AbraSilver's Definitive Feasibility Study Positions Diablillos Among the Premier Undeveloped Silver-Gold Projects Globally with CAD$4.2B After-Tax NPV5% & 42% IRR

Original announcement by tmx on

Company
AbraSilver Resource Corp.
Ticker
ABRA
Exchange
TSX
Region
Argentina
Primary commodity
Silver
Secondary commodities
Gold
Document categories
Resource update, Production
Extracted
2026-08-20 21:40:38 UTC

Analysis by Minestarters Atlas

Minestarters Atlas analysis

Summary

AbraSilver's Definitive Feasibility Study for the Diablillos silver-gold project reveals robust economics, including a CAD$4.2 billion after-tax NPV5% and a 41.9% IRR at base-case metal prices. The study outlines a 25-year mine life with average annual production of 10.3 Moz silver equivalent, supported by increased Proven and Probable Mineral Reserves of 77.9 Mt. Initial capital expenditures are estimated at $721.5 million, with low All-in Sustaining Cash Costs of $20/oz AgEq over the life of mine.

Reasoning: The Definitive Feasibility Study for the Diablillos project demonstrates robust economics with a high after-tax NPV of CAD$4.2 billion and an IRR of 41.9%, coupled with low operating costs and a significant increase in Proven and Probable Mineral Reserves, positioning it as a premier undeveloped silver-gold project.

Positive factors

  • High NPV
  • High IRR
  • Low AISC
  • Increased Proven and Probable Reserves
  • Long LOM
  • Strong production profile
  • QP/CP Signed
  • NI 43-101 Compliant
  • Category Upgrade
  • Tonnage Growth
  • Contained Metal Growth
  • Cut-off Disclosed

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 43

Classification and evidence

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: The document is a Definitive Feasibility Study (DFS) for the Diablillos project.

Evidence · text

“AbraSilver's Definitive Feasibility Study Positions Diablillos Among the Premier Undeveloped Silver-Gold Projects Globally with CAD$4.2B After-Tax NPV5% & 42% IRR”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The Mineral Reserves Estimate is signed off by Mr. Miguel Fuentealba, P. Eng., and other Qualified Persons are listed.

Evidence · text

“The Qualified Person for the Mineral Reserves Estimate is Mr. Miguel Fuentealba, P. Eng.”

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: The Technical Report will be completed in accordance with National Instrument 43-101.

Evidence · text

“The Technical Report will be completed in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101")”

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The document reports Proven Mineral Reserves in Table 6.

Evidence · table

“Proven”

Context: Mineral Reserve (all domains)

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The document reports Probable Mineral Reserves in Table 6.

Evidence · table

“Probable”

Context: Mineral Reserve (all domains)

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: The DFS highlights 'Increased Proven and Probable Mineral Reserves' containing 183 Moz Ag and 1.8 Moz Au (366 Moz AgEq).

Evidence · text

“Increased Proven and Probable Mineral Reserves of 77.9 Mt grading 146 g/t Ag Eq, containing 183 Moz Ag and 1.8 Moz Au (366 Moz AgEq)”

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: The DFS highlights 'Increased Proven and Probable Mineral Reserves of 77.9 Mt'.

Evidence · text

“Increased Proven and Probable Mineral Reserves of 77.9 Mt”

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The Mineral Reserve estimate was based on an equivalent cut-off grade of approximately 38 g/t AgEq.

Evidence · text

“The NVB method matches an equivalent cut-off grade of approximately 38 g/t AgEq.”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The DFS includes an updated Mineral Reserve estimate.

Evidence · text

“The DFS mine plan is based on an updated Mineral Reserve estimate”

Extracted facts

Stored fact records: 43. Some facts used in scoring do not have a stored record.

Resource Estimates (43)

provenDiablillos · silverTonnes: 36547000Grade: 104Grade Unit: g/tContained Metal: 122452000Contained Unit: ozView all details
Link to this fact

Identity

Project
Diablillos
Commodity
silver
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Category
proven
Tonnes
36547000
Grade
104
Grade Unit
g/t
Contained Metal
122452000
Contained Unit
oz
Cutoff Grade
38

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The Proven Mineral Reserve for silver represents a high-confidence estimate with substantial contained metal, contributing significantly to the project's overall value.

