# Titanium Mining News in Brazil

Canonical page: https://atlas-staging.minestarters.com/news?commodities=titanium&regions=brazil

Atlas summarizes and classifies mining-industry stories from third-party publishers. Follow each source link for the original reporting.

Results: 6
Returned: 6
Coverage: drill results, resource updates, and metallurgy; primary commodity matching; all time unless dates are supplied.
Region: Brazil (brazil)
Commodity: Titanium (titanium)
Applied filters: {"regions":["brazil"],"commodities":["titanium"],"commodity_scope":"primary","document_types":["drill_results","resource_update","metallurgy"],"document_type_match":"any"}
Sort: published_at desc
Offset: 0; page size: 10




## Resouro Files Technical Report for Tiros Project

- Atlas analysis: [Read analysis](https://atlas-staging.minestarters.com/news/resouro-files-technical-report-for-tiros-project--b0641a85-a88c-49c2-8f88-70561bcaa519) · [Markdown](https://atlas-staging.minestarters.com/news/resouro-files-technical-report-for-tiros-project--b0641a85-a88c-49c2-8f88-70561bcaa519.md)
- Original announcement: 2026-07-30T00:00:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Resouro Strategic Metals Inc. (RSM)
- Original source: [globenewswire](https://www.globenewswire.com/news-release/2026/07/30/3335706/0/en/resouro-files-technical-report-for-tiros-project.html)
- Atlas sentiment: 0.319
- Atlas tags: NI 43-101 Compliant, Inferred Resource, QP/CP Signed

Resouro Strategic Metals has filed a NI 43-101 compliant technical report and Preliminary Economic Assessment (PEA) for the Tiros Project in Brazil. The report supports a staged development strategy starting with a high-grade operation and outlines a massive 1.4 billion tonne Measured and Indicated resource.

## Resouro Strategic Metals Inc. (RSGOF) Supplementary Information on Tiros Project PEA

- Atlas analysis: [Read analysis](https://atlas-staging.minestarters.com/news/resouro-strategic-metals-inc-rsgof-supplementary-information-on-tiros-project-pe--68cb462e-bc93-4ad4-bfe6-ccba6dbbb0be) · [Markdown](https://atlas-staging.minestarters.com/news/resouro-strategic-metals-inc-rsgof-supplementary-information-on-tiros-project-pe--68cb462e-bc93-4ad4-bfe6-ccba6dbbb0be.md)
- Original announcement: 2026-06-17T03:47:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Resouro Strategic Metals Inc. (RSM)
- Original source: [tmx](https://money.tmx.com/en/quote/RSM/news/5117224940183694/resouro-strategic-metals-inc-rsgof-supplementary-information-on-tiros-project-pe)
- Atlas sentiment: 0.232
- Atlas tags: PEA-Supporting, Bench Scale Only

Resouro Strategic Metals Inc. has released supplementary technical details for its Tiros Titanium and Rare Earth Project PEA. The update details a 20-year mine life with a 500,000 tpa production target, underpinned by 99.2% Measured and Indicated resources.

## Resouro Strategic Metals Inc. (RSGOF) Presentation: Delivering Robust PEA for Tiros Titanium and Rare Earth Project

- Atlas analysis: [Read analysis](https://atlas-staging.minestarters.com/news/resouro-strategic-metals-inc-rsgof-presentation-delivering-robust-pea-for-tiros--15af3ff2-4fef-4e42-b30f-5f60725cf4d3) · [Markdown](https://atlas-staging.minestarters.com/news/resouro-strategic-metals-inc-rsgof-presentation-delivering-robust-pea-for-tiros--15af3ff2-4fef-4e42-b30f-5f60725cf4d3.md)
- Original announcement: 2026-06-17T01:12:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Resouro Strategic Metals Inc. (RSM)
- Original source: [tmx](https://money.tmx.com/en/quote/RSM/news/7648001238103078/resouro-strategic-metals-inc-rsgof-presentation-delivering-robust-pea-for-tiros-)
- Atlas sentiment: 0.727
- Atlas tags: Maiden Resource, QP/CP Signed

Resouro Strategic Metals Inc. has released a Preliminary Economic Assessment (PEA) for its Tiros Titanium and Rare Earth Project in Brazil. The PEA highlights a 500,000 tpa starter operation with a post-tax NPV of US$714.9 million and a 44.2% IRR, supported by a 1.4 billion tonne Measured and Indicated resource.

