# Gold Mining News in TüRkiye

Canonical page: https://atlas-staging.minestarters.com/news?commodities=gold&regions=t%C3%BCrkiye

Atlas summarizes and classifies mining-industry stories from third-party publishers. Follow each source link for the original reporting.

Results: 4
Returned: 4
Coverage: drill results, resource updates, and metallurgy; primary commodity matching; all time unless dates are supplied.
Region: TüRkiye (türkiye)
Commodity: Gold (gold)
Applied filters: {"regions":["türkiye"],"commodities":["gold"],"commodity_scope":"primary","document_types":["drill_results","resource_update","metallurgy"],"document_type_match":"any"}
Sort: published_at desc
Offset: 0; page size: 10




## ACG buys nearby gold prospect to feed Gediktepe plant in T&uuml;rkiye

- Atlas analysis: [Read analysis](https://atlas-staging.minestarters.com/news/acg-buys-nearby-gold-prospect-to-feed-gediktepe-plant-in-t-uuml-rkiye--1b6c6920-20dc-436f-8a2f-d6250a08fcbe) · [Markdown](https://atlas-staging.minestarters.com/news/acg-buys-nearby-gold-prospect-to-feed-gediktepe-plant-in-t-uuml-rkiye--1b6c6920-20dc-436f-8a2f-d6250a08fcbe.md)
- Original announcement: 2026-09-07T14:31:39.262Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: ACG Metals
- Original source: [miningweekly](https://www.miningweekly.com/article/acg-buys-nearby-gold-prospect-to-feed-gediktepe-plant-in-trkiye-2026-09-07)
- Atlas sentiment: 0.441
- Atlas tags: Maiden Resource, Inferred Resource, Heap Leach Route, Mill Route

ACG Metals has entered a binding agreement to acquire 100% of the Keşkek gold project in Türkiye from Meta Nikel Kobalt for $4 million plus contingent payments. The project is expected to provide oxide ore to feed ACG's Gediktepe heap leach facility, extending its utilization.

## 02:10 ET ACG to Acquire Keşkek Licence to Extend Gold Production ACG Metals Limited ("ACG" or the "Company") is pleased to announce it has entered into a binding agreement with Meta Nikel Kobalt Madencilik Sanayi...

- Atlas analysis: [Read analysis](https://atlas-staging.minestarters.com/news/02-10-et-acg-to-acquire-kes-kek-licence-to-extend-gold-production-acg-metals-lim--1f803b7f-23bb-46ec-af9f-2f2d7adba1a3) · [Markdown](https://atlas-staging.minestarters.com/news/02-10-et-acg-to-acquire-kes-kek-licence-to-extend-gold-production-acg-metals-lim--1f803b7f-23bb-46ec-af9f-2f2d7adba1a3.md)
- Original announcement: 2026-09-07T07:45:42.315Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: ACG Metals Limited (ACG)
- Original source: [prnewswire](https://www.prnewswire.com/news-releases/acg-to-acquire-kekek-licence-to-extend-gold-production-302870901.html)
- Atlas sentiment: 0.441
- Atlas tags: Resource Update, Infill Drilling, Heap Leach Route, Mill Route, Single Domain Only

ACG Metals Limited has entered a binding agreement to acquire the Keşkek gold project in Türkiye for an initial US$4 million plus contingent payments. The acquisition is expected to extend the life of ACG's Gediktepe heap leach facility by providing a nearby source of oxide ore.

## SSR Mining Announces Results of the Hod Maden Technical Report Summary With $1.66B NPV5% and 39% IRR

- Atlas analysis: [Read analysis](https://atlas-staging.minestarters.com/news/ssr-mining-announces-results-of-the-hod-maden-technical-report-summary-with-1-66--f2e3938f-4f1a-4ecc-b4c1-3dce3802a42c) · [Markdown](https://atlas-staging.minestarters.com/news/ssr-mining-announces-results-of-the-hod-maden-technical-report-summary-with-1-66--f2e3938f-4f1a-4ecc-b4c1-3dce3802a42c.md)
- Original announcement: 2026-01-29T23:00:00.000Z
- Atlas analysis published: Unknown date
- Atlas analysis updated: Unknown date
- Company: SSR Mining Inc. (SSRM)
- Original source: [tmx](https://money.tmx.com/en/quote/SSRM/news/6296503417508701/ssr-mining-announces-results-of-the-hod-maden-technical-report-summary-with-1-66)
- Atlas sentiment: 0.473
- Atlas tags: NI 43-101 Compliant, QP/CP Signed, DFS-Supporting, High Recovery, Mill Route, Free Milling, Category Upgrade, Measured Resource, Indicated Resource, Proven Reserve, Probable Reserve

SSR Mining announced a highly positive Technical Report Summary for its Hod Maden project in Türkiye, showcasing an estimated after-tax NPV5% of $1.66 billion and an IRR of 39%. The project is projected to produce 1.6 million ounces of gold and 209 million pounds of copper over its life, with strong metallurgical recoveries of 87% for gold and 97% for copper. Significant de-risking efforts, including detailed engineering and contract tendering, have been completed, positioning Hod Maden as a world-class copper-gold project.