Positive factors

  • High confidence category
  • Significant contained metal

Evidence · table

“104”

Context: 36,547

provenDiablillos · goldTonnes: 36547000Grade: 0.71Grade Unit: g/tContained Metal: 840000Contained Unit: ozView all details
Link to this fact

Identity

Project
Diablillos
Commodity
gold
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Category
proven
Tonnes
36547000
Grade
0.71
Grade Unit
g/t
Contained Metal
840000
Contained Unit
oz
Cutoff Grade
38

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The Proven Mineral Reserve for gold provides a high-confidence estimate of contained gold, adding to the project's economic robustness.

Positive factors

  • High confidence category
  • Significant contained metal

Evidence · table

“0.71”

Context: 36,547

provenDiablillos · silverTonnes: 36547000Grade: 178Grade Unit: g/tContained Metal: 209536000Contained Unit: ozView all details
Link to this fact

Identity

Project
Diablillos
Commodity
silver
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Category
proven
Tonnes
36547000
Grade
178
Grade Unit
g/t
Contained Metal
209536000
Contained Unit
oz
Cutoff Grade
38

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The Proven Mineral Reserve for silver equivalent provides a comprehensive high-confidence estimate of total contained metal, with disclosed assumptions for the equivalent calculation.

Positive factors

  • High confidence category
  • Significant contained metal
  • Metal equivalent disclosed

Evidence · table

“178”

Context: 36,547

probableDiablillos · silverTonnes: 41364000Grade: 46Grade Unit: g/tContained Metal: 61085000Contained Unit: ozView all details
Link to this fact

Identity

Project
Diablillos
Commodity
silver
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Category
probable
Tonnes
41364000
Grade
46
Grade Unit
g/t
Contained Metal
61085000
Contained Unit
oz
Cutoff Grade
38

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The Probable Mineral Reserve for silver adds substantial contained metal to the project, contributing to its overall scale.

Positive factors

  • Good confidence category
  • Significant contained metal

Evidence · table

“46”

Context: 41,364

probableDiablillos · goldTonnes: 41364000Grade: 0.7Grade Unit: g/tContained Metal: 925000Contained Unit: ozView all details
Link to this fact

Identity

Project
Diablillos
Commodity
gold
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Category
probable
Tonnes
41364000
Grade
0.7
Grade Unit
g/t
Contained Metal
925000
Contained Unit
oz
Cutoff Grade
38

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The Probable Mineral Reserve for gold provides a good confidence estimate of contained gold, enhancing the project's economic profile.

Positive factors

  • Good confidence category
  • Significant contained metal

Evidence · table

“0.70”

Context: 41,364

probableDiablillos · silverTonnes: 41364000Grade: 118Grade Unit: g/tContained Metal: 156327000Contained Unit: ozView all details
Link to this fact

Identity

Project
Diablillos
Commodity
silver
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Category
probable
Tonnes
41364000
Grade
118
Grade Unit
g/t
Contained Metal
156327000
Contained Unit
oz
Cutoff Grade
38

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The Probable Mineral Reserve for silver equivalent provides a comprehensive good-confidence estimate of total contained metal, with disclosed assumptions for the equivalent calculation.

Positive factors

  • Good confidence category
  • Significant contained metal
  • Metal equivalent disclosed

Evidence · table

“118”

Context: 41,364

proven_probableDiablillos · silverTonnes: 77911000Grade: 73Grade Unit: g/tContained Metal: 183537000Contained Unit: ozView all details
Link to this fact

Identity

Project
Diablillos
Commodity
silver
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Category
proven_probable
Tonnes
77911000
Grade
73
Grade Unit
g/t
Contained Metal
183537000
Contained Unit
oz
Cutoff Grade
38

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The total Proven and Probable Mineral Reserve for silver represents a substantial and increased resource base, underpinning the project's long-term production potential.

Positive factors

  • Large total reserve
  • Significant contained metal
  • Increased reserves

Evidence · table

“73”

Context: 77,911

proven_probableDiablillos · goldTonnes: 77911000Grade: 0.7Grade Unit: g/tContained Metal: 1764000Contained Unit: ozView all details
Link to this fact

Identity

Project
Diablillos
Commodity
gold
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Category
proven_probable
Tonnes
77911000
Grade
0.7
Grade Unit
g/t
Contained Metal
1764000
Contained Unit
oz
Cutoff Grade
38

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The total Proven and Probable Mineral Reserve for gold provides a substantial contained gold estimate, significantly contributing to the project's overall value.