## Resouro Strategic Metals Inc. (RSGOF) PEA milestone for Tiros Project

- Atlas analysis: [Read analysis](https://atlas-staging.minestarters.com/news/resouro-strategic-metals-inc-rsgof-pea-milestone-for-tiros-project--03797841-0b45-4ab3-aec3-e6a5a608b276) · [Markdown](https://atlas-staging.minestarters.com/news/resouro-strategic-metals-inc-rsgof-pea-milestone-for-tiros-project--03797841-0b45-4ab3-aec3-e6a5a608b276.md)
- Original announcement: 2026-06-15T00:32:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Resouro Strategic Metals Inc. (RSM)
- Original source: [tmx](https://money.tmx.com/en/quote/RSM/news/5479877972402057/resouro-strategic-metals-inc-rsgof-pea-milestone-for-tiros-project)
- Atlas sentiment: 0.478
- Atlas tags: NI 43-101 Compliant, Inferred Resource

Resouro Strategic Metals has completed a Preliminary Economic Assessment (PEA) for its Tiros Project in Brazil, projecting a high-grade starter operation. The PEA indicates an after-tax NPV of US$714.9 million and an IRR of 44.2%, targeting a 20-year mine life.

## Resouro Strategic Metals Inc. (RSGOF) Metallurgical Testwork & PEA Update - Tiros Project

- Atlas analysis: [Read analysis](https://atlas-staging.minestarters.com/news/resouro-strategic-metals-inc-rsgof-metallurgical-testwork-pea-update-tiros-proje--2563661c-84bd-494a-a11e-1e271020c482) · [Markdown](https://atlas-staging.minestarters.com/news/resouro-strategic-metals-inc-rsgof-metallurgical-testwork-pea-update-tiros-proje--2563661c-84bd-494a-a11e-1e271020c482.md)
- Original announcement: 2026-03-02T01:34:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Resouro Strategic Metals Inc. (RSM)
- Original source: [tmx](https://money.tmx.com/en/quote/RSM/news/4787264014047886/resouro-strategic-metals-inc-rsgof-metallurgical-testwork-pea-update-tiros-proje)
- Atlas sentiment: 0.228
- Atlas tags: Mill Route, Refractory Ore

Resouro Strategic Metals reported metallurgical testwork results for the Tiros Project, showing high TREO and TiO2 recoveries using a fine particle flowsheet. The company is currently optimizing beneficiation to reduce high sulphuric acid consumption and is considering pausing the PEA update until these optimizations are complete.

## Resouro Strategic Metals Inc. (RSGOF) Selects Flowsheet for Tiros PEA

- Atlas analysis: [Read analysis](https://atlas-staging.minestarters.com/news/resouro-strategic-metals-inc-rsgof-selects-flowsheet-for-tiros-pea--d0da84b1-70dd-47de-b174-5b8b2e0963aa) · [Markdown](https://atlas-staging.minestarters.com/news/resouro-strategic-metals-inc-rsgof-selects-flowsheet-for-tiros-pea--d0da84b1-70dd-47de-b174-5b8b2e0963aa.md)
- Original announcement: 2025-11-26T23:03:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: Resouro Strategic Metals Inc. (RSM)
- Original source: [tmx](https://money.tmx.com/en/quote/RSM/news/5198220861319847/resouro-strategic-metals-inc-rsgof-selects-flowsheet-for-tiros-pea)
- Atlas sentiment: 0.226
- Atlas tags: Mill Route

Resouro Strategic Metals has selected a metallurgical flowsheet for its Tiros Titanium and Rare Earth Elements Project in Brazil to support an upcoming Preliminary Economic Assessment (PEA). The flowsheet utilizes a combination of conventional technologies to produce titanium dioxide and rare earth sulfates, with further confirmation testing currently underway at SGS Lakefield.