## Gediktepe Enriched Ore Treatment Project & Proposed Fundraise

- Atlas analysis: [Read analysis](https://atlas-staging.minestarters.com/news/gediktepe-enriched-ore-treatment-project-proposed-fundraise--28d606ef-8c2f-462f-a2db-cb1f9f575f66) · [Markdown](https://atlas-staging.minestarters.com/news/gediktepe-enriched-ore-treatment-project-proposed-fundraise--28d606ef-8c2f-462f-a2db-cb1f9f575f66.md)
- Original announcement: 2025-11-11T18:27:00.000Z
- Atlas analysis published: 2026-09-20T20:05:05.626Z
- Atlas analysis updated: 2026-09-20T20:05:05.626Z
- Company: ACG Metals Limited (ACG)
- Original source: [yahoo_press](https://finance.yahoo.com/news/gediktepe-enriched-ore-treatment-project-182700557.html)
- Atlas sentiment: 0.456
- Atlas tags: Mill Route, Single Domain Only

ACG Metals Limited has completed a scoping level study for the Gediktepe Enriched Ore Treatment Project in Türkiye. The project involves constructing a new SART plant to process existing stockpiles and enriched ore to produce gold, silver, copper, and zinc.

# Atlas tag definitions

- **Bonanza Intercept:** Exceptionally high-grade zone, well above the deposit-type norm.
- **True Width Disclosed:** Actual thickness perpendicular to structure is stated, not just downhole length.
- **Step-Out Extension:** Mineralization extended beyond the previously known limit.
- **QA/QC Disclosed:** Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
- **Compositing Transparent:** Cut-off grade and internal dilution rules are clearly stated for reported intervals.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Apparent Width Only:** Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
- **Stale Data Re-release:** Historical results re-announced with no new assays or reinterpretation — low genuine novelty.
- **No QA/QC Disclosure:** Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
- **Metal Equivalent Opaque:** Metal equivalent grade reported without disclosing the price, recovery, or payability assumptions used.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Deleterious Elements Present:** Penalty elements (arsenic, antimony, etc.) or refractory concerns noted in the release.
- **Infill Drilling:** Confirmatory drilling to raise resource confidence, not new discovery.
- **Nearology Play:** Value premise rests on proximity to a known deposit rather than own results.
- **Measured Resource:** Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
- **Indicated Resource:** Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
- **Proven Reserve:** Measured Resource with demonstrated economic viability after applying modifying factors.
- **Probable Reserve:** Indicated Resource with demonstrated economic viability after applying modifying factors.
- **Category Upgrade:** Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.
- **Tonnage Growth:** Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
- **Grade Improvement:** Average resource grade improved vs prior estimate — better deposit economics.
- **Contained Metal Growth:** True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
- **QP/CP Signed:** Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
- **Cut-off Disclosed:** Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
- **JORC Compliant:** Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
- **NI 43-101 Compliant:** Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
- **Inferred Resource:** Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
- **All Inferred:** 100% of resource is Inferred category — very early stage, no engineering confidence.
- **Grade Decline:** Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.
- **Tonnage Decline:** Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.
- **Category Downgrade:** Resource confidence decreased — Measured downgraded to Indicated, or Indicated to Inferred. Unusual and concerning.
- **Contained Metal Decline:** Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.
- **Dilutive Growth:** Tonnage increased but contained metal flat or down — likely from lower cut-off grade, not geological expansion.
- **Cut-off Lowered:** Cut-off grade significantly reduced vs prior estimate — tonnage growth may be artificial inflation.
- **Cut-off Undisclosed:** Cut-off grade not disclosed — cannot assess comparability to prior estimates or peers.
- **Historical Estimate Only:** Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.
- **Stale Estimate:** Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
- **No Contained Metal:** Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
- **No QP/CP Disclosure:** No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
- **Maiden Resource:** First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.
- **Resource Update:** Revised estimate for an existing resource — compare to prior to assess progress.
- **PEA-Supporting:** Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
- **PFS-Supporting:** Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
- **DFS-Supporting:** Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
- **High Recovery:** Recovery at or above the exceptional band for the commodity and processing route.
- **Pilot Scale Complete:** Pilot or demonstration plant testing completed under continuous operation.
- **Free Milling:** Simple, clean ore amenable to standard processing without oxidation.
- **Multi-Domain Tested:** Variability across ore domains (oxide, transition, fresh) has been addressed.
- **Recovery Improving:** Recovery improved versus a like-for-like prior test program on the same domain and route.
- **Low Recovery:** Recovery below the weak band for the commodity and processing route.
- **Bench Scale Only:** Only preliminary bench tests completed — no locked-cycle or pilot work.
- **Refractory Ore:** Complex mineralogy requiring oxidation or other special processing before recovery.
- **Single Domain Only:** Testing limited to one composite or domain — representativeness not established.
- **Recovery Stagnant:** No improvement across multiple test programs on comparable material.
- **Theoretical Recovery Only:** Only theoretical or liberation-derived recovery reported, with no actual test result.
- **Heap Leach Route:** Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
- **Mill Route:** Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
- **Gravity Route:** Gravity separation forms a material part of the flowsheet.
- **POX/BIOX Route:** Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
- **Byproduct Commodity:** The tested commodity is a byproduct rather than the primary economic driver.