Positive factors

  • Large total reserve
  • Significant contained metal
  • Increased reserves

Evidence · table

“0.70”

Context: 77,911

proven_probableDiablillos · silverTonnes: 77911000Grade: 146Grade Unit: g/tContained Metal: 365863000Contained Unit: ozView all details
Link to this fact

Identity

Project
Diablillos
Commodity
silver
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Category
proven_probable
Tonnes
77911000
Grade
146
Grade Unit
g/t
Contained Metal
365863000
Contained Unit
oz
Cutoff Grade
38

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The total Proven and Probable Mineral Reserve for silver equivalent represents a very large and increased resource base, with disclosed assumptions, highlighting the project's significant potential.

Positive factors

  • Large total reserve
  • Significant contained metal
  • Increased reserves
  • Metal equivalent disclosed

Evidence · table

“146”

Context: 77,911

Fact 10DiablillosGrade Unit: USDView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
USD

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The after-tax NPV5% of $3.0 billion USD at base case prices indicates very strong project economics from the DFS.

Positive factors

  • High NPV
  • DFS level study

Evidence · table

“$3,003”

Context: $4,204

Fact 11DiablillosGrade Unit: CADView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
CAD

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The after-tax NPV5% of CAD$4.2 billion at base case prices indicates very strong project economics from the DFS.

Positive factors

  • High NPV
  • DFS level study

Evidence · table

“$4,204”

Context: $3,003

Fact 12DiablillosGrade Unit: %View all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The after-tax IRR of 41.9% at base case prices demonstrates excellent project profitability.

Positive factors

  • High IRR
  • DFS level study

Evidence · table

“41.9%”

Context: After-Tax IRR (%)

Fact 13DiablillosGrade Unit: yearsView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
years

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: A payback period of 1.7 years indicates quick capital recovery, enhancing project attractiveness.

Positive factors

  • Rapid payback
  • DFS level study

Evidence · table

“1.7”

Context: Payback (years)

Fact 14DiablillosGrade Unit: USDView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
USD

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The after-tax NPV5% of $4.8 billion USD at recent spot prices highlights significant upside potential.

Positive factors

  • Exceptional NPV at spot prices
  • DFS level study

Evidence · table

“$4,799”

Context: $6,719

Fact 15DiablillosGrade Unit: CADView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
CAD

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The after-tax NPV5% of CAD$6.7 billion at recent spot prices highlights significant upside potential.

Positive factors

  • Exceptional NPV at spot prices
  • DFS level study

Evidence · table

“$6,719”

Context: $4,799

Fact 16DiablillosGrade Unit: %View all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The after-tax IRR of 56.5% at recent spot prices indicates outstanding project profitability under current market conditions.

Positive factors

  • Exceptional IRR at spot prices
  • DFS level study

Evidence · table

“56.5%”

Context: After-Tax IRR (%)

Fact 17DiablillosGrade Unit: yearsView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
years

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: A payback period of 1.4 years at recent spot prices indicates extremely fast capital recovery.

Positive factors

  • Very rapid payback at spot prices
  • DFS level study

Evidence · table

“1.4”

Context: Payback (years)

Fact 18DiablillosGrade Unit: xView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
x

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The after-tax NPV5% to initial capex ratio of 4.2x demonstrates strong value generation potential relative to investment.

Positive factors

  • Strong NPV to Capex ratio
  • DFS level study

Evidence · table

“4.2”

Context: After-Tax NPV5% to Initial Capex Ratio (x)

Fact 19DiablillosGrade Unit: yearsView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
years

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: A 25-year mine life indicates a long-term, sustainable operation.

Positive factors

  • Long mine life

Evidence · table

“25”

Context: Life of mine (LOM)

Fact 20DiablillosGrade Unit: tonnesView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
tonnes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The total mineralized material mined of 77.9 M tonnes reflects the large scale of the project.

