> 519.8

Context: LOM Sustaining Capital \(to be funded from Cash Flows\)

### Fact 41

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-40)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: USD

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: Total capital costs of $1,241.3 million provide a comprehensive view of the project's investment requirements.

- Positive factor: Comprehensive capital estimate

Evidence · table

> 1,241.3

Context: Total Capital Costs

### Fact 42

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-41)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: $/tonne milled

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: The total operating cost of $52.41 per tonne milled over the life of mine indicates competitive operating efficiency.

- Positive factor: Competitive operating costs

Evidence · table

> 52.41

Context: Total Operating Cost

### Fact 43

[Link to this fact](https://atlas-staging.minestarters.com/news/abrasilver-s-definitive-feasibility-study-positions-diablillos-among-the-premier--f9c8246e-0c7c-49e5-88ab-a81d54ae0038#fact-resource-facts-42)

Diablillos

#### Identity

- Project: Diablillos
- Region: argentina
- Reported Region: Argentina
- Ticker: ABRA

#### Resource Data

- Grade Unit: USD

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-06-22T00:00:00.000Z

Reasoning: Closure costs of $74.1 million are a standard component of project economics.

Evidence · table

> 74.1

Context: Closure Costs

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.