# Atlas tag definitions

- **Bonanza Intercept:** Exceptionally high-grade zone, well above the deposit-type norm.
- **True Width Disclosed:** Actual thickness perpendicular to structure is stated, not just downhole length.
- **Step-Out Extension:** Mineralization extended beyond the previously known limit.
- **QA/QC Disclosed:** Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
- **Compositing Transparent:** Cut-off grade and internal dilution rules are clearly stated for reported intervals.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Apparent Width Only:** Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
- **Stale Data Re-release:** Historical results re-announced with no new assays or reinterpretation — low genuine novelty.
- **No QA/QC Disclosure:** Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
- **Metal Equivalent Opaque:** Metal equivalent grade reported without disclosing the price, recovery, or payability assumptions used.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Deleterious Elements Present:** Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
- **Infill Drilling:** Confirmatory drilling to raise resource confidence, not new discovery.
- **Nearology Play:** Value premise rests on proximity to a known deposit rather than own results.
- **Measured Resource:** Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
- **Indicated Resource:** Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
- **Proven Reserve:** Measured Resource with demonstrated economic viability after applying modifying factors.
- **Probable Reserve:** Indicated Resource with demonstrated economic viability after applying modifying factors.
- **Category Upgrade:** Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.
- **Tonnage Growth:** Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
- **Grade Improvement:** Average resource grade improved vs prior estimate — better deposit economics.
- **Contained Metal Growth:** True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
- **QP/CP Signed:** Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
- **Cut-off Disclosed:** Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
- **JORC Compliant:** Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
- **NI 43-101 Compliant:** Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
- **Inferred Resource:** Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
- **All Inferred:** 100% of resource is Inferred category — very early stage, no engineering confidence.
- **Grade Decline:** Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.
- **Tonnage Decline:** Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.
- **Category Downgrade:** Resource confidence decreased — Measured downgraded to Indicated, or Indicated to Inferred. Unusual and concerning.
- **Contained Metal Decline:** Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.
- **Dilutive Growth:** Tonnage increased but contained metal flat or down — likely from lower cut-off grade, not geological expansion.
- **Cut-off Lowered:** Cut-off grade significantly reduced vs prior estimate — tonnage growth may be artificial inflation.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Historical Estimate Only:** Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.
- **Stale Estimate:** Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
- **No Contained Metal:** Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
- **No QP/CP Disclosure:** No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
- **Maiden Resource:** First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.
- **Resource Update:** Revised estimate for an existing resource — compare to prior to assess progress.
- **PEA-Supporting:** Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
- **PFS-Supporting:** Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
- **DFS-Supporting:** Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
- **High Recovery:** Recovery at or above the exceptional band for the commodity and processing route.
- **Pilot Scale Complete:** Pilot or demonstration plant testing completed under continuous operation.
- **Free Milling:** Simple, clean ore amenable to standard processing without oxidation.
- **Multi-Domain Tested:** Variability across ore domains (oxide, transition, fresh) has been addressed.
- **Recovery Improving:** Recovery improved versus a like-for-like prior test program on the same domain and route.
- **Low Recovery:** Recovery below the weak band for the commodity and processing route.
- **Bench Scale Only:** Only preliminary bench tests completed — no locked-cycle or pilot work.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Single Domain Only:** Testing limited to one composite or domain — representativeness not established.
- **Recovery Stagnant:** No improvement across multiple test programs on comparable material.
- **Theoretical Recovery Only:** Only theoretical or liberation-derived recovery reported, with no actual test result.
- **Heap Leach Route:** Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
- **Mill Route:** Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
- **Gravity Route:** Gravity separation forms a material part of the flowsheet.
- **POX/BIOX Route:** Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
- **Byproduct Commodity:** The tested commodity is a byproduct rather than the primary economic driver.