Positive factors

  • Significant total material mined

Evidence · table

“77.9”

Context: Total mineralized material mined

Fact 21Diablillos · silverGrade Unit: M ozView all details
Link to this fact

Identity

Project
Diablillos
Commodity
silver
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
M oz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: Total recovered silver of 147.4 M oz indicates a very large silver production profile over the mine life.

Positive factors

  • High total recovered silver

Evidence · table

“147.4”

Context: Total recovered silver

Fact 22Diablillos · goldGrade Unit: k ozView all details
Link to this fact

Identity

Project
Diablillos
Commodity
gold
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
k oz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: Total recovered gold of 1,539 k oz represents a significant gold byproduct, adding to project value.

Positive factors

  • High total recovered gold

Evidence · table

“1,539”

Context: Total recovered gold

Fact 23DiablillosGrade Unit: waste:oreView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
waste:ore

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: A strip ratio of 5.9:1 is within reasonable bounds for an open pit operation.

Evidence · table

“5.9:1”

Context: Strip ratio (excludes pre-stripping)

Fact 24DiablillosGrade Unit: tpdView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
tpd

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: A throughput of 9,000 tpd indicates a substantial processing capacity for the project.

Positive factors

  • High throughput capacity

Evidence · table

“9,000”

Context: Throughput

Fact 25Diablillos · silverGrade Unit: g/tView all details
Link to this fact

Identity

Project
Diablillos
Commodity
silver
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
g/t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The high silver head grade of 177 g/t in the first 5 years supports strong early cash flow and rapid payback.

Positive factors

  • High early head grade
  • Maximizes early cash flow

Evidence · table

“177”

Context: Head grade – silver (first 5 years / LOM)

Fact 26Diablillos · silverGrade Unit: g/tView all details
Link to this fact

Identity

Project
Diablillos
Commodity
silver
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
g/t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The life-of-mine silver head grade of 73 g/t provides a solid base for long-term production.

Positive factors

  • Solid LOM head grade

Evidence · table

“73”

Context: Head grade – silver (first 5 years / LOM)

Fact 27Diablillos · goldGrade Unit: g/tView all details
Link to this fact

Identity

Project
Diablillos
Commodity
gold
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
g/t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The gold head grade of 1.04 g/t in the first 5 years contributes significantly to early cash flow.

Positive factors

  • High early head grade
  • Maximizes early cash flow

Evidence · table

“1.04”

Context: Head grade – gold (first 5 years / LOM)

Fact 28Diablillos · goldGrade Unit: g/tView all details
Link to this fact

Identity

Project
Diablillos
Commodity
gold
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
g/t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The life-of-mine gold head grade of 0.70 g/t provides a consistent gold contribution over the project's duration.

Positive factors

  • Solid LOM head grade

Evidence · table

“0.70”

Context: Head grade – gold (first 5 years / LOM)

Fact 29Diablillos · silverGrade Unit: %View all details
Link to this fact

Identity

Project
Diablillos
Commodity
silver
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: Silver recovery of 77.8% in the first 5 years is strong for a tank leach operation, contributing to high early production.

Positive factors

  • Strong early recovery

Evidence · table

“77.8”

Context: Recoveries – silver (first 5 years / LOM)

Fact 30Diablillos · silverGrade Unit: %View all details
Link to this fact

Identity

Project
Diablillos
Commodity
silver
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: Life-of-mine silver recovery of 80.3% is strong for a tank leach operation, maximizing metal extraction.

Positive factors

  • Strong LOM recovery

Evidence · table

“80.3”

Context: Recoveries – silver (first 5 years / LOM)

Fact 31Diablillos · goldGrade Unit: %View all details
Link to this fact

Identity

Project
Diablillos
Commodity
gold
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: Gold recovery of 86.1% in the first 5 years is strong for a tank leach operation, contributing to high early production.

Positive factors

  • Strong early recovery

Evidence · table

“86.1”

Context: Recoveries – gold (first 5 years / LOM)

Fact 32Diablillos · goldGrade Unit: %View all details
Link to this fact

Identity

Project
Diablillos
Commodity
gold
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
%

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: Life-of-mine gold recovery of 87.3% is strong for a tank leach operation, maximizing metal extraction.

