# Graphite Mining News in Uganda

Canonical page: https://atlas-staging.minestarters.com/news?commodities=graphite&regions=uganda

Atlas summarizes and classifies mining-industry stories from third-party publishers. Follow each source link for the original reporting.

Results: 2
Returned: 2
Coverage: drill results, resource updates, and metallurgy; primary commodity matching; all time unless dates are supplied.
Region: Uganda (uganda)
Commodity: Graphite (graphite)
Applied filters: {"regions":["uganda"],"commodities":["graphite"],"commodity_scope":"primary","document_types":["drill_results","resource_update","metallurgy"],"document_type_match":"any"}
Sort: published_at desc
Offset: 0; page size: 10




## Blencowe names interim CEO as Orom-Cross funding drive advances

- Atlas analysis: [Read analysis](https://atlas-staging.minestarters.com/news/blencowe-names-interim-ceo-as-orom-cross-funding-drive-advances--b2906633-1de6-4b0a-a21c-4e30e9b4b6e9) · [Markdown](https://atlas-staging.minestarters.com/news/blencowe-names-interim-ceo-as-orom-cross-funding-drive-advances--b2906633-1de6-4b0a-a21c-4e30e9b4b6e9.md)
- Original announcement: 2026-09-21T12:33:00.000Z
- Atlas analysis published: 2026-09-21T16:34:15.470Z
- Atlas analysis updated: 2026-09-21T16:34:15.470Z
- Company: Blencowe Resource
- Original source: [miningweekly](https://www.miningweekly.com/article/blencowe-names-interim-ceo-as-orom-cross-funding-drive-advances-2026-09-21)
- Atlas sentiment: 0.218
- Atlas tags: Resource Update

Blencowe Resource has appointed COO Iain Wearing as interim CEO to lead the Orom-Cross graphite project in Uganda through its Phase 1 funding and construction stages. The company is actively pursuing project-level financing and commercial agreements, supported by a DFS valuation of $1.2 billion.

## Strategic and Corporate Update

- Atlas analysis: [Read analysis](https://atlas-staging.minestarters.com/news/strategic-and-corporate-update--8317c909-ba35-493d-824b-9fe6b71fbaee) · [Markdown](https://atlas-staging.minestarters.com/news/strategic-and-corporate-update--8317c909-ba35-493d-824b-9fe6b71fbaee.md)
- Original announcement: 2026-09-21T05:00:08.000Z
- Atlas analysis published: 2026-09-21T14:17:51.918Z
- Atlas analysis updated: 2026-09-21T14:17:51.918Z
- Company: Blencowe Resources Plc (BRES)
- Original source: [lse](https://www.londonstockexchange.com/news-article/BRES/strategic-and-corporate-update/17795315)
- Atlas sentiment: 0.221
- Atlas tags: Resource Update

Blencowe Resources has appointed Iain Wearing as Interim CEO to oversee the Orom-Cross Graphite Project during its transition toward Phase 1 construction. The company is actively pursuing project-level funding for the US$45 million Phase 1 CAPEX and continues to demonstrate high-purity graphite performance in aerospace and defence applications.

# Atlas tag definitions

- **Bonanza Intercept:** Exceptionally high-grade zone, well above the deposit-type norm.
- **True Width Disclosed:** Actual thickness perpendicular to structure is stated, not just downhole length.
- **Step-Out Extension:** Mineralization extended beyond the previously known limit.
- **QA/QC Disclosed:** Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
- **Compositing Transparent:** Cut-off grade and internal dilution rules are clearly stated for reported intervals.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Apparent Width Only:** Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
- **Stale Data Re-release:** Historical results re-announced with no new assays or reinterpretation — low genuine novelty.
- **No QA/QC Disclosure:** Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
- **Metal Equivalent Opaque:** Metal equivalent grade reported without disclosing the price, recovery, or payability assumptions used.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Deleterious Elements Present:** Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
- **Infill Drilling:** Confirmatory drilling to raise resource confidence, not new discovery.
- **Nearology Play:** Value premise rests on proximity to a known deposit rather than own results.
- **Measured Resource:** Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
- **Indicated Resource:** Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
- **Proven Reserve:** Measured Resource with demonstrated economic viability after applying modifying factors.
- **Probable Reserve:** Indicated Resource with demonstrated economic viability after applying modifying factors.
- **Category Upgrade:** Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.
- **Tonnage Growth:** Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
- **Grade Improvement:** Average resource grade improved vs prior estimate — better deposit economics.
- **Contained Metal Growth:** True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
- **QP/CP Signed:** Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
- **Cut-off Disclosed:** Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
- **JORC Compliant:** Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
- **NI 43-101 Compliant:** Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
- **Inferred Resource:** Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
- **All Inferred:** 100% of resource is Inferred category — very early stage, no engineering confidence.
- **Grade Decline:** Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.
- **Tonnage Decline:** Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.
- **Category Downgrade:** Resource confidence decreased — Measured downgraded to Indicated, or Indicated to Inferred. Unusual and concerning.
- **Contained Metal Decline:** Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.
- **Dilutive Growth:** Tonnage increased but contained metal flat or down — likely from lower cut-off grade, not geological expansion.
- **Cut-off Lowered:** Cut-off grade significantly reduced vs prior estimate — tonnage growth may be artificial inflation.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Historical Estimate Only:** Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.
- **Stale Estimate:** Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
- **No Contained Metal:** Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
- **No QP/CP Disclosure:** No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
- **Maiden Resource:** First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.
- **Resource Update:** Revised estimate for an existing resource — compare to prior to assess progress.
- **PEA-Supporting:** Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
- **PFS-Supporting:** Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
- **DFS-Supporting:** Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
- **High Recovery:** Recovery at or above the exceptional band for the commodity and processing route.
- **Pilot Scale Complete:** Pilot or demonstration plant testing completed under continuous operation.
- **Free Milling:** Simple, clean ore amenable to standard processing without oxidation.
- **Multi-Domain Tested:** Variability across ore domains (oxide, transition, fresh) has been addressed.
- **Recovery Improving:** Recovery improved versus a like-for-like prior test program on the same domain and route.
- **Low Recovery:** Recovery below the weak band for the commodity and processing route.
- **Bench Scale Only:** Only preliminary bench tests completed — no locked-cycle or pilot work.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Single Domain Only:** Testing limited to one composite or domain — representativeness not established.
- **Recovery Stagnant:** No improvement across multiple test programs on comparable material.
- **Theoretical Recovery Only:** Only theoretical or liberation-derived recovery reported, with no actual test result.
- **Heap Leach Route:** Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
- **Mill Route:** Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
- **Gravity Route:** Gravity separation forms a material part of the flowsheet.
- **POX/BIOX Route:** Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
- **Byproduct Commodity:** The tested commodity is a byproduct rather than the primary economic driver.