Positive factors

  • Strong LOM recovery

Evidence · table

“87.3”

Context: Recoveries – gold (first 5 years / LOM)

Fact 33Diablillos · silverGrade Unit: M ozView all details
Link to this fact

Identity

Project
Diablillos
Commodity
silver
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
M oz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: Average annual silver production of 13.9 M oz in the first 5 years is very high, driving strong early cash flow.

Positive factors

  • High early production
  • Maximizes early cash flow

Evidence · table

“13.9”

Context: Average Production – silver (first 5 years / LOM)

Fact 34Diablillos · silverGrade Unit: M ozView all details
Link to this fact

Identity

Project
Diablillos
Commodity
silver
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
M oz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: Average annual silver production of 5.9 M oz over the life of mine provides a consistent and significant production profile.

Positive factors

  • Solid LOM production

Evidence · table

“5.9”

Context: Average Production – silver (first 5 years / LOM)

Fact 35Diablillos · goldGrade Unit: k ozView all details
Link to this fact

Identity

Project
Diablillos
Commodity
gold
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
k oz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: Average annual gold production of 89 k oz in the first 5 years significantly contributes to early cash flow.

Positive factors

  • High early production
  • Maximizes early cash flow

Evidence · table

“89”

Context: Average Production – gold (first 5 years / LOM)

Fact 36Diablillos · goldGrade Unit: k ozView all details
Link to this fact

Identity

Project
Diablillos
Commodity
gold
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
k oz

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: Average annual gold production of 64 k oz over the life of mine provides a consistent gold contribution.

Positive factors

  • Solid LOM production

Evidence · table

“64”

Context: Average Production – gold (first 5 years / LOM)

Fact 37Diablillos · silverGrade Unit: $/oz AgEqView all details
Link to this fact

Identity

Project
Diablillos
Commodity
silver
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
$/oz AgEq

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The very low All-in Sustaining Cash Costs of $19.69/oz AgEq in the first 5 years position Diablillos as a highly competitive, low-cost producer.

Positive factors

  • Very low AISC
  • Positions project as low-cost producer

Evidence · table

“19.69”

Context: AISC (LOM) – silver equivalent (first 5 years / LOM)

Fact 38Diablillos · silverGrade Unit: $/oz AgEqView all details
Link to this fact

Identity

Project
Diablillos
Commodity
silver
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
$/oz AgEq

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The very low All-in Sustaining Cash Costs of $19.98/oz AgEq over the life of mine position Diablillos as a highly competitive, low-cost producer.

Positive factors

  • Very low AISC
  • Positions project as low-cost producer

Evidence · table

“19.98”

Context: AISC (LOM) – silver equivalent (first 5 years / LOM)

Fact 39DiablillosGrade Unit: USDView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
USD

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: Initial capital costs of $721.5 million are a key input for project financing and reflect a DFS-level estimate.

Positive factors

  • DFS level estimate

Evidence · table

“721.5”

Context: Initial Capital Costs (from FID to Initial Production)

Fact 40DiablillosGrade Unit: USDView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
USD

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: Life-of-mine sustaining capital costs of $519.8 million are a significant component of the project's overall financial profile.

Positive factors

  • DFS level estimate

Evidence · table

“519.8”

Context: LOM Sustaining Capital (to be funded from Cash Flows)

Fact 41DiablillosGrade Unit: USDView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
USD

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: Total capital costs of $1,241.3 million provide a comprehensive view of the project's investment requirements.

Positive factors

  • Comprehensive capital estimate

Evidence · table

“1,241.3”

Context: Total Capital Costs

Fact 42DiablillosGrade Unit: $/tonne milledView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
$/tonne milled

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: The total operating cost of $52.41 per tonne milled over the life of mine indicates competitive operating efficiency.

Positive factors

  • Competitive operating costs

Evidence · table

“52.41”

Context: Total Operating Cost

Fact 43DiablillosGrade Unit: USDView all details
Link to this fact

Identity

Project
Diablillos
Region
argentina
Reported Region
Argentina
Ticker
ABRA

Resource Data

Grade Unit
USD

Review

Needs Review
No
Historical
No

Dates

Event date
2026-06-22T00:00:00.000Z

Reasoning: Closure costs of $74.1 million are a standard component of project economics.

Evidence · table

“74.1”

Context: Closure Costs

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